| RFB-115-26 RE-AD RFB-82-26 EEC-AML-24011AMLBAML | 
RFB-115-26 RE-AD RFB-82-26 EEC-AML-24011AMLBAML
Estimated Length of Project:
(Substantial Completion) + 90 Calendar Days (Final Completion)
Drainage from eligible works are located upslope of the citizen’s residence impacting the residence and yard area. A slide has also occurred on the slope behind/beside the citizen’s residence impacting yard drainage. This project addresses the slide removing a quantity of material and grading the remainder in place in a stable configuration. The existing ditch adjacent to the slide area will be excavated to rock. A Concrete Block-Tied Mat ditch will be installed from the top end of the excavated rock ditch to a planned drop box at the toe. Drainage will also be collected by installation of subdrain along the toe of the highwall. All collected drainage will be routed to a second drop box installed on the existing pipe crossing KY-194 and ultimately the roadside ditch. Concrete Block-Tied Mat ditches will also be installed to control surface drainage from the adjacent roadway and conduct drainage down the slope to the drop box and existing culvert. A culvert with inlet headwall will be installed between the concrete block-tied mat adjacent to the state roadway and drop box to allow access. All material generated by construction activities will be wasted onsite
Project Location: Pike County