This project is to complete a repurposed space and adding on the that space that will require all trades, including but no limited to HVAC, electrical, carpentry/structural, concrete floor, block walls, roofing, painting, and plumbing.
CALL 201 CONTRACT ID 111345
CLINTON, OTHER STATE (TN) COUNTIES
121GR11D045
ALBANY BYPASS AND US127
CLINTON COUNTY
HPSTP 0139 (003): ALBANY BY-PASS (US 127) BEGINNING JUST NORTH OF SPRING CREEK
EXTENDING NORTH TO KY 1590, A DISTANCE OF 4.22 MILES. GRADE & DRAIN AND PAVEMENT
ALTERNATES. SYP NO. 08-00260.02.
CLINTON COUNTY
NH 1271 (105): ALBANY-TENNESSEE STATE LINE ROAD (US 127) RECONSTRUCT US 127 FROM
THE KENTUCKY STATE LINE EXTENDING NORTH TO THE ALBANY BYPASS, A DISTANCE OF 2.51
MILES. GRADE & DRAIN AND PAVEMENT ALTERNATES. SYP NO. 08-00260.10.
OTHER STATE (TN) COUNTY
NH 1271 (105): ALBANY-TENNESSEE STATE LINE ROAD (US 127) RECONSTRUCT US 127 FROM 0.
6 MILE SOUTH OF THE KENTUCKY STATE LINE EXTENDING NORTH TO THE KENTUCKY STATE LINE,
A DISTANCE OF 0.60 MILES. GRADE & DRAIN WITH ASPHALT SURFACE. SYP NO. 08-00260.10.
CALL 309 CONTRACT ID 111343
HARDIN COUNTY
JP02 047 NEW-ROUTE: ELIZABETHTOWN-RADCLIFFE CONNECTOR ROAD SECTION 2
FROM
CELLILLIANA DRIVE TO KY 220, A DISTANCE OF 2.82 MILES. GRADE & DRAIN
AND PAVEMENT
ALTERNATES.
SYP NO. 04-08103.30.
CALL 103 CONTRACT ID 111342
BARREN COUNTY
IM-NH 0652 (081): TENNESSEE STATE LINE-ELIZABETHTOWN ROAD (I-65) WIDEN I-65 TO
6-LANES FROM 1.1 MILE NORTH OF KY 255 I-CHNG TO 1.0 MILE SOUTH OF THE HART COUNTY
LINE. ASPHALT SURFACE WITH GRADE & DRAIN.
SYP NO. 03-00013.11.
CALL 101 CONTRACT ID 111335
MCCRACKEN COUNTY
BRZ 0103 (297): HOUSER ROAD (KY 1014) REPLACE BRIDGE AND APPROACHES OVER BLIZZARD
BOTTOM DITCH 0.65 MILE SOUTH OF KY 999, A DISTANCE OF 0.26 MILES. BRIDGE WITH GRADE,
DRAIN & SURFACE.
SYP NO. 01-01014.00.
CALL 107 CONTRACT ID 111049
MADISON COUNTY
STPR 4212(043): BEREA-RICHMOND ROAD (US 25) WIDEN US-25 FROM PUMPKIN RUN TO KY-876.
GRADE & DRAIN AND PAVEMENT ALTERNATES.
SYP NO. 07-00251.70.
CALL 105 CONTRACT ID 111047
SIMPSON COUNTY
STP 5071(013): FRANKLIN-SCOTTSVILLE ROAD(KY 100) RECONSTRUCT KY-100 FROM PAGE DR. TO
1000 FT. EAST OF RAINES DR. TO REMOVE CREST VERTICAL CURVE. GRADE & DRAIN WITH
ASPHALT SURFACE.
SYP NO. 03-00907.00.
CALL 104 CONTRACT ID 111046
WARREN COUNTY
STP 7434(021): FRANKLIN-BOWLING GREEN ROAD(US-31W) WIDEN US-31W WEST OF NATCHER
PARKWAY TO DILLARD ROAD. BRIDGE WITH GRADE, DRAIN & SURFACE.
SYP NO. 03-00317.00.
CALL 200 CONTRACT ID 111043
CALDWELL, LYON, HOPKINS COUNTIES
121GR11D043
WESTERN KENTUCKY PARKWAY (PW 9001)
CALDWELL COUNTY
NH 0021(031): WESTERN KENTUCKY PARKWAY (PW 9001) SPOT IMPROVEMENTS TO EXISTING WK
PARKWAY FROM MP 0.000 IN LYON COUNTY TO MP 37.00 IN HOPKINS COUNTY. GRADE & DRAIN
WITH ASPHALT SURFACE. SYP NO. 02-02057.00.
HOPKINS COUNTY
NH 0021(031): WESTERN KENTUCKY PARKWAY (PW 9001) SPOT IMPROVEMENTS TO EXISTING WK
PARKWAY FROM MP 0.000 IN LYON COUNTY TO MP 37.00 IN HOPKINS COUNTY. GRADE & DRAIN
WITH ASPHALT SURFACE. SYP NO. 02-02057.00.
LYON COUNTY
NH 0021(031): WESTERN KENTUCKY PARKWAY (PW 9001) SPOT IMPROVEMENTS TO EXISTING WK
PARKWAY FROM MP 0.000 IN LYON COUNTY TO MP 37.00 IN HOPKINS COUNTY. GRADE & DRAIN
WITH ASPHALT SURFACE. SYP NO. 02-02057.00.
MARSHALL, LYON, LIVINGSTON, HOPKINS, CALDWELL COUNTIES
DPR 0168(016): I-69 INSTALL SIGNS FOR THE UPGRADE OF THE WK PARKWAY TO I-69 .
SIGNS. SYP NO. 02-02058.00.
Office Renovation at Ctr. for Research and Development Phase 1
Office Renovation at Ctr. for Research and Development Phase 1
This project is a complete finishing of an unused, unfinished existing space that will require all traded, including but not limited to HVAC, electrical, carpentry, flooring/concrete, and plumbing. The demolition of the space will have been completed before this bid is awarded.
RFB-97-12
The proposed work consists of the remediation and reconstruction of the existing landfill, including but not limited to site grading, excavation and relocation of waste, removal of contaminated soils, final soil cover, drainage channels and culverts, leachate collection systems, and all appurtenant work necessary to complete the final cover.
This project is a complete remodel of an existing space that will require all traces, including but not limited to HVAC, electrical, carpentry, flooring/concrete, and plumbing. The demolition for this space has already been completed.
Crescent Hill Pump Station Bath House Improvements
Crescent Hill Pump Station Bath House Improvements
Louisville, KY
Louisville Water Company is requesting bids to provide all labor, rigging, tools, equipment, and materials to provide and install a new HVAC system, electrical service, light fixtures, and other work as noted in the contract documents. Refer to contract documents, which include specifications and drawings, for further description of scope of work.
The scope of work consists of a full restaurant shell construction and limited tenant finish. The tenant/El Nopal will be completing their own floor finishes and interior painting. Concrete, electrical, plumbing, HVAC, and fire protection will be required as well as glass/glazing, drywall/metal stud, rough carpentry, finish carpentry, tile, acoustic ceiling, exterior painting, and roofing.
Furnishing and Installation of approximately 500 L.F. of 10-inch ductile iron and 6,149 L.F. of 8-inch 6-inch PVC gravity sewers and associated accessories. Approximately thirty-seven 4-foot diameter precast manholes and accessories. Approximately 1,435 L.F. of 4-inch PVC force main and accessories.
Renovate approximately 8,200 square feet on the 6th floor of the Nursing Building to accommodate the construction of a new 118 seat computer classroom and associated support space.
The scope of work for which bids are to be submitted consists of, but is not limited to, the following: approximately 3,275 linear feet of 6″ PVC water main and other appurntenaces together with all related work. The contract time allotted for the completion of this contract is 60 consecutive calendar days. The work for this projetc is located in Jessamine County, Kentucky parallel to Phillips Lane
Construction of River Road Interceptor (Line “A” Station 14+00 to Station 54+83) from Harrods Creek to Jacobs School Road. The project includes approx. 3,963 LF of 36″ pipe, 18 Manholes and other miscellaneous pipe and paving items.
The project consists but is not limited to the construction of an asphalt trail along the top of the existing riverbank between Wilkinson Boulevard and the Kentucky River; and the construction of the trail within the earthen shoulder and back-slope along the right of way of Wilkinson Boulevard. Some portions of the trail(those outside of the Wilkinson Boulevard Shoulder) have already been graded and prepared for paving; this Phase 1 scope of work has been performed by the City and included grading and stabilization of subgrade with stone base and seeding and restoring disturbed areas. The contractor is responsible for the Phase 2 scope of work which includes completion of the Phase 1 trail segements and the entire construction of the remaining trail portions not subject to Phase 1 scope of work (those along the shoulder of Wilkinson Boulevard). The project also includes installation of landscaping and site furnishings within identified areas along the trail.