Contract 4 Standby Generators Booster Pump Station Water Treatment Plant
Contract 4 Standby Generators Booster Pump Station Water Treatment Plant
This project will consist of the purchase and installation of a new diesel backup generator for the Ghent Water Treatment Plant, the purchase of a portable generator for the use at booster pump sites, all associated wiring and equipmentfor use of the portabl egenerator at two booster sites and related appurtenances as shown on the Drawing and Specifications
Western Pulaski County Water District Clifty Road Water Line Rehabilitation and Various Water Line Extensions
Western Pulaski County Water District Clifty Road Water Line Rehabilitation and Various Water Line Extensions
This project consists of approximately 3,650 L.F. of 6-inch and 3,150 L.F. of 3-inch to 4-inch SDR 17 PVC pipe, one 4-inch directional drill creek crossing, and accessories in Pulaski County.
Science/Allied Health Building Modifications, Jefferson Community & Technical College
RFB-197-11
Louisville, Kentucky
The project will consist of the renovation of existing rooms 354B, 355 and 360 located on the third floor of the Allied Health Sciences and Nursing Building at the downtown campus of the Jefferson Community and Technical College in Louisville. The purpose of the renovation is to provide instruction and lab space for the Clinical Lab Technician Program. The area directly affected by the renovation is 1,790 square feet.
The work includes, but is not limited to, replacement of tinted glass in aluminum window frames, wood doors, hollow metal door frames, resilient flooring and rubber base, metal stud and gypsum wall board partitions, acoustical ceilings, door hardware, plastic laminate casework, laboratory casework, epoxy resin countertops, modification of mechanical, plumbing, fire suppression and electrical systems.
Allen County Scottsville High School, Athletic Field Turf
Scottsville, Kentucky
G Scott and Associates Architects
Work will include the following: Installation of drainage system, grading,and establishing turf at Football Field at Allen County-Schottsville High School (ACSHS).
Lobby Lighting Restoration, Kentucky Center for the Arts
RFB-204-11
Louisville, Kentucky
This project includes removal of existing light fixtures, and installation of new exterior and interior lighting in the public spaces of the Kentucky Center. The lighting components will be controlled via a lighting control system. Project scope includes installation, power and control wiring, new light shelves and shield, and integration of existing lighting components.
Aluminum Door Replacement, Restaurant, Museum, and Vistor Center Kentucky Horse Park
RFB-203-11
Lexington, Kentucky
The project is the replacement of the aluminum doors of the Restaurant, International Museum of the Horse and the Visitor Information Center at the Kentucky Horse Park. The following description is given as an aid to the bidder in achieving a general understanding of the scope of the work. Contractor shall review the entire set of Contract Documents for the preparation of the bid.
Work is generally confined to the following areas.
1. Selective demolition.
2. Aluminum framing, entrances and doors.
3. Door hardware installation.
Job Purchase Information:
Plans are available for $20.00 (NON-REFUNDABLE) and CDs for $20.00 (NON-REFUNDABLE) purchase payable to Lynn Imaging.Sets may be ordered through this website by using credit card/cash/Lynn Account or by calling our direct number 502-875-8341. Allow for a 24 hour turnaround time on all orders placed. There will be a $14 shipping charge (UPS Ground) for all sets shipped out of town. All other methods of shipping have additional charges. There will be a $9.00 handling fee for the use of shipper numbers (Fed-Ex or UPS). Mail checks to Lynn Imaging 1122 U.S. 127 South, Frankfort, Ky 40601.
Site Drainage Bowling Green Technical College, Bowling Green Technical College
RFB-202-11
Bowling Green, Kentucky
Construct a new storm water drainage with new drop box inlets, yard drains and
downspout collection extensions to provide an updated storm sewer. The work
includes; digging trenches, installation of new storm sewer and downspout collection
pipe, installation of drop box inlets and yard drains.
Pedestrian & Vehicular Access Improvements, Bowling Green Technical College
RFB-201-11
Bowling Green, Kentucky
The Work consists of the following for the Pedestrian and Vehicular Access
Improvements: This project will remove the through drive, parking lots, overhead
utilities and create a central campus space. These spaces will consist of walkways,
lawn and planting areas, central gathering spaces and future sculptural elements.
The project will maintain the existing main entry from Loop Drive. The road will now
branch off into the two adjacent parking lots and circulation will flow through the
parking lots to access drives around the perimeter of the campus. The existing parking
lot will be revised to provide parking (both accessible and visitor parking) as well as a
drop off area, The site has many overhead utilities that will be buried. Many utility
poles will be removed. There will be other minor utility work to relocate fire hydrants,
post indicating valves and fiber lines. The existing lights for the project area will be
removed and new lighting standards have been established. The Owner will purchase
the lights and poles, however under this project the conduits and light pole bases will
be installed.
The intent of this project and specifications is for the elevator to replace the Reynolds Building #1 Elevator and upgrade and modernize the elevator to a fully operational and code compliant elevator system to replace existing open car freight elevator in Reynolds Building #1. This upgrade will include machine room, hoistway and pit.
City Of Frankfort East Main Street Sanitary Sewer Rehab
City Of Frankfort East Main Street Sanitary Sewer Rehab
The city intends to issue a contract for work to replace approximately 526-feet of sanitary sewer line by installing a sanitary sewer with piers and bracing, reconnecting seven lateral connections, and installing two new manholes. All lines are to be tested in accordance with standard Frankfort Sewer Department testing requirements. Contractor shall be required to maintain flow during all aspects of the construction. The contract and/or purchase order shall be issued to the lowest and best-rvaluated bidder responding to this invitation to bid. The contract shall be provided and performed in accordance with the stated specifications in artical IV -Proposal specifications, and Artical V – Technical specifications, of this invitation. The city’s purchasing agent shall notify the successful bidder. After notification of the bid award to the successful bidder, the performance of the work specified by the bid package shall be coordinated with the City of Frankfort Sewer Department personnel.
2286.2 Construct Fischer Tropsch Building At The Center for Applied Energy Research
2286.2 Construct Fischer Tropsch Building At The Center for Applied Energy Research
The new Fischer Tropsch Process Building will be a free standing construction located at research Park Drive in Lexington, KY. This facility requires approximately 4860sf of Factory (F-1) area and 920sf of offices(B). The building will be built as unseperated mixed use with a structural system primarily metal building construction. The proposed building is a single story metal building structure. The exterior veneer will feature metal panels with metal stud back-up. Interior finishes will include painted CMU walls along the process development unit/office division. The remaining walls will be metal studs. Exposed concrete floor will be throughout wit vinyl base along with exposed structure in the warehouse area with acoustical ceilings in the remaining areas of the building.
Louisville Water Company is requesting Bids for the installation of 1140 linear feet of 8-inch DR-18 C900 PVC water main (using traditional trench installation techniques). Also included with the project is the transfer, renewal, relocation or discontinue of 1 customer services.
Louisville Water Company is requesting Bids for the installation of 270 linear feet of 6-inch DR-18 C900 PVC water main (using traditional trench installation techniques) and 80 linear feet of 6-inch Pressure Class 350 ductile iron water main (using traditional trench installation techniques). Also included with the project is the transfer, renewal, relocation or discontinue of 10 customer services