Uncategorized

Oldham County Environmental Authority Covered Bridge Wastewater Treatment Plant Decommissioning

Oldham County Environmental Authority Covered Bridge Wastewater Treatment Plant Decommissioning

The Oldham County Environmental Authority Covered Bridge Wastewater Treatment Plant Decommissioning project includes construction of new facilities and upgrades to one existing wastewater pump station. New construction and upgrades include one (1) concrete wet well; one (1) concrete valve vault; one (1) emergency generator; two (2) pumps, including level control floats, guiderails, pump bases, discharge piping and valves; two (2) pumps, including guiderails and pump bases; associated yard piping, electrical, site work, paving, and demolition, removal, and hauling of existing equipment; and temporary bypass pumping and power. A 6-inch diameter pressure pipeline, approximately 2270 feet long, will be constructed from the Covered Bridge Wastewater Treatment Plant to the Albrecht Drive Lift Station. An 8-inch diameter pressure pipeline, approximately 2210 feet long, will be constructed near Crosshill Court Lift Station.

LaGrange, KY

Click Here to Order

Panagia Pantovasilissa Greek Orthodox Church Burchfield Thomas

Panagia Pantovasilissa Greek Orthodox Church Burchfield Thomas

3001 Tates Creek Road
Lexington, KY

Click here to order

Recoat Repair Big Blue Elevated Water Storage Tank

Recoat Repair Big Blue Elevated Water Storage Tank

Recoat repair one-one million gallon elevated water storage tank, replace an existing altitude valve with an electrically operated butterfly valve, minor coatings repairs to one 400,000 gallon hydropillar water storage tank.

Richmond KY

click here to order

Contract 9 Sanitary Sewer Improvements Manhole and Pump Station Rehabilitation

Contract 9 Sanitary Sewer Improvements Manhole and Pump Station Rehabilitation

The program of work for which bidgs are to be submitted conists of the rehabilitation of 3 sewer pumping stations, replacement of 1 sewer pumping station, replacement of approximately 3,400 L.F. of 10-inch gravity sewer using pipe bursting method and rehabilitation of 87 four foot diameter manholes, including all related appurtenances as shown on the Drawings and described in the Specifications for the sewage collection system for the City of Louisa Kentucky.

Louisa, KY

click here to order

Haggin Field Honors Housing Bid Package 2

Haggin Field Honors Housing Bid Package 2

Note: The descriptions that follow are provided for general reference/understanding only. The specific scope of work to be provided shall be described in the Contract Documents and individual Bid Forms.

Haggin Field Honors Housing is a new 600 bed dorm located on University of Kentucky’s campus next to the existing Haggin Hall. The new dorm will be approximately 160,000 sf comprised of 2 buildings that are 4 stories. The south building will have a wing that will consist of approximately 7800 sf basement. It will be a wood framed structure with floor and roof trusses. The bedrooms will be in a suite style with 4 beds sharing a common bath. the exterior facade consists of brick and aluminum storefronts. Site improvements include new site utilities and a plaza between the buildings.

Bid Package 2 includes the remaining scopes of work that have not been previously bid as part of Bid Package 1 or Request for Proposal 1 for the Haggin Field Honors Housing. The scopes of work that were previously bid were: Fire Protection, Mechanical, Electrical, Excavation and Site Utilities, Foundations, and Elevator.

Work Categories Bidding on May 17, 2012 @ 1pm
WC02-C Precast Planks

Work Categories Bidding on June 5, 2012 @ 1pm
WC02-A General Trades (by Messer)
WC02-B Gypcrete Underlayment
WC02-D Masonry
WC02-E Structural and Miscellanious Steel
WC02-F Wood Framing Labor
WC02-G Wood Framing Material
WC02-H Finish Carpentry
WC02-J Roofing
WC02-K Fireproofing
WC02-L Joint Sealants
WC02-L Fireproofing
WC02-M Doors/Frames/Hardware
WC02-N Windows
WC02-P Aluminum Storefornt/Curtainwall/Glazing
WC02-Q Drywall and Ceilings
WC02-R Painting
WC02-S Miscellaneous Specialties
WC02-T Window Treatments
WC02-U Communications
WC02-V Security
WC02-W Landscaping

Lexington, KY

Click here to order

TARC Union Station Entry Door Restoration & Replacement

TARC Union Station Entry Door Restoration & Replacement

Louisville, Ky

Click Here to Order

Runway End Identifier Lights for Taylor Co Airport

Runway End Identifier Lights for Taylor Co Airport

To furnish all labor, materials, and equipment and performing all work necessary to Runway 5-23 REILs Project.

Campbellsville, Ky

Click Here to Order

Runway Edge Drains for the Taylor County Airport

Runway Edge Drains for the Taylor County Airport

To furnish all labor, materials, and equipment and performing all work necessary to Runway 5-23 Edge Drains Project.

Campbellsville, Ky

Click Here to Order

West Blue Lick Road Water Main Replacement

West Blue Lick Road Water Main Replacement

Louisville Water Company is requesting Bids for the installation of 1,030 linear feet of 12-inch PVC water main along West Blue Lick Road between 2792 West Blue Lick Road and 2946 West Blue Lick Road. Also included with the project is the installation of 2 fire hydrants, the transfer/renewal of 11 customer services, and 1 meter exchange.

Louisville, KY

Click Here to Order

Panagia Pantovasilissa Greek Orthodox Church

Panagia Pantovasilissa Greek Orthodox Church

Panagia Pantovasilissa Greek Orthodox Church

3001 Tates Creek Road
Lexington, KY

Bids to Reece-Campbell
Attn: Nate Thamann
320 S Wayne Ave
Cincinnati, OH 45215
513-546-4600

Click Here to Order

Northern Elementary School Roof Repair

Northern Elementary School Roof Repair

The work includes the tear off of existing roof memebranes, roof insulation, sheet metal, metal counter flashing and components as indicated. Install new rigid insulation and tapered insulation and SBS- Modified Bituminous Membrane System at metal deck areas. Install SBS- Modified Bituminous Membrane System over rigid insulation at lightweight concrete fill, as indicated and all metal components.

Lexington, KY

Click Here to Order

Morton Middle School Roof Repair

Morton Middle School Roof Repair

The work includes repair of the existing clay tile roof. Replace all broken clay tiles and re-secure loose clay tiles. Apply underlayment to ridge and hip stringers. Re-flash two (2) chimneys and copula. Re-finish windows in the cupola.

Lexington, KY

Click Here to Order

RFB-246-12 Bond Forfeiture Group III MAD 12

RFB-246-12
The Division of Abandoned Mine Lands wishes to receive bids to perform reclamation work on approximately 20 acres of mine land in Ohio County, Kentucky. The work will consist of earthwork, gradework, and revegetation of 1 bond forfeiture permit. For continued project description see Special Conditions

Ohio County, Kentucky

click here to order

Richmond Utilities Diesel Truck and Mounted Crane

Richmond Utilities Diesel Truck and Mounted Crane

The scope of work includes the construction and/or furnishing of various items as listed in the Bid Schedule of this document, plus incidentals necessary to complete the work. The work is entitles the “Richmond Utilities Diesel Truck and Mounted Crane” and consists of the purchase and delivery of one (1) new 1-ton diesel truck fiteed with one (1) 6,500 ft. lb. electric crane and one (1) 2,000 lb. winch at the Richmond Utilities Otter Creek Wastewater Treatment Plant.

Richmond, KY

Click Here to Order

Richmond Utilities Trailer-Mounted Centrifugal Pump

Richmond Utilities Trailer-Mounted Centrifugal Pump

The scope of work includes the construction and/or furnishing of various items as listed in the Bid Schedule of this document, plus incidentals necessary to complete the work. The work entitled the “Richmond Utilities Trailer-Mounted Centrifugal Pump” and consists of the purchase and delivery of one (1) new trailer-mounted centrifugal trash pump at the Richmond Utilities Otter Creek Wastewater Treatment Plant.

Richmond, KY

click here to order

Lancaster Road (KY 39) Water Line Replacemetn Project City of Crab Orchard

Lancaster Road (KY 39) Water Line Replacemetn Project City of Crab Orchard

The work to be bid upon is described as follows:
53,200 LF 10-inch PVC water line to replace 6-inch AC water line
1,00 FL 12-inch DR-9 HDPE water line by Directional Drilling methods
5,000 LF 3/4″, 1″ and 1 1/2″ CTS Service Line
300 LF 16-inch steel casing pipe Bore & Jack
35 Ea. 10-inch Gate Valve & Box
117 Ea. Water Meter Reconnections
21 Ea. New Water Meters & Box
9 Ea. New Duplex Water Meters & Box
9 Ea. Fire Hydrant Assemblies
All Appurtenances

Engineer Estimate 1,400,000

Crab Orchard, KY

Click Here to Order

North Laurel Middle School

North Laurel Middle School

1. Remediation of existing pyretic soils within the building. Constructing new subsurface soils, concrete floor slabs and classroom walls along affected areas. 2. Demolition of the exterior facades of the existing Administration and Media Center wings. Constructing a new 19,060 sf addition and exterior canopy, consisting of structural slabs, grade beams, caissons, steel structure and masonry. 3. Excavation of existing paving, walks and grading. Construction of new parking, traffic routes, walks and grading and including new exterior site lighting. 4. Re-coating of existing metal roof and re-roofing of existing foam roof systems. Demolition of existing metal fascia and soffit panels. Constructions of new thermal envelop to include new metal fascia and soffit panels. 5. Demolition of existing interior floor and wall finishes. Repaiting, installation of new FRP panel wainscot, wall base and floor finishes.

London, KY

Click Here to Order

Locust Trace Agriscience Farm Livestock Barn

Locust Trace Agriscience Farm Livestock Barn

Locust Trace Agriscience Farm Livestock Barn
242 Locust Farm Rd
Lexington, KY 40514

The work includes the construction of a post frame wood livestock barn with metal siding and roof panels – approx. 38′ wide x 72′ long plus two 12′ wide open roof areas, one on each side of barn. Work to include electrical and water plus minor site work. Professional Engineer required from Building System supplier for building structure and footing design.

Lexington, KY

Click Here to Order

City of Frankfort Marlowe Court Sanitary Sewer Main Replacement

City of Frankfort Marlowe Court Sanitary Sewer Main Replacement

City of Frankfort Marlowe Court Sanitary Sewer Main Replacement

Installation of 10 repaired or replaced standard manholes, 1 new standard manhole, replacement of approximately 1215 lf og 8″ sanitary sewer mains using standard open cut, CIPP and Pipe Burst installation methods, and 17 service lateral reconnections: also includes sewer televising, testing, sidewalk, fencing and landscape repair, including all materials, excavation and appurtenances.

Frankfort, KY

Click Here to Order

University of Kentucky HA645 Install New Analyzers HVAC REBID

HA645 Install New Analyzers HVAC REBID

The project consists of the necessary modifications to the HVAC system in HA645 in order to install new analyzers

Lexington, KY

Click Here to Order

TARC Union Station Bus Vacuum System

TARC Union Station Bus Vacuum System

To furnishing of all labor and materials and the performance of all work required for Union Station Bus Vacuum System.

Louisville, KY

Click Here to Order

Olive Garden — Goldsboro, NC

Olive Garden — Goldsboro, NC

The scope of work consists of a full restaurant interior fit up. All mechanical trades will be required as well as glass/glazing, drywall/metal stud, rough carpentry, finish carpentry, tile, acoustic ceiling, painting, and roofing.

Goldsboro, NC

Click Here to Order

RFB-242-12 Upgrade Welding Shop Exhaust System Rowan Campus

RFB-242-12
The project consists of welding shop exhaust and ventilation system replacement and
upgrade. The HVAC scope includes equipment and ductwork demolition, new welding
exhaust ductwork and hoods, utility set exhaust fans and new gas fired make up air
unit. Electrical includes re-feed of MCC and power distribution to new HVAC
equipment. Additional work includes structural steel modifications for rooftop
equipment support and metal building roof and wall penetrations.

Morehead, Kentucky

click here to order

RFB-243-12 Group IV PBG 12

RFB-243-12
The Division of Abandoned Mine Lands wishes to receive bids to perform reclamation work on approximately 88 acres of mine land in Lawrence County, Kentucky. The work will consist of earthwork, gradework, revegetation and planting of trees on 1 bond forfeiture permit.

For continued project description see Special Conditions.

Lawrence County, Kentucky

click here to order

Elevator and Structural Slab Rehabilitation for Crescent Hill and Zorn Pump Station Boiler Buildings

Elevator and Structural Slab Rehabilitation for Crescent Hill and Zorn Pump Station Boiler Buildings

Louisville Water Company is requesting Bids to provide all labor, rigging, tools, equipment, and materials to rehabilitate the existing open shaft Freight Elevators located in both of the Crescent Hill and Zorn Pump Station Boiler Buildings. The scope of work for both Boiler Buildings includes rehabilitating the eleavator cab, frame and rails for uninterupted operation as well as safety improvements which include, but is not limited to, caging, lights, telephone, ladders, painting and other work as noted in the contract documents. The Crescent Hill work will also require the demolition and rehabilitation of the concrete floor slabs accessing the elevator. Refer to contract documents, which include specifications and drawings, for further description of scope of work.

Louisville, KY

Click Here to Order