CCK-3187.10-1-26 Kroger Field Repairs 2026- Lower Bowl Concrete & Waterproofing

Fri, Oct 31, 2025 11:13 AM

CCK-3187.10-1-26 Kroger Field Repairs 2026- Lower Bowl Concrete & Waterproofing

• The Lower Seating repairs occur between stadium Gate 1 and Gate 4.
• The work focuses on the precast concrete seating units at Row 1 through Row 51 in Section
1 through Section 11.
• Repairs include removal and replacement of the waterproofing membrane and all sealants at
the precast seating units.
• Rewelding and repairs of steel connections between precast seating units, repairs at rails, and
installation of supplemental steel brackets.
• Repair of concrete deterioration at the precast seating units and support framing.
• Installation of new drains at the lower row and repairs at existing drains.
• Preparation and painting of steel framing, support members, and concrete wall panels.
• The existing bleacher-style seats will be temporarily removed and reinstalled upon
completion of the work in the Lower Seating.

Project Location: Lexington, Kentucky