RFB-26-024 Southeast KY CTC Whitesburg Bridge Replacement
1/30/2026: RFB-26-024 Southeast KY CTC Whitesburg Bridge Replacement Estimate: $1,550,000.00 Estimated Length of Project: 196 (Substantial Completion) + 30 (Final Completion) This project includes demolition of the existing pedestrian bridge superstructure (including slabs, trusses, and guardrails) and adjoining exterior raised landing superstructure (including slabs, beams, columns, and masonry wraps) and r
RFB-191-26 EDU – KSB Scoggan Hall Curtainwall Replacement
1/28/2026: RFB-191-26 EDU – KSB Scoggan Hall Curtainwall Replacement Estimate: $1,355,190.00 Estimated Length of Project: August 1, 2026 (Substantial Completion) + September 1, 2026 (Final Completion) Removal of existing single-glazed curtainwall complete. Preparation of bearing condition at formerly cantilevered curtainwalls, to consist of steel ledger and sheet metal panel enclosure. Installation of new 6”
Mountain Comprehensive Health Corporation – Autsim Center Early Site Work
1/28/2026: Mountain Comprehensive Health Corporation – Autsim Center Early Site Work The project site is located at 5698 KY Highway 15, Whitesburg, KY 41858. The bid is to furnish all necessary labor, materials, tools, machinery, warranties, and all other items required to meet the new work per plans and specifications. Work to include, but not limited […]
RFB-26-023 Owensboro CTC Downtown Campus Roof Replacement
1/28/2026: RFB-26-023 Owensboro CTC Downtown Campus Roof Replacement Estimate: $1,990,000 Estimated Length of Project: 120 (Substantial Completion) + 30 (Final Completion) 1) The project consists of roof replacement of one (1) building at OCTC. i) Downtown Campus Building (Owensboro, KY) 2) Roof Replacements: a) Tear off existing roof membrane, sheet metal, metal counter flashings, and roof […]
Paintsville Utilities – Paintsville Flood Risk Management – Sluice Gate Replacement Project
1/27/2026: Paintsville Utilities – Paintsville Flood Risk Management – Sluice Gate Replacement Project The project consists of furnishing all labor, materials, equipment, and incidentals required to remove (3) existing flap gates and install (3) new self-contained, non-rising stem sluice gates within existing sanitary sewer manholes located along the West Paintsville Floodwall, as shown on the Co
City of Somerset – North Richardson and Eckstein Pump Station Rehabilitations
1/26/2026: City of Somerset – North Richardson and Eckstein Pump Station Rehabilitations The primary scope of work includes the installation of approximately 662 LF of 4-inch PVC force main, 72 LF of 8-inch PVC gravity sewer, two (2) sanitary sewer manholes, two (2) duplex pump stations and valve vaults, and related appurtenances. Project Location: Somerset, Kentucky […]
City of Lebanon Junction – HWY 61 Preston Highway Water Main Extension
1/21/2026: City of Lebanon Junction – HWY 61 Preston Highway Water Main Extension Installation of approximately 6,100 LF of force main, a sewer grinder pump station, 2,300 LF of water main and other appurtenances for a complete installation per SPECIFICATIONS and PLANS. Project Location: Lebanon Junction, Kentucky More Details