RFB-73-26 DOC – LLCC VARIOUS ROOF REPLACEMENTS
9/15/2025: RFB-73-26 DOC – LLCC VARIOUS ROOF REPLACEMENTS Estimate: $1,640,000.00 Estimated Length of Project: 120 (Substantial Completion) + 30 (Final Completion) 1.Buildings: 4 (Areas: A-F), 5A, & 5B a.Remove: i.Existing membrane roofing system, including insulation, down to existing, sloped concretedecks. ii.All metal flashings & copings b.Install: i.New 2-layers of 2.2” insulation and 1/2”
Georgetown Municipal Water and Sewer Service – Desha Estates and Water Street Trunk Sewer
9/15/2025: Georgetown Municipal Water and Sewer Service – Desha Estates and Water Street Trunk Sewer CONTRACT 638-23-01 Furnishing and installation of approximately 3,612 linear feet of 42-inch sanitary sewer line, 66 linear feet of 24-inch sanitary sewer line, 18 linear feet of 27-inch sanitary sewer line, 967 linear feet of 8-inch sanitary sewer line, 730 linear […]
Columbia-Adair Utilities District – Phase 24 Wastewater System Improvements Contract No. 2 – System Improvements
9/12/2025: Columbia-Adair Utilities District – Phase 24 Wastewater System Improvements Contract No. 2 – System Improvements Phase 24 Wastewater System ImprovementsContract No. 2 – System Improvements consists of approximately 2,300 LF of 8-inch gravity sewer, 5,000 LF of 8-inch force main sewer, a main lift station replacement, 5 grinder pump replacements and various gravity sewer rehabilit
The City of Georgetown – Marshall Park Restroom and Storage Facility Construction
9/9/2025: The City of Georgetown – Marshall Park Restroom and Storage Facility Construction Work covered by Contract Documents: Material, equipment and tools, and services for: General; Plumbing; HVAC; and, Electrical work for construction of: A proposed addition to an existing concession stand at Marshall Park, located in Georgetown, KY. The addition consists of two (2) restrooms […]
RFB-80-26 Minuteman Parkway Parking Lot & Drainage DMA – Boone National Guard Center
9/9/2025: RFB-80-26 Minuteman Parkway Parking Lot & Drainage DMA – Boone National Guard Center Estimate: $705,731.02 Estimated Length of Project: 60 (Substantial Completion) + 30 (Final Completion) The project involves converting a gravel field into a paved parking lot, with upgraded lighting, improved access, pedestrian pathways, and stormwater collection, infiltration, and detention features. Pr
Grayson Utilities Commission – Contract 152-22-01 – Utilities Relocation KY1 at East Carter High School
9/8/2025: Grayson Utilities Commission – Contract 152-22-01 – Utilities Relocation KY1 at East Carter High School The work to be bid is described as follows: CONTRACT 152-22-01 Gas, water, and sewer utility line relocations consisting of approximately 2,400 linear feet of 3-inch, 6-inch, and 8-inch restrained joint, PVC pipe; approximately 1,700 linear feet of 2-inch and […]