Install Refresh View All
Read All Unread All

Lynn Imaging

RFB-239-25 Re-Ad RFB-167-24 KCTCS – Renovate Academic Building – Hopkinsville CC

Fri, Apr 25, 2025 1:31 PM

RFB-239-25 Re-Ad RFB-167-24 KCTCS – Renovate Academic Building – Hopkinsville CC

Estimate:
$385,926.00

Estimated Length of Project:
120 (Substantial Completion) + 30 (Final Completion)

This project includes the removal of an existing foam system over concrete deck on the Hopkinsville Community College Academic Building and the installation of a new roofing system. The new system will consist of a modified bitumen roofing system over wood fiber cover board and 4″ of rigid insulation on top of the existing concrete roof deck. Additionally, the existing solar array is to remain in place during construction and flashing details incorporate the solar array connection points into the roofing system accordingly.

Project Location: Hopkinsville

More Details

Go to Link: https://www.lynnimaging.com/bids/2025/04/25/rfb-239-25-re-ad-rfb-167-24-kctcs-renovate-academic-building-hopkinsville-cc/