| Laurel County Board of Education – Laurel County Day Treatment – Phase 2 | 
Laurel County Board of Education – Laurel County Day Treatment – Phase 2
The Phase 2 Project at the Laurel County Day Treatment campus in the Bush community is
centered on renovation of the Existing Gymnasium and associated spaces. The main
gymnasium will receive new windows, HVAC equipment, lighting and electrical fixtures,
repaired flooring, and refreshed finishes. The existing stage area will be demolished and
replaced with new floor structure at the same elevation as the main gymnasium. That space will
then contain new restrooms, janitorial, and storage spaces. The space between in the existing
stage opening will receive new infill framing and casework. The existing basement floor will
be reworked to accommodate new footings and mechanical equipment. New double doors and
exterior access will be provided for this unoccupied space at the back of the gymnasium.
Existing abandoned openings on the rear and side of the gymnasium will be infilled with
matching stone finishes. All existing exterior walls associated with Phase 2 will be cleaned. A
new canopy and ramp will be constructed at the existing exterior gymnasium door. A new
decorative main entrance gate will be constructed at the southern entrance, and a non-decorative
gate constructed at the southern entrance. Some selective ceiling demolition and replacement in
the existing Phase 1 corridor to facilitate Domestic Water, Sprinkler, and Power services to be
extended to Phase 2 will be required. This work will allow the campus to utilize this space in
day-to-day instructional activities and preserve the historical space for the community.
Project Location: London, Kentucky