Install Refresh View All
Read All Unread All

Lynn Imaging

RFB-115-26 RE-AD RFB-82-26 EEC-AML-24011AMLBAML

Wed, Oct 29, 2025 3:26 PM

RFB-115-26 RE-AD RFB-82-26 EEC-AML-24011AMLBAML

Estimated Length of Project:
(Substantial Completion) + 90 Calendar Days (Final Completion)

Drainage from eligible works are located upslope of the citizen’s residence impacting the residence and yard area. A slide has also occurred on the slope behind/beside the citizen’s residence impacting yard drainage. This project addresses the slide removing a quantity of material and grading the remainder in place in a stable configuration. The existing ditch adjacent to the slide area will be excavated to rock. A Concrete Block-Tied Mat ditch will be installed from the top end of the excavated rock ditch to a planned drop box at the toe. Drainage will also be collected by installation of subdrain along the toe of the highwall. All collected drainage will be routed to a second drop box installed on the existing pipe crossing KY-194 and ultimately the roadside ditch. Concrete Block-Tied Mat ditches will also be installed to control surface drainage from the adjacent roadway and conduct drainage down the slope to the drop box and existing culvert. A culvert with inlet headwall will be installed between the concrete block-tied mat adjacent to the state roadway and drop box to allow access. All material generated by construction activities will be wasted onsite

Project Location: Pike County

More Details

Go to Link: https://www.lynnimaging.com/bids/2025/10/29/rfb-115-26-re-ad-rfb-82-26-eec-aml-24011amlbaml/