CITB-506-2026 Dizney Building Elevator Upgrades

5/1/2026: CITB-506-2026 Dizney Building Elevator Upgrades This invitation is for the upgrade of the elevator in the Dizney Building as specified in the following bid at Eastern Kentucky University’s Richmond, Kentucky Campus. Project Location: Richmond, Kentucky More Details

CITB-505-2026 Crabbe Library Elevator Upgrade

5/1/2026: CITB-505-2026 Crabbe Library Elevator Upgrade This invitation is for the upgrade of the elevator in the Crabbe Library as specified in the following bid at Eastern Kentucky University’s Richmond, Kentucky Campus. Project Location: Richmond, Kentucky More Details

RFB-261-26 KSU – Renovate Shauntee Hall

5/1/2026: RFB-261-26 KSU – Renovate Shauntee Hall Estimate: $857,490.00 Estimated Length of Project: 120 (Substantial Completion) + 30 (Final Completion) Shauntee Hall is a two-story classroom building, originally built in 1971. The current renovation aims to comprehensively overhaul the building to enhance its mechanical, electrical, plumbing systems, overall functionality, aesthetics and make it ful

Green River Valley Water District – Munfordville Pump Station Contract 5E – Pumps, Control Panel, & Meter Procurement

5/1/2026: Green River Valley Water District – Munfordville Pump Station Contract 5E – Pumps, Control Panel, & Meter Procurement The Project consists of two (2) construction contracts and four (4) material procurement contracts as follows; Contract 5A – Building Shell Construction Contract 5B – Pump Station Electrical Construction Contract 5C – Pipes, Fittings, & Valves Procurement [̷

Green River Valley Water District – Munfordville Pump Station Contract 5D – HVAC Unit Procurement

5/1/2026: Green River Valley Water District – Munfordville Pump Station Contract 5D – HVAC Unit Procurement The Project consists of two (2) construction contracts and four (4) material procurement contracts as follows; Contract 5A – Building Shell Construction Contract 5B – Pump Station Electrical Construction Contract 5C – Pipes, Fittings, & Valves Procurement Contract 5D – […]

Green River Valley Water District – Munfordville Pump Station Contract 5F – Telemetry Procurement

5/1/2026: Green River Valley Water District – Munfordville Pump Station Contract 5F – Telemetry Procurement The Project consists of two (2) construction contracts and four (4) material procurement contracts as follows; Contract 5A – Building Shell Construction Contract 5B – Pump Station Electrical Construction Contract 5C – Pipes, Fittings, & Valves Procurement Contract 5D – HVAC […]

Green River Valley Water District – Munfordville Pump Station Contract 5C – Pipes, Fittings, & Valves Procurement

5/1/2026: Green River Valley Water District – Munfordville Pump Station Contract 5C – Pipes, Fittings, & Valves Procurement The Project consists of two (2) construction contracts and four (4) material procurement contracts as follows; Contract 5A – Building Shell Construction Contract 5B – Pump Station Electrical Construction Contract 5C – Pipes, Fittings, & Valves Procurement Contract [

Green River Valley Water – Munfordville Pump Station Contract 5B – Pump Station Electrical Construction

5/1/2026: Green River Valley Water – Munfordville Pump Station Contract 5B – Pump Station Electrical Construction The Project consists of two (2) construction contracts and four (4) material procurement contracts as follows; Contract 5A – Building Shell Construction Contract 5B – Pump Station Electrical Construction Contract 5C – Pipes, Fittings, & Valves Procurement Contract 5D – […]

Green River Valley Water District – Munfordville Pump Station Contract 5A – Building Shell Construction

5/1/2026: Green River Valley Water District – Munfordville Pump Station Contract 5A – Building Shell Construction The Project consists of two (2) construction contracts and four (4) material procurement contracts as follows; Contract 5A – Building Shell Construction Contract 5B – Pump Station Electrical Construction Contract 5C – Pipes, Fittings, & Valves Procurement Contract 5D – […]

UK 2615.0-ESP-3.0 Fuel Tank Relocation

4/30/2026: UK 2615.0-ESP-3.0 Fuel Tank Relocation The Chandler Expansion project will involve the construction of a 2.08 million SF, 895 bed facility – with the focus on the expansion of the Chandler Patient Care Facility. The building will accommodate additional inpatient beds and clinical support services. General services targeted for this location include, but are not […]

Paintsville Independent School District – Paintsville Steam – Phase III

4/30/2026: Paintsville Independent School District – Paintsville Steam – Phase III This project consists of the Paintsville Independent School District – Paintsville Steam – Phase III Project Location: Paintsville, Kentucky More Details

Glasgow Airport – Airfield Lighting REBID

4/30/2026: Glasgow Airport – Airfield Lighting REBID The project includes but is not limited to replacing all airfield lighting shown on the plans and indicated in the specifications. Project Location: Glasgow, Kentucky More Details

FFAT – First Frontier Appalachian Trail Authority

4/30/2026: FFAT – First Frontier Appalachian Trail Authority The project scope includes the construction of a new office and attached garage facility for First Frontier Appalachian Trail Authority (FFAT) units. The new building is 4,035 gross square feet with a reception area, administrative offices, restrooms, conference room, kitchen, garage, and utility spaces. Construction assemblies consist of [

City of Versailles – Wilson Avenue Sidewalk

4/30/2026: City of Versailles – Wilson Avenue Sidewalk Reconstruction of approximately 960 feet of Wilson Avenue to install new sidewalks. Project Location: Versailles, Kentucky More Details

CITB-504-2026 Keen Johnson 1st & 2nd Floor HVAC & Roof

4/29/2026: CITB-504-2026 Keen Johnson 1st & 2nd Floor HVAC & Roof This invitation is for renovation of the 1st and 2nd floor HVAC as well as the roof in the Keen Johnson building as specified in the following bid at Eastern Kentucky University’s Richmond Campus. The work includes Description furnishing all labor, materials, equipment and services […]

UK-3342.0-1-26 CM Services for Pav H Maternal Fetal Medicine

4/29/2026: UK-3342.0-1-26 CM Services for Pav H Maternal Fetal Medicine The University of Kentucky desires the services of an experienced and highly qualified construction management firm to provide “FULL SERVICE” construction management on the proposed project. The Construction Manager (CM) will become a responsible, cooperative, and contributing member of the Owner’s professional team for the design [̷

RFB-221-26 DMA – BOWLING GREEN FMS EXTERIOR RESTORATION

4/29/2026: RFB-221-26 DMA – BOWLING GREEN FMS EXTERIOR RESTORATION Estimate: $395,651.00 Estimated Length of Project: 120 (Substantial Completion) + 30 (Final Completion) The Work includes exterior masonry repairs and repointing over the entire exterior of the Field Maintenance Shop. Existing paint and stucco coating are to be removed using dustless abrasive blasting. Exterior CMU will be […]

RFB-249-26 DJJ-Campbell Chiller Replacement

4/29/2026: RFB-249-26 DJJ-Campbell Chiller Replacement Estimate: $297,700.00 Estimated Length of Project: 150 (Substantial Completion) + 30 (Final Completion) The Contractor shall provide all of the materials and perform all the work described in the Specifications and/or shown on the Drawings. The Chiller and Chilled Water System of the CAMPBELL CO YDC Facility will be removed and […]

CC-404L-26 Expo Center Boiler Replacement

4/28/2026: CC-404L-26 Expo Center Boiler Replacement This project is for the Expo Center Boiler Replacement. The project will consist of the complete demolition of the existing boiler and hot water piping system and installation of new natural gas fired heaters, make up air handlers (MUAs), exhaust fans, and building controls in the arena and surrounding support […]

UK-3137.0-1-26 CM Services for Improve Willard Med/Science Equipment

4/28/2026: UK-3137.0-1-26 CM Services for Improve Willard Med/Science Equipment The University of Kentucky desires the services of an experienced and highly qualified construction management firm to provide “FULL SERVICE” construction management on the proposed project. The Construction Manager (CM) selected will become a responsible, cooperative and contributing member of the Owner’s professional team for t

Graves County Schools – Graves County High School Athletic Facility Renovation – Rebid

4/28/2026: Graves County Schools – Graves County High School Athletic Facility Renovation – Rebid The work includes the various renovations and construction of new buildings for the Graves County High School Athletic Facilities. Renovations include the regrading of the existing football field with new irrigation, drainage, concrete curb, grass sod, synthetic turf at team bench areas, […]

City of Marion – Water Treatment Plant Clearwell Tanks Rehabilitation

4/28/2026: City of Marion – Water Treatment Plant Clearwell Tanks Rehabilitation The project entails the rehabilitation of the Water Treatment Plant Clearwell Tanks. Proper tool cleaning, priming, and over-coating of the exterior and interior tank structure are recommended. All major and/or minor renovations and repairs of the tank will be addressed during the rehabilitation process as […]

KD-3122.0-1-26 CM Services for the Improve Medical Facility 3 (Health Park)

4/27/2026: KD-3122.0-1-26 CM Services for the Improve Medical Facility 3 (Health Park) UK King’s Daughters desires the services of an experienced and highly qualified construction management firm to provide “FULL SERVICE” construction management on the proposed project. The Construction Manager (CM) selected will become a responsible, cooperative and contributing member of the Owner’s professional team for [

RFB-251-26 KCA – Fire Pump and Facility Improvements

4/27/2026: RFB-251-26 KCA – Fire Pump and Facility Improvements Estimate: $125,000.00 Estimated Length of Project: 90 (Substantial Completion) + 15 (Final Completion) 1. This project consists of primarily the following scope of work: • Provide new replacement fire pump. • Provide new electrical and fire alarm work associated with new fire pump. 2. The project requires […]

RFB-251-26 KCA – Fire Pump and Facility Improvements

4/27/2026: RFB-251-26 KCA – Fire Pump and Facility Improvements Estimate: $125,000.00 Estimated Length of Project: 90 (Substantial Completion) + 15 (Final Completion) 1. This project consists of primarily the following scope of work: • Provide new replacement fire pump. • Provide new electrical and fire alarm work associated with new fire pump. 2. The project requires […]