Install Refresh View All
Read All Unread All

Lynn Imaging

Elizabethtown Community & Technical College – Occupational Technology Building Renovation – Phase 1

Thu, Jun 12, 2025 4:23 PM

Elizabethtown Community & Technical College – Occupational Technology Building Renovation – Phase 1

The Elizabethtown Community & Technical College Occupational Technology Building Renovation Phase 1 will be
for a 38,000 square foot renovation to address crucial upgrades to the building’s infrastructure, including electrical,
mechanical, and plumbing systems, a new interior layout to the floor plan, and modernizing the exterior envelope.
The new building layout will expand training spaces for Welding, CAD, Electrical Technology, and Robotics,
including new classrooms & labs plus providing updated accessible restrooms and a new I.T. suite to serve the
campus. The entire facade will be re-clad with new metal panels, storefront & curtain walls, and brick veneer. There
are focused sections of the roof that get replaced or patched. The Phase 1 documents have been broken down into
two separate phases consisting of PHASE 1A and PHASE 1B. The PHASE 1A scope is to include ALL
sitework and exterior improvements for the Complete Project and the 13,500 square foot addition in its
entirety (ALL Trades). All Drawings have a match line that delineates this boundary of construction phasing
within the Phase 1 project documents. Please see Alternates for the additional work required in the Phase 1A
scope of work base bid by Trade Contractors.


OTB 100 will receive a new 13,500 square foot Advanced Manufacturing Center addition that will serve as a
cutting-edge hub for Machine Tooling, Computerized Manufacturing, & Industrial Maintenance programs. The
addition will feature an open-lab concept, a series of flexible classrooms, public restrooms and mechanical space.


The sitework to the North and West of the project will feature new paving and a new road connection to the adjacent
parking lot.


The mechanical system will be VAV with two central AHUs using chilled water from existing chiller in adjacent
building RPC and hydronic boilers for VAV reheat. 480V, 3-phase electrical service will be provided with utility
transformers in a new location, and a new main distribution panel will be in a new electric room. The building will
be fully sprinklered.

Project Location: Elizabethtown, Kentucky

More Details

Go to Link: https://www.lynnimaging.com/bids/2025/06/12/elizabethtown-community-technical-college-occupational-technology-building-renovation-phase-1/