RFB-30-26 KSFB – KEC South Wing Restroom Renovations |
RFB-30-26 KSFB – KEC South Wing Restroom Renovations
Estimate:
$682,313.00
Estimated Length of Project:
150 (Substantial Completion) + 30 (Final Completion)
Renovate (8) Bathrooms
1. REMOVE & REINSTALL EXG TOILET & UTINAL AND REINSTALL.
2. REPLACE TOILET & URINAL PARTITION, VANITES & FAUCETS.
3. REPLACE FLOOR WALL & CEILING (NEW ACP/GRID OR PAINT HARD SURFACE).
4. REMOVE AND REINSTALL ALL FLOOR/WALL/CEILING ITEMS SUCH AS BUT NOT LIMITED TO; SPRINKLER HEADS, SPEAKERS, FIRE ALARMS, WATER SPIGOT, OUTLETS, SMOKE DETECTORS, ETC…
5. REPLACE ALL LIGHT FIXTURES & SUPPLY REGISTERS/RETURN VENTS.
6. INSTALL OWNER SUPPLIED TOILET ACCESSORIES: TOILET PAPER HOLDER, PAPER TOWEL DISPENSERS, SANITARY DISWPOSAL & SOAP DISPENSER.
7. INSTALL NEW & EXG TOILET ACCESSORIES SUCH AS BUT NOT LIMITED TO MIRRORS, GRAB BARS, and DIAPER CHAINGING TABLES.
8. REPLACE URINAL WASTE LINE AS SHOWN ON PLANS.
9. INSTALL ADDITIONAL CLEAN OUT PER BATHROOMS AS SHOWN.
10. PAINT BATHROOMS DOORS, REMOVE EXG KICK/MAP AND REPLACE WITH NEW; ADD WALL DOOR STOP PER NOTED ON THE PLAN.
Project Location: Louisville