RFB-117-26 Parks – Yatesville Lake Marina Replacement
Estimate:
$12,026,552.00
Estimated Length of Project:
240 (Substantial Completion) + 30 (Final Completion)
The project is a full replacement of the marina. The work includes replacing all walkways, frames and floats.
Walkways will have concrete panels for surfacing. The head dock building will be replaced. Dock A – Dock E are all being replaced and will have covered slips. Landside utilities will all remain in place except for the fuel tank and fuel line that serves the marina. A new fuel tank and fuel line will replace the existing system. All water side utilities will be replaced.
The contractor shall follow the staging plan provided in the construction drawings that will permit all boats to remain in the water throughout construction.
Project Location: Louisa