FW-001-26 – KDFWR – FILO Middle Creek III |
FW-001-26 – KDFWR – FILO Middle Creek III
Estimate:
1,163,801.00
Estimated Length of Project:
1/15/2027 (Substantial Completion) + 45 (Final Completion)
The proposed work consists of restoration and enhancement using Natural Channel Design techniques of approximately 14,891 linear feet of stream channels. Tasks to be performed to achieve project goals include reshaping of existing channels; re-establishment of new channels with stable dimensions; construction of in-stream structures; preparation of soil for seeding; native planting and seeding; installation of erosion control fabric and mulch; and harvesting, transporting, installing, and maintaining live stake and vegetative materials. The related stream channels have both ephemeral and intermittent flow regimes. The restoration project will re-establish approximately 1,553 feet of channel, rehabilitate 5,473 feet, enhance 2,400 feet, and provide riparian habitat enhancement along approximately 5,465 feet. Restoration will include in-stream structures such as brush toe, rock riffles, brush riffles, brush runs, woody debris drops, and headwater channel, as well as vegetation of the stream banks and improvement to the forested riparian corridor along the streams. In addition to the restoration, the project includes 143 feet of preservation.
Project Location: