690 Improvements: Granger Pressure Reducing Station

690 Improvements: Granger Pressure Reducing Station

Louisville Water Company is requesting bids to furnish and install one (1) complete underground pressure reducing station including site work, electrical work, piping, EPSC, drainage, utilities, restoration and landscaping. See contract documents for additional details.

Louisville, KY

Click Here to Order

Skylight Replacement, Thomas D. Clark Center for Kentucky History

RFB-105-12
The project is the removal of the existing “Kalwall” skylight system over the main entry atrium and replacing it with a metal roof system. Other work involved includes but is not limited to structural metal deck installation, rigid roof insulation, masonry for the end walls, and decorative wood ceiling treatments.

Frankfort, Kentucky

Click here to order

Longhorn Steakhouse — Louisville, KY

Longhorn Steakhouse — Louisville, KY

The scope of work consists of a full restaurant ground up build. All site work such as grading, utilities, asphalt, and concrete will be required. Building Scope will include all mechanical trades as well as concrete, stone, CMU, glass/glazing, drywall/metal stud, rouch carpentry, finish carpentry, tile, acoustic, ceiling, painting, and roofing.

Louisville, KY

Click Here to Order

Highway Engineer Section Office , Grant County

RFB-106-12
The work includes construction of a new building housing the Section Offices for the Kentucky Transportation Cabinet – Grant County. Site development, utilities, paving and other site work are required. This building will remain unoccupied and under the control of the contractor during the course of this work, however the Contractor shall coordinate with the Transportation Cabinet for any work to be done that affects the areas outside of the Project Limits or any work to be done other than normal working hours.

Williamstown, Kentucky

Click here to order

Emergency Generators Repairs for Urban Goverment Center Building

Emergency Generators Repairs for Urban Goverment Center Building

Furnish all labor, materials and necessary equipment for the Emergency Generator Repairs for Urban Government Center Building Project for Public Works & Assets.

Louisville, KY

Click Here to Order

Professional Services for Study/Design — Boiler MACT

Professional Services for Study/Design — Boiler MACT

Western Kentucky University requests proposals from qualified Architectural/Engineering Firms to enter into a contract to conduct a feasibility study on the coal boilers in the Heat Plant at Western Kentucky University. It is almost time to renew the permit and as requirements have changed WKU is requiring a feasibility study to determine if it is in its best interest to update to coal boilers, put it scrubbers, etc. in order to permit, or to remove them and only use the gas boilers already in place. If it is determined to be the best decision to proceed with new permits on the coal boilers, it is the intent of the RPF to select an Architectural/Engineering Firm that can not only complete a feasibilty study (Phase 1), but to proceed with the redesign phase (Phase 2) and design the update that will be required to permit. This RFP will only move into Phase 2 if evaluated to be in the best interest of WKU.

Bowling Green, KY

Click Here to Order

City of Danville Harding Street Storm Water Improvements

City of Danville Harding Street Storm Water Improvements

Harding Street Storm Water Improvements including work on Rosemont Ave, Cottage Manor and Forest Ave. This project is for approximately 1340 feet of 30″, 248 of 24″, 963 of 18″, 322 of 15″ and other storm water pipe line construction and related small storm water structures. Sets will NOT be issued after 10/18/11 5:00pm.

Danville KY

click here to order

Clark County Elementary School Winchester KY

Clark County Elementary School

01 Paving
02 General Trades
03 Masonry
04 Steel
05 Roof
06 Drywall
07 Windows
08 Painting
09 Carpet/VCT
10 Tile
11 Food Service Equipment
12 Media Center Equipment
13 Wood Flooring
14 Bleachers
15 Fire Protection
16 Plumbing
17 Mechanical
18 Electrical
20 Combination

Winchester KY

click here to order

Conkwright MS Renovation Winchester KY

Conkwright MS Renovation

021 General Trades
022 Masonry
023 Steel
024 Roof-Alternate Only
025 Drywall
026 Windows
027 Paint
028 VCT/Carpet
029 Fire Protection
030 Plumbing
031 Mechanical
032 Electrical
036 Combination

Winchester, KY

click here to order

Purchase & Install New Pavilion at Okolona Park

Purchase and Installation of New Pavilion and Site Amentities for Okolona Park

Louisville, Ky

Click Here to Order

Dawson Springs 4H Camp Dining Hall Reroof

Dawson Springs 4H Camp Dining Hall Reroof

Remove existing shingle roof, gutters and downspouts. All roofing debris to be removed by contractor that is certified to remove ACM. Please refer to the attached “Analysis of Roof Samples.” All roof debris is to be disposed to according to projetc specifications. Any exposed sheathing is to be protected from the elements at all times. If a complete tear off is performed prior to replacement of roof, the entire roof will need to be protected. After removal of shingles and felt paper, roof sheating shall be inspected for rotted plywood, 1x, rafter facia, and/or rotted structural members (rafters/trusses). A University Representative shall inspect the rotted areas and review the quantities to be replaced prior to replacement.Install new exposed fastner, ribbed roof panels according to manufacturer’s and project’s specifications. If 2x or 1x nailers are required these are to be included in the lump sum bid price. Within 10 days of award, the contractor shall provide all submittals indicated, including color charts, samples and product data of all roofing products.Include new gutters and downspouts according to manufacturer’s and projetc specifications. Gutters to be 5″ seamless coil stock with 1 expansion joint per side and 4-5″ square downspouts per side with hidden fastners. Once a University Representative has inspected the new ribbed roof panel installation, install new ice guards per manufacturer’s and project specifications. Ice guards to be adhered to the metal panel and not mechanically fastened.

Dawson Springs, Ky

click here to order

City of Caneyville Wastewater Treatment Plant Improvements-Phase 3

City of Caneyville Wastewater Treatment Plant Improvements-Phase 3

The Wastewater Treatment Plant Improvements-Phase 3 Project generally consists of the replacement of the plant secondary treatment mechanical aeration assembly, construction of a new primary treatment structure including a mechanically cleaned bar screen, replacement of sludge pumps and controls, construction of a new aluminum service walkway structure, metal painting and construction of approximately 250 linear feet of new aluminum safety railing.

Caneyville KY

click here to order

111346 Pike County Call 312

CALL 312 CONTRACT ID 111346
PIKE COUNTY
JL03 098 3419 004-005: SMITH FORK ROAD (KY 3419) REPLACE BRIDGE ON KY 2419 OVER
SMITH FORK AT THE INTERSECTION OF KY 632, A DISTANCE OF 0.05 MILES. GRADE, DRAIN &
SURFACE WITH BRIDGE.
SYP NO. 12- 08101.0.

Click Here to Order

111050 Boyd County Call 315

CALL 315 CONTRACT ID 111050
BOYD COUNTY
FD39 010 0538 006-007: LAKE BONITA ROAD(KY 538) RELOCATION OF KY-538 FROM MP 6.5 TO
US-23. ASPHALT SURFACE WITH GRADE & DRAIN.
SYP NO. 09-00203.00.

Click Here to Order

111045 Kenton County Call 311

CALL 311 CONTRACT ID 111045
KENTON COUNTY
JL04 059 0016 012-013: TAYLOR MILL ROAD (KY-16) RECONSTRUCT KY-16 FROM BLACKSTONE
COURT TO I-275. GRADE & DRAIN WITH ASPHALT SURFACE.
SYP NO. 06-00344.50.

Click Here to Order

111041 Clay County Call 310

CALL 310 CONTRACT ID 111041
CLAY COUNTY
JL04 026 3475 001-002: LOWER RADER ROAD(KY 3475) CONSTRUCT NEW BRIDGE ON KY-3475.
BRIDGE REPLACEMENT.
SYP NO. 11-08635.00.

Click Here to Order

Youth Detention Center Kitchen Floor Coating

Youth Detention Center Kitchen Floor Coating

To furnish all labor, material and necessary equipment for the Youth Detention Center Kitchen Floor Coating,

Louisville, KY

Click Here to Order

Crescent Hill Water Treatment Plant Masonry Veneer Installation

Crescent Hill Water Treatment Plant Masonry Veneer Installation

Louisville Water Company is requesting bids to provide all labor, rigging, tools, equipment, and materials to provide and install new limestone veneer on the existing retaining wall along Grinstead Drive and Stilz Avenue, and other work as noted in the contract documents. Refer to contract documents, which include specifications and drawings, for further description of scope of work

Louisville, KY

Click Here to Order

Cherry Hill Lane Grid-Tie

Cherry Hill Lane Grid-Tie

Louisville Water Company is requesting Bids for the installation of 860 +/- linear feet of 6-inch Pressure Class 350 ductile iron water main and appurtences, and restore the site.

Louisville, KY

Click Here to Order

DB Services for Muhammad Ali Center Pedestrian Bridge Rebid

DB Services for Muhammad Ali Center Pedestrian Bridge Rebid

A Request for Proposals to furnish all labor, material & necessary equipment for Design Build Services for the Muhammad Ali Center Pedestrian Bridge ReBid.

Louisville, KY

Click Here to Order

East Bernstadt Elementary

East Bernstadt Elementary

Renovations

East Bernstadt, KY

click here to order

Muhlenberg County High School West Campus Sports Complex Bid Pack 3

Muhlenberg County High School West Campus Sports Complex Bid Pack 3

Sports Complex

Powderly, KY

click here to order

Monticello Housing Authority Sanitary Sewer Lift Station Replacement

Monticello Housing Authority Sanitary Sewer Lift Station Replacement

Installation of 1 Sanitary sewer lift station, force main, gravity sewer and accessories.

Monticello KY

click here to order

Eurie Tackett Repair (AML) Reclamation Project, 30th Annual Construction Grant

RFB-101-12
The Eurie Tackett Repair AMLProject consists of repaving approximately 1.4 total miles of Road proximate to the Glen Bentley, Kermit Dailey, Jeanene Hamilton, and Dale Newsome sites of the Eurie Tackett Group AML Project. Cover is anticipated to be two inches at the Hamilton and Newsome sites, and 1.5 inches at the Bentley and Dailey sites.

Dense Grade Aggregate is included for holes in pavement as encountered

Mobilization is included, and Traffic Control is to be considered as incidental to paving. For continued project description see Special Conditions.

Pike & Floyd Counties, Kentucky

Click here to order

Wayland Drainage (AML) Reclamation Project, 30th Annual Construction Grant

RFB-99-12
The Division of Abandoned mine lands wishes to receive bids on the following Project: The Wayland Drainage (AML) Reclamation Project is located in Wayland, in western Floyd County, Kentucky at approximately 37 degrees, 26 minutes, 44 seconds north latitude and 82 degrees, 48 minutes, 20 seconds west longitude . Mine drainage at the site is saturating the house seat of Cybil Bentley and neighbors.

A Tank and Pump System, subdrain with 12 inch pipe, and construction of a Class II/III Ditch with ECB and Filter Fabric are planned to control the drainage problem in the vicinity.

Hay bales will be placed for sediment control, and Residential Seeding is planned for the yard areas affected by construction activities. For continued project description see Special Conditions.

Floyd County, Kentucky

Click here to order