Uncategorized

CSO Basin 130 Permeable Pavement and Tree Boxes

CSO Basin 130 Permeable Pavement and Tree Boxes

This green infrastructure project involves the construction of several articulating concrete block permeable pavement strips within the neighborhood of Butchertown. This project includes connections of these paver strips to existing drainage structures and the drilling of shafts to promote infiltration. Tree boxes are proposed for both sides of Story Avenue near the existing Interstate 64 ramp immediately west of the existing freeway.

Louisville, KY

Click Here to Order

Cherry St Contract 70 Elevated Storage Tank Rehabilitation

Cherry St Contract 70 Elevated Storage Tank Rehabilitation

500,000 Gallon Elevated Water Storage Tank REhabilitation

Winchester, KY

Click Here to Order

Owen Co Field House Phase 2 New Work

Owen Co Field House Phase 2 New Work

Owen Co Old Middle School
1960 Highway 22 East
Owenton, KY

The project scope includes a new field house for the Owen Co Board of Education to house a future weight room, locker rooms, and restroom. Construction will include a pre-engineered metal building with a concrete foundation system.

Owenton, KY

Click Here to Order

Administrative Office of the Courts Renovations in the Old Jail Building

Administrative Office of the Courts Renovations in the Old Jail Building

Louisville, Kentucky

To furnish all labor, material and necessary equipment for the Administrative Office of the Courts’ spaces within the old Jail Building.

Click Here to Order

Jackson Co High School Athletic Facility

Jackson Co High School Athletic Facility

Bids are requested for:
General Trades AF
Masonry AF
Athletics Fields AF
Bleachers/Pressbox AF
Plumbing/HVAC AF
Electrical/Field Lighting AF

McKee, KY

Click Here to View

GMWSS Wastewater Treatment Plant #2 Painting and Concrete Repair

GMWSS Wastewater Treatment Plant #2 Painting and Concrete Repair

The program of work for which bids are to be submitted consists of the painting of wastewater equipment in various treatment units, miscellaneous concrete repair work, and removal and replacement of various equipment.

Georgetown, KY

Click Here to View

West Jessamine HS Gym Ceiling Replacement

West Jessamine HS Gym Ceiling Replacement

Nicholasville, KY

Click Here to View

Nicholasville Elementary School Renovation/Addition

Nicholasville Elementary School Renovation/Addition

Nicholasville, KY

Click Here to View

Flemingsburg Industrial Park II Sewer Extension

Flemingsburg Industrial Park II Sewer Extension

The construction of approximately 1,100 LF of 8-inch gravity sewer, 9,800 LF of 10-inch force main, 1 lift station and appurtenances.

Flemingsburg, KY

Click Here to Order

City of Richmond US 25 Widening Detention Basin

City of Richmond US 25 Widening Detention Basin

The scope of work includes earthwork, dam and spillway construction, erosion control, the installation of a box culvert, storm sewers and appurtenances.
The site is located behind Clark Moore Middle School, north of Savannah Drive, and South of Bay Colony Subdivision.

Richmond, KY

Click Here to View

RFB-231-12 Dorm 4 & 6 Roof Replacement

RFB-231-12
The project consists of roof replacements and masonry restoration on Dorm’s #4 & #6. Tear off existing built up roof membrane, sheet metal, metal counter flashings, lightweight concrete fill and roof components as indicated. Install new rigid insulation, tapered insulation, metal components. And 2-Ply SBS-Modified Bituminous Membrane system as indicated on the drawings.

Complete masonry restoration and 2-coats of water repellents.

LaGrange, Kentucky

Click here to order

RFB-232-12 HVAC Renovation Phase II-Science Building

RFB-232-12
Replace unit ventilators with VAV roof top unit. Bring all remaining old controls up to
new. Roof reinforcemtent and miscellaneous architectural finishes work. For continued
project description see Special Conditions.

Elizabethtown, Kentucky

Click here to order

South Fork Waterline Extension Phase 2

South Fork Waterline Extension Phase 2

Work is to include installation of approximately 11,600 LF of 6-inch, 32,400 LF of 4-inch, 250 LF of 2-inch waterline and other appurtenances.

Breathitt Co, KY

Click Here to View

Shawnee Branch Library Renovations Phase II #2719

Shawnee Branch Library Renovations Phase II #2719

A contract to furnish all labor, materials, and other necessary equipment for the Shawnee Branch Library Renovations Phase II.

Louisville, KY

Click Here to Order

Sharpsburg Community Center Renovation and Addition

Sharpsburg Community Center Renovation and Addition

General Construction for the Sharpsburg Community Center Renovation and Addition

Sharpsburg, KY

Click Here to View

Southside Drive and Iroquois Avenue Project

Southside Drive and Iroquois Avenue Project

Louisville Water Company is requesting Bids for The referenced project consists of the installation of 1,870 +/- linear feet of 12-inch DR-18 C900 PVC and 105 +/- linear feet of Pressure Class 350 ductile iron water main (restrained and non-restrained using traditional trench installation techniques); installation of 990 +/- linear feet of 8-inch DR-18 C900 PVC water main (restrained and non-restrained using traditional trench installation techniques) and appurtenances and to restore the site. Also included with the project is the installation of 3 fire hydrants and the transfer, renewal, or relocation of 53 customer services.

Louisville, KY

Click Here to Order

Lakeside Elementary School Renovation Rebid

Lakeside Elementary School Renovation Rebid

Sandy Hook, KY

Click Here to View

Maintenance and Repair of HVAC Systems (Tracer Summit) at Islands and Glacier Run Facilites ReBid #2718

Maintenance and Repair of HVAC Systems (Tracer Summit) at Islands and Glacier Run Facilites ReBid #2718

A price contract for a portion of Louisville Metro Government’s need for Maintenance & Repair of the HVAC Systems (Tracer Summit) at Islands & Glacier Run Facilities ReBid for a
period of twelve (12) months.

Louisville, KY

Click Here to Order

County Line Community Church

County Line Community Church

The work consists of a 15,800 sf one-story Church. The building will have a Pre-Engineered Metal Building frame with PEMB panels and conventional exterior finishes (brick veneer, hardie siding) with PEMB roof panels. There will be a 3hr fire seperation wall on one side of the lobby seperating the sanctuary from the reminder of the building. Interior finishes will be paint on gypsum board.

Hazard, KY

Click Here to View

Adjacent Site Expansion for the Boyle Co Public Library

Adjacent Site Expansion for the Boyle Co Public Library

The project consists of the development of approximately 30,878sf of site area to provide for a new permeable paver system parking lot. The project also includes new brick veneer site walls on reinforced concrete foundations, along with new raised masonry benches and planter areas with reinforced CMU core construction and brick/cut limestone veneer on reinforced concrete foundations. There will also be a new storage building construction with conventional 2x wood framing with asphalt shingle roofing, copper gutters and downspouts, brick veneer and reinforced concrete slab and foundations. New concrete and brick paver sidewalks and concrete curbing will be installed. A new electrical service shall be installed, along with site and perimeter wall lighting. The existing water line service will be recaptured to provide water to hydrants and to the new proposed fountain. The work shall also include all of the related site work for excavation, fill, layout, grading, temporary construction fencing and the job trailer, storm water drainage and walkways. The work will also include all landscaping, sod, mulch, trees and plantings.

Danville, KY

Click Here to View

Annual Sidewalk and Curb Installation & Replacement

Annual Sidewalk and Curb Installation & Replacement

A price contract for a portion of Louisville Metro Government’s need for Annual Sidewalk &
Curb Installation & Replacement for a period of twelve (12) months.

Louisville, KY

Click Here to Order

Charles Brooking Park Restroom Building

Charles Brooking Park Restroom Building

Project consists of construction of a 456 square foot concrete block masonry building for use as restrooms and includes associated site work, general construction, plumbing, sanitary sewer, and electric.

Georgetow, KY

Click Here to View

Tates Creek Elementary School Addition and Renovation

Tates Creek Elementary School Addition and Renovation

The work includes the renovation of approximately 55,794 SF and the addition of 23,283 SF to Tates Creek Elementary School, originally built in 1963 with building additions in 1974 and 1988. Work includes but is not limited to, selective demolition, removal and replacment of mechanical systems including installation of variable refrigerant volume systems, replacement of existing electrical systems, fire protection, fire alarm systems, interior finishes (walls, ceilings, floors and base), door hardware, site improvements and paving, replacement of kitchen equipment and the addition of 23,283 SF of new administrative area, media center and classrooms. The work effort will be executed in 4 principal phases beginning in June 2012 and ending December 2013 and will be occupied during the corse of work.

Lexington, KY

Click Here to View

Waterline Replacement KY 47 Carroll Co

Waterline Replacement KY 47 Carroll Co

Construction will consist of approximately 1240 LF of 6″ PVC water line, 10 gate valves, 6 dry tap connections, 1 fire hydrant, 78 LF bores with steel encasement, 8 relocation and replacement of existing meters, and all necessary appurtenances.

Sanders, KY

Click Here to View

City of Frankfort Two Creeks 8″ Sanitary Sewer Rehab

City of Frankfort Two Creeks 8″ Sanitary Sewer Rehab

The City intends to issue a contract for work to rehabilitate 18,200 feet of existing 8” sanitary sewer with Cured-In-Place Pipe, including cleaning and heavy cleaning, pre and post CCTV inspection, internal trimming of 6 protruding taps, internal reinstatement of 100 laterals, renewing 30 services by excavation with two-way cleanouts, complete 14 point repairs, install 2 new manholes on existing sewers, and replacing 144 feet of existing 4” sanitary sewer pipe with 8” Ductile Iron Pipe using open cut with two (2) new manholes, in Two Creeks area in Frankfort, Kentucky. The related specifications illustrate the proposed work. The work to be performed under this Contract shall consist of furnishing all labor, materials, tools, equipment and incidentals. Contractor shall be required to maintain flow during all aspects of the construction. The construction sites shall be restored to preconstruction site conditions. Costs for all work including site restoration shall be included in the various pay items.

Frankfort, KY

Click Here to View

Subscribe