Oldham County Environmental Authority Covered Bridge Wastewater Treatment Plant Decommissioning
Pre-Bid Information
05/23/2012 11:00 AM
There will be a
pre-bid conference held at the Oldham County Environmental Authority office on Wednesday,
May 23, 2012 at 11:00 AM local time.
Description
The Oldham County Environmental Authority Covered Bridge Wastewater Treatment Plant Decommissioning project includes construction of new
facilities and upgrades to one existing wastewater pump station. New construction and upgrades include one (1) concrete wet well; one (1) concrete valve vault; one (1) emergency generator;
two (2) pumps, including level control floats, guiderails, pump bases, discharge piping and
valves; two (2) pumps, including guiderails and pump bases; associated yard piping, electrical,
site work, paving, and demolition, removal, and hauling of existing equipment; and temporary
bypass pumping and power. A 6-inch diameter pressure pipeline, approximately 2270 feet long, will be constructed from the Covered Bridge Wastewater Treatment Plant to the Albrecht Drive Lift Station. An 8-inch diameter pressure pipeline, approximately 2210 feet long, will be constructed near Crosshill Court Lift Station.