Inpatient Care Center Maysville, KY
Inpatient Care Center
Hospice of Hope
JRA
Maysville, Kentucky
Inpatient Care Center
Hospice of Hope
JRA
Maysville, Kentucky
Walkertown Elementary Renovations
Hazard, KY
Clotfelter Samokar
Scott Fork Industrial Park Utilities Contract 2
The project includes two 1,000 Gallon Septic Tanks, a Leachfield, and associated piping.
Summit Eng
Pikeville KY
North Wastewater Treatment Plant
The scope of work includes the construction of a new extended aeration-type WWTP, rated at a peak flow of 9.0 MGD, consisting of one cylindrical fine screen, one vortex grit removal system, two oxidation ditches with vertical turbine mixers, two circular clarifiers, RAS/WAS pump station, UV disinfection, two aerated sludge holding tanks with PD blowers and coarse bubble diffusers, and one sludge dewatering centrifuge. Other structures include scum pump station, plant drain recycle pump station, and process flow splitters. An Administration building will consist of offices and a laboratory.
Jeffersonville, IN
Railroad Track Improvements #2450
Louisville, KY
To furnish all labor, material and necessary equipment for Railroad Track Improvements.
Louisville Loop Sign and Trailhead Fabrication and Installation
Furnish all labor, materials and necessary equipment for the Implementation of Louisville
Loop Sign and Trailhead Fabrication and Installation Project for Metro Parks, per the
attached maps and specifications (utilizing American Recovery & Reinvestment Act of
2009 – ARRA funds).
Louisville, Ky
Springfield Housing Authority
The project consists of waste line replacement and Flooring replacement at site KY056-01 (Melavin Circle)
CS Design
Springfield, KY
City Of Williamsburg Commerical Development Infrastructure
The project consists of approximately 1,600 LF of 8″ PVC waterline, 3,650 LF of 8″ PVC gravity sewer, 680 LF of 10″ PVC gravity sewer, 16 EA 48″ diameter Precast Manholes, 3 EA 48″ diameter Precast Drop Manholes. One aerial sewer creek crossing, tie-ins to existing lines and services, testing and disinfection, and landscaping restoration and seeding.
Williamsburg, KY
Millersburg US 68 Water Main Relocations
The work includes the construction of approximately 1,345 linear feet of 4-inch and 6-inch main and all appurtenances thereto as shown on the drawings and specifications.
Millersburg, KY
HCWA US 68 Utility Relocation Cynthiana, KY
The work includes the construction of approximately 1,670 linear feet of 4-inch main and all appurtenances thereto as shown on the drawings and specifications.
Harover
Cynthiana, KY
Route 750 Utility Relocation City Of Raceland
This project consists of approximately 442 L.F. of 12″ A-2000 PVC Sewer Main, 159 L.F. of 8″ A-2000 PVC SEwer Main, 591 L.F. of 10″ AWWA C151 DIP Water Main, 35 L.F. of 8″ AWWA C151 DIP Water
Howerton Eng
Raceland KY
Versailles Housing Authority Linden Drive Porch cover Replacements
Work includes remove existing and construct fifty-six (56) new portch covers, including new, metal roofed portch covers with fiberglass columns/brackets at seven (7) Linden Drive townhome buildings.
Campbell and Associates
Versailles, KY
Contract 397-09-02 Water Treatment Plant Expansion City Of Somerset
Expansion of the Somerset Water Treatment Plant to 16 million gallons per day. The construction will include a new chemical feed building, conversion of the existing superpulsator building to flocculation basins, a new plate setter building, and a new membrane building.
Bell Engineering
Somerset, KY
Contract 4 Five Forks Area Sanitary Sewer System Expansion Rebid
The program of work for which bids are to be submitted consists of approximately 35,734 L.F. of 8-inch, 6-inch, 4-inch, 2-inch and 1 1/4 inch force mains, 1,755 L.F. of 10-inch gravity sewer and 150 residential grider pump stations including all related appurtenances as shown on the drawings and described in the specifications for the sewage collection system for the City of Louisa Kentucky. The contract time alloted for the completion of this contract is one hundred eighty (180) consecutive calendar days.
Kentucky Engineering
Louisa, KY
Contract 7 Louisa Tank Interconnect Water Main Extension and Improvements Rebid
The program of work for which bids are to be submitted consists of approximately 6,610 L.F. of 10-inch ductile iron water main, the replacemtn of 2,465 L.F. of 6-inch SDR 21 Class 200 water main and 47 residential reconnections including all related appurtenances as shown on the drawings and described in the specifications for the city of Louisa Kentucky. The Contract Time allotted for the completion of this contract is one hundred eighty 180 consecutive calendar days.
Kentucky Engineering
Louisa, KY
Contract 8 Water Treatment Plant Improvements Rebid Louisa KY
The program of work for which bids are to be submitted consists of the installation of the following: Automatic self cleaning filtration system, WTP building addition, and emergency generators, also included are all associated plumbing, piping, mechanical, and electrical as shown on the drawings and described in the specifications. The contract time alloted for the completion of this contract is three hundred (300) consecutive calendar days.
Kentucky Engineering
Louisa, KY
Maysville Mason County Landfill Phase 4/5 Geocomposite Drainage Net
This project will consist of geocomposite drainage net and related work for approximately 2.88 HORIZONTALLY MEASURED acres of the contained landfill.
S and ME
Maysville KY
Lower Howards Creek Force Main Winchester KY
The project scope includes installation of approximately 18,050 feet of 24-inch force main, pig launching and receiving stations, buried valves and valve boxes, combination air release/vacuum valves, crushed stone pipe bedding, site clearing, site restoration, road and stream borings, concrete thrust blocks, and all related appurtenances and/or work.
Winchester KY
CDP
UK 2312.01 CAER Labratory #2 Bid package 5 Landscaping and Interior Signage
This package involves Mechanical, Interior Finishes and Specialty Rooms work for the new CAER laboratory #2, a 43 thousand SF research laboratory. The work will be performed under cobtract with the construction manager, Turner Construction Company and Finch Constructors.
UK Capital
Lexington, KY
UK Funkhouser Building Elevator Upgrade
The basic intent of this project and specifications is for the contractor to upgrade the Funkhouser Building Elevator to a fully operational and code compliant elevator system. The successful contractor shall construct the project based on, and satisfy all applicable requirements of surrent national, state and local codes and safety regulations include the ASME 17.2 2004 Edition, environmental requirements, the University of Kentucky Elevator Standard,(a notated copy specific to the Funkhouser Elevator is attached), and current requirements of teh Kentucky State Elevator Code and Inspection Department. this further includes, whether or not specified or not specified, provideing all work, equipment, and labor necessary and as required for the specific situations of the upgrade and modernization in the Funkhouser Building. All shall be completed to the University’s satisfaction. In general the elevator project includes: Complete upgrade and modernization of Elevator system and car. Installation of the Fireman Service and associated smoke detection system. Replacement of any worn or suspect parts anywhere in the system. Upgrading of Machine Room,hoistway, and pit code requirements, and providing upkeep and maintenance for the elevator from the signing of the contract through the end of the elevator warranty.
University of Kentucky
Lexington KY
Westhall Ave Main Replacement
Louisville Water Company is requesting Bids for the installation of 705 linear feet of 6-inch DR-18 C900 PVC water main using traditional trench installation techniques along Westhall Avenue, 155 linear feet of 6-inch Pressure Class 350 ductile iron water main using traditional trench installation techniques across Westhall Avenue and supply and install 275 linear feet of 6-inch HDPE Directional Drill water main along Westhall Avenue. Also included with the project are the installation of 1 fire hydrant and the transfer, renewal and relocation of 23 customer services. (See supplementary specifications for additional details). HDPE pipe will be supplied by the contractor. All other pipe and pipe appurtenances will be supplied by Louisville Water Company.
Louisville, Ky
Runway and Taxiway Overlay & Associated Lighting Project Addington Field Airport in Elizabethtown, Ky
Elizabethtown, Ky
Spencer County Storm Water Pump and Hose Package Taylorsville, KY
The project consists of furnishing and installing the following equipment: One self- priming trash pump with motor. Suction Line. Discharge Line. Complete setup and start up odf the equipment
HMB
Taylorsville, Kentucky
Washington County Fire Protection Site Grading
Washington County Fire Protection Site Grading. The project consists of removal of existing material, import of off site suitable fill and compaction to establish new grade elevation.
Donnelly Lea Arch
Springfield KY
Phelps Elementary School
02 General Trades
03 Masonry
04 Steel
05 Roofing
06 Drywall and Metal Framing
07 Alumnium Framed Entrances And Windows
08 Painting
09 Flooring
10 Tiling and Terrazzo
11 Wood Athletic Flooring
12 Elevators
13 Fire Protection
14 Plumbing
15 HVAC
16 Electrical/Communications/Security
17 Food Service
18 Gymnasium Equipment
19 Asphalt Paving
20 Combination
Codell Construction
Pikeville, KY