City of St. Matthews: Brown Park Stream Restoration Project
City of St. Matthews: Brown Park Stream Restoration Project
The project provides for all labor, materials, and equipment necessary to provide in stream modifications and bank grading along approximately 1,600 feet of Middle Fork Beargrass Creek, remove approximately 2125 SY of existing asphalt path and reconstruct approximately 2425 SY of proposed concrete path, and other appurtenant work within Brown Park.
Good Samaritan Hospital Parking Structure is constructed of Precast and Pre-stressed Concrete Columns, Inverted Tees, Double Tees and Spandrels. Topping is field. The four floor structure holds about 330 parking spaces and spaces and was constructed around 1982.
Meadowthorpe Elementary School Addition and Renovation
Meadowthorpe Elementary School Addition and Renovation
The work includes the renovation of approximately 39,020 SF and the addition of 30,430 SF to the existing building at Meadowthorpe Elementary School, originally built in 1959 with building additions in 1962, 1974, 1978 and 1987. Work includes, but is not limited to, selective demolition, removal and replacement of mechanical systems including installation of variable refrigerant volume systems, replacement of existing electrical systems, fire protection, fire alarm systems, interior finishes (walls, ceilings, floors and base), doors, frames, door hardware, reroofing, site improvements and paving, renovation of the existing cafeteria for administrative offices and the addition of 30×430 SF containing media center, cafeteria and kitchen, gym platform, classrooms, entry lobby, vestibules and supprot spaces. The work effort will be executed in two phases beginning in June 2012 and ending November 2013 and the school will be occupied during the course of the work.
A dry stone fence along a portion of Old Frankfort Pike in Lexington, KY which is designed to mimic an existing dry stone dence found on the property opposite of Old Frankfort Pike. Work items shall include the construction of approximately 558 linear feet of dry stone fence, construction staking, demolition of existing retaining wall portion, earthwork, sediment and erosion control measures, and site restoration.
This project primarily consists of the removal and replacement of approximately 48,000 SF of roofing material at Auburn Elementary in Logan Co KY. The successfully contractor shall remove the existing adhered EPDM systems and applicable insulation and board system down to the existing corresponding metal and/or cementitious-wood fiberboard decking systems. Contractor shall also prepare and adjust as needed existing vents, curbs, gas liners and other roof top items to receive the new insulation, recovery board, and roofing systems. Contractor shall also provide and install new thermoplastic membrane roofing and polyisocyanurate insulating systems that will provide a 20-year no-dollar limit roof warranty.
The scope of work consists of a full restaurant ground up build. All mechanical trades will be required as well as glass/glazing, drywall/metal stud, rough carpentry, finish carpentry, tile, acoustic ceiling, painting, and roofing.
You are invited to bid on supplying all equipment, materials, labor, permits, etc. to build the Clan & Metal Arts Building on the Western Kentucky University Farm.
This project consists of site work, the construction of a one story retail center shell (11,900 sq ft) and the build out of 8,000 sq ft. The retail cetner shell work specifically includes structural steel framing, concrete foundations & slab-on-grade, masonry, aluminum storefront and glazing, and single-ply roofing. The site work includes site work includes but is not limited to: erosion control, landscaping, demolition, concrete curbs, asphalt paving and stripping, concrete walks and pads, site utilities, (gas, electric, water, and sewer) grading, storm drainage, and sanitary sewers
The program of work for which bids are to be submitted consists of a twenty five hundred sq ft expansion of the existing building, paving, electrical, plumbing and all related appurtenances as described in the specifications and plans
Contract 4 Frank Johnson and 3-C Trail Water Storage Tanks Rehabilitation
Contract 4 Frank Johnson and 3-C Trail Water Storage Tanks Rehabilitation
The program of work for which bids are to be submitted consist of blasting and repainting of an existing 220,000 gallon ground storage tank, and installation of an interior mixing system, fencing, site improvements and all related appurtenances as described in the specifications and plans. Also the resealing, and installation of an interior mixing system in a 161,000 gallon standpipe glass lined tank and all related appurtenances as described in the specifications and plans.
Contract 3 US 60 Park Hills Water Line Replacement
Contract 3 US 60 Park Hills Water Line Replacement
The program of work for which bids are to be submitted consists of approximately 28,000 LF of water main upgrades, and replacing approximately 150 existing meters with new radio read meters and all related appurtenances as described in the specifications and plans