RFB-28-26 EEC-AML-23088AMLBAML |
RFB-28-26 EEC-AML-23088AMLBAML
Estimated Length of Project:
(Substantial Completion) + 90 Calendar Days (Final Completion)
This project will create approximately 0.8 acres of disturbance within project boundaries encompassing approximately 1.5 acres. Reclamation actions under this project will include:
• Excavation to bedrock of a landslide that deposited debris on the house seat immediately adjacent to the Duncan Boggs residence
• Clearing of the perimeter drainage ditch from an existing 24” corrugated metal pipe (CMP) culvert beneath the Boggs residential access drive around the house.
• Cleanup of mudflow debris from around the Boggs residence, which was deposited as a result of landslide movement.
• If necessary, the existing 24” CMP driveway culvert will be replaced with a 24” HDPE culvert, with concrete headwalls.
Project Location: Letcher County