RFB-81-27 DMA – BNGC USPFO Roof Restoration

Fri, Sep 11, 2026 1:09 PM

RFB-81-27 DMA – BNGC USPFO Roof Restoration

Estimate:
$1,178,317.00

Estimated Length of Project:
120 (Substantial Completion) + 30 (Final Completion)

The goal of this project is to remove the existing roof system down to the existing roof deck and install a new Two-Ply SBS Modified Bitumen roof system. The new roof system is a Two-Ply SBS Modified Bitumen in cold adhesive over cover board over rigid board insulation system. The first layer of insulation will be mechanically fastened. Additional layers and coverboard will be set-in two-part foam adhesive. All existing prefinished metal coping caps, gutters, scupper collector heads, downspouts, roof drains, metal roof splashes, flashings, accessories, and terminations will be removed and replaced with new components.

Project Location: Frankfort