This invitation is for the repair/replacement of concrete in Powell Plaza as specified in the following bid at Eastern
Kentucky University’s Richmond, KY Campus. The work includes furnishing all labor, materials, equipment and services
necessary to complete the project outlined in the event and attachments including all items indicated throughout the event.
Work will begin immediately following an official Award of Contract and Purchase Order from Eastern Kentucky
University. A point of contact for EKU Project Management will be provided to the awarded vendor at time of award
Graves County Schools – Graves County High School Athletic Facility Renovations
Graves County Schools – Graves County High School Athletic Facility Renovations
The work includes the various renovations and construction of new buildings for the Graves County High
School Athletic Facilities. Renovations include the regrading of the existing football field with new
irrigation, drainage, concrete curb, grass sod, synthetic turf at team bench areas, and new athletic
equipment. The existing asphalt running track will be resurfaced with a mill and overlay of new asphalt
and a rubber running surface. The “D” Zones of the football field will receive new asphalt pavement and
rubber surface for new track events. New and relocated track events will be built outside the running
track. New fencing and concrete sidewalks around the track will be installed. Two new buildings will be
built. A new football concession stand building will be built on the West end of the Stadium. A new
Softball restroom & locker room building is to be built on the South side of the Softball field. New site
utilities including storm, sanitary, water & electric will be included at both new buildings.
At Jenny Wiley State Park Campground- Site renovation includes site clearing and erosion control, earthwork related to adding new pull-thru campsites and expanding existing campsites, asphalt milling and resurfacing, new asphalt pavement, new water line distribution throughout the campground with new campsite hydrants, replacement of the existing campground sanitary dump station and site restoration.
At Yatesville Lake State Park Campground- Site work includes installation of new isolation valves to the existing campground waterlines. New plumbing fixtures are to be included in the existing Bath House.
MSD Water Quality Monitoring Site Safety Upgrades Round 3
MSD Water Quality Monitoring Site Safety Upgrades Round 3
INVITATION TO BID
Sealed Bids will be received electronically by Louisville and Jefferson County Metropolitan Sewer District, for the construction of MSD Water Quality Monitoring Site Safety Upgrades Round 3, Contract No. 26-0305, Budget ID No. A26054, Drawing Record No. / Sheet No. , until 10:00 a.m., Local Time, March 5, 2026, and will be publicly opened and read at that time. The public may attend the bid opening via teleconference call at 502-654-8113 (Dial-in Number) Conference ID: 772 817
68#.
MSD is using a web-based portal for accepting and evaluating bid proposals digitally at http://louisvillemsd.bonfirehub.com/portal for this Invitation to Bid. Documents may be uploaded at any time during the open period indicated for each proposal.
Description and location of Project: Installation of guardrails, stairways, platforms, and associated safety elements at four (4) different MSD stream monitoring sites. Improvements are designed to meet OSHA requirements for safe working spaces. Drawings are provided for improvements at each location, and applicable OSHA standards are listed. All work shall be done in accordance to MSD’s Standard Specifications.
There will be no pre-bid meeting held for this project.
The Engineer’s Construction Cost Estimate for this project is between $116,000.00 and $137,000.00.
Persons wishing to view the bid documents may do so online at http://louisvillemsd.bonfirehub.com/portal or at the following locations: Builders Exchange of Louisville, Inc., 2300 Meadow Drive; Associated Builders & Contractors of Kentuckiana, 1810 Taylor Avenue; and F. W. Dodge, 1812 Taylor Avenue; all located in Louisville, Kentucky; and the Associated General Contractors of Kentucky, 2321 Fortune Drive, Suite 112, Lexington, Kentucky.
The Project Manager for this Invitation to Bid is Trent Winlock. All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s designated web portal at http://louisvillemsd.bonfirehub.com/portal. Questions received less than five days prior to the date for opening of bids may not be answered. Only answers by formal written Addenda posted on MSD’s designated web portal will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD’s Chief Engineer, David W. Johnson, P.E.
MSD SUPPLIER DIVERSITY MINORITY AND WOMAN BUSINESS ENTERPRISE PROGRAM POLICY AND PROCEDURES MANUAL (MBE/WBE PROGRAM) – FOR CONSTRUCTION CONTRACTS $200,000 AND GREATER for Minority Business Enterprise (MBE) and Woman Business Enterprise (WBE) subcontracting participation. Effective June 1, 2020, MSD has adopted and implemented the revised MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual, modifying the MBE and WBE participation goals on construction services and construction-related services, in accordance with the MSD Disparity Study (Study). The Study provided the factual predicate for MSD to establish new MBE and WBE goals in MSD contracting. The MSD MBE\WBE Program modified subcontracting goals are listed below:
If selected as applicable below, the Contractor must subcontract at least 18.0% of the total amount of the Contract Bid price to certified African American minority-owned businesses, at least 2.0% of the total amount of the Contract Bid price to a certified Asian-Indian American minority-owned businesses, and at least 15.0% total amount of the Contract Bid price to certified Caucasian Female businesses. If the Contractor is unable to meet the goals, they must demonstrate adequate “GOOD FAITH EFFORTS” in accordance with the MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program) – (see MSD MBE/WBE Program – Construction Subcontracting Goal Documents and Forms at http://louisvillemsd.org/SupplierDiversity/forms.
The MSE/WBE Program is effective June 1, 2020. If selected as applicable above, the goals are as follows:
18.0% MBE – African American, 2.0% MBE – Asian-Indian American and
15.0% WBE – Caucasian Female participation respectively required for this project.
MBE and WBE businesses are encouraged to bid on this project as a prime contractor.
MSD BID DISCOUNT: Applicable
This MSD construction project is bid and advertised as: check applicable below
Construction Services: X
Construction-related Services:
LOCAL LABOR COMMITMENT PREFERENCE: No
COMMUNITY BENEFITS PROGRAM: No
The contract will be awarded on the basis of the lowest, responsive, responsible bid, subject to the approval of the MSD Board. MSD reserves the right to reject any or all bids or waive any informality in any bid.
LOUISVILLE AND JEFFERSON COUNTY
METROPOLITAN SEWER DISTRICT
David Johnson, P.E.
Chief Engineer
Rene’ Lindsay, CPPO
One Water Chief Procurement Officer
Bath County Schools – Bath County Middle School Renovations
Bath County Schools – Bath County Middle School Renovations
The project will consist of building wide renovation of original 1939 structure and the
1970 kitchen / cafeteria addition at the Bath County Middle School (335 W Main St, Owingsville, KY) and
as also described in the project plans and specifications. Improvements will include abatement, new fire
suppression and new fire alarm, new HVAC systems, electrical upgrades, LED lighting, and roof
replacement. Other improvements include selective plumbing upgrades and selective door and hardware
upgrades, and selective window replacement. Exterior site improvements will include paving replacement
and waterproofing. Alternate bids will also be accepted as described in the bidding documents and
section 01800 Alternates. The detailed language specific to each bid package is located in section 01900
of the project manual.
The project includes installation of a new PVC roofing system as an overlay over the existing SBS roofing on a sloped metal deck, replacement of select moisture-damaged insulation, all new metal flashing, and miscellaneous other minor upgrades to improve overall weathertightness, including treatment of rooftop mechanical penetrations.
Replace Existing Air Handler and corresponding Return Fan in Building 202. Decentralize Building 202 from the Central Plant Chilled/Hot Water Loop and provide two Heat Pump Air Handling Systems. Ductwork modifications in Mechanical room shall occur. Two Outdoor condensing units shall be removed and replaced with two Heat Pumps, that will serve two indoor units. Indoor units will be installed in two phases to minimize downtime. Two return fans will be installed with corresponding Air Handling Unit. Relief louver will be installed above the door for system’s economizer mode. Provide electrical modifications to serve new
HVAC equipment.
London Utility Commission – Sinking Creek Road Sanitary Sewer Extension – Phase 2
London Utility Commission – Sinking Creek Road Sanitary Sewer Extension – Phase 2
The primary scope of work includes the installation of approximately 2,255 LF of 4-inch PVC
force main, 2,190 LF of 8-inch PVC gravity sewer, 10 manholes, one 220 GPM duplex pump
station and valve vault, and related appurtenances.
The project consists of structural repairs to exterior elements at the guestroom buildings at Dale Hollow State Resort Park. These repairs generally consist of spalled concrete, corrosion of steel, concrete cracking, and steel column repair. A new concrete pier will also be constructed at an existing retaining wall.
Estimated Length of Project:
(Substantial Completion) + 270 Calendar Days (Final Completion)
The project includes two sites in Perry County located just off of Mountain Shadow Drive, behind WYMT. The Sims site consists of a pre-law auger bench, whose outer slope has become unstable. Movement along the outer slope, around the foundation and inside the home have been reported. In addition, multiple auger holes along the back yard pose a threat to Mr. Sim’s young child. Lastly, drainage and sediment flow over an OSM concrete wall and towards the home. The Whitson site consists of an augered and backfilled highwall at house level and just above the home. Drainage continues to find its way into the back of the home. In addition, the slope behind the home has become unstable and large boulders have fell and damaged the deck and pool.
This project includes demolition of the existing pedestrian bridge superstructure (including slabs, trusses, and guardrails) and adjoining exterior raised landing superstructure (including slabs, beams, columns, and masonry wraps) and replacing with new steel superstructure and concrete slabs. Work includes replacement of exterior guardrails, and multi-stage painting system on all exposed faces. Work also includes select masonry and deteriorated lintel replacement, electrical lighting, signage, sealants, and traffic coating. Site control and restoration is included.
West Kentucky RRA – Riverport Public-Private Partnership – Predevelopment Services – Request for Proposal
West Kentucky RRA – Riverport Public-Private Partnership – Predevelopment Services – Request for Proposal
This RFQ is download only / NO Hardcopy Sets available
The West Kentucky Regional Riverport Authority (“WKRRA” or the “Authority”) invites proposals (“Proposals”) from qualified firms or teams to provide comprehensive pre-development services (the “Scope”) related to the design, construction, financing, operations, and maintenance of a new multimodal riverport located in West Kentucky near the confluence of the Ohio and Mississippi rivers (the “Project”). The purpose of this Scope is to assist WKRRA with making informed decisions on the Project and pave the way to publishing a future RFP to deliver the Project as a public-private partnership (“P3”).
The project is to freestanding public bathroom facility at the FFA Leadership Training Camp in Hardinsburg, KY. All four bathrooms will be ADA accessible. The building will be constructed of wood framed walls w/ pre-engineered wood trusses, on concrete slab, with 8” CMU foundation walls, on reinforced concrete footing. Exterior items include: concrete sidewalks, vinyl hopper windows w/ obscure glass & screens, prefinished metal board & batten siding, prefinished metal soffit panels, and asphalt-shingled roof (hip). Interior items include: epoxy flooring, extruded vinyl trim, ADA grab bars, SS toilet accessories, & prefinished metal fluted, siding on walls & ceiling. All wall cavities and bottom-side of roof will be insulated with spray foam. New insulated inward swinging doors w/ privacy hardware. Prefinished metal board & batten style metal wall panels (2 colors) on metal zee furring w/ rigid poly-iso insulation. 5’-0”w concrete sidewalks will be placed around full perimeter of bathroom facility and extend to existing adjacent walk. Building will only be heated and ventilated only. Exhaust ventilation will exit through the roof. Heat will be ceiling mounted electric units. Each bathroom contains a toilet (tank-type) and ADA accessible sink. Water supply shall come from adjacent swimming pool. Sanitary sewer shall be connected to manhole at the bottom of the hill to the rear of the bathroom facility. Electric will include interior and exterior light fixtures. Electric power shall come from adjacent transformer and panel box.
Bullitt County Extension District Board – Bullitt County Extension Office Addition and Renovation
Bullitt County Extension District Board – Bullitt County Extension Office Addition and Renovation
This RFP is for Construction Manager as Constructor (CMc) services.
The project consists of a comprehensive renovation of the existing Cooperative Extension building and
construction of two new additions. Renovated areas include offices, meeting rooms, reception and lobby
spaces, circulation, restrooms, and associated building systems. New construction includes a west program
addition housing a teaching kitchen, craft studio, exhibition/gallery corridor, support spaces, and an outdoor
learning terrace, as well as a separate office addition providing expanded administrative and program
workspace.
The improvements are designed to address current operational limitations, including inadequate storage,
limited acoustic privacy, outdated building systems, and constrained space for growing program demand.
Interior and exterior upgrades establish a unified look and feel across the campus through coordinated
materials, finishes, and architectural expression.
The project consists of the renovation of an existing consumer skills Masonry classroom into a Barber School in the Vocational Building. Barber school will consist of a teaching classroom and an open area with 10 hair cutting stations. Owner is furnishing barber school furniture and all associated hair cutting equipment. New ceilings and flooring will be provided. Floor and wall cutting will be required. Exposed ceilings will be replaced with lay-in ceiling grid. Minor modifications to doors and hardware will occur. New lighting, receptacles, and panel will be required. Heat Pumps, an exhaust fan, and associated ductwork will be provided to serve the project space. Plumbing fixtures will be removed and replaced. Additional fixtures will be provided. All work will be performed inside the facility perimeter Security fence.
RFB-191-26 EDU – KSB Scoggan Hall Curtainwall Replacement
RFB-191-26 EDU – KSB Scoggan Hall Curtainwall Replacement
Estimate:
$1,355,190.00
Estimated Length of Project:
August 1, 2026 (Substantial Completion) + September 1, 2026 (Final Completion)
Removal of existing single-glazed curtainwall complete.
Preparation of bearing condition at formerly cantilevered curtainwalls, to consist of steel ledger and sheet metal panel enclosure.
Installation of new 6” thermally-broken aluminum curtainwall with spandrel glass and insulation at ‘blind’ panels at all curtainwall openings, modified and as-existing.
Miscellaneous sheet metal flashing as required to make weather-resistant installation.
Mountain Comprehensive Health Corporation – Autsim Center Early Site Work
Mountain Comprehensive Health Corporation – Autsim Center Early Site Work
The project site is located at 5698 KY Highway 15, Whitesburg, KY 41858. The bid is to furnish all
necessary labor, materials, tools, machinery, warranties, and all other items required to meet the new work
per plans and specifications. Work to include, but not limited to: General Trades, Earthwork, Deep
Dynamic Compaction, Storm Drainage, and Permanent Erosion Controls.
CC-396L-26 Hester Hall Aquatherm Piping Replacement
CC-396L-26 Hester Hall Aquatherm Piping Replacement
The project consists of the demolition and replacement of all Aquatherm water mains, branches and valves. This
is located on floors one (1) through eight (8), and the penthouse. This excludes all the water loops located on
floor eight (8), which will be listed as an alternate. The project also consists of the installation of new shower
fixtures in all showers.
Meade County Water District – 2023 Water System Improvements
Meade County Water District – 2023 Water System Improvements
The Project includes the following Work:
• Construction of approximately 18,500 LF of 16-inch watermain and related appurtenances
along KY 313 (Joe Prather Highway) and KY 1238 (Garrett Road).
• Modifications to the existing Flaherty Pump Station which includes the installation of two (2)
125 HP VFD controlled pumps, larger electrical service, new generator and transfer switch,
and by-pass pumping.
• Installation of new Package Pump Station with two (2) 20 HP VFD controlled pumps along KY
144 in Payneville; water filling station, generator, site work, and yard piping and two (2)
electric motor actuated control valves and vault in the area.
• Rehabilitation of the 300,000 gallon elevated water storage Garrett Tank.
• Rehabilitation of the 300,000 gallon elevated water storage Payneville Tank, including the
installation of a separate 8” fill line within the riser and passive mixing system.
• Miscellaneous SCADA improvements at various system facilities.
Estimated Length of Project:
(Substantial Completion) + 90 Calendar Days (Final Completion)
Planning to replace a damaged and plugged 36 inch CMP and gabion mattress with 125 L.F. of HDPE pipe with headwalls, regrade and seed the area, and correct drainage issues from previous storm damage. Existing Concrete Mattress will be replaced with tied block mat and subdrain. Included are Drop boxes and junction box to incorporate existing peripheral drains. The excavated materials will be placed on adjacent property owned by the resident’s sister to the west approximately 280 ft behind the barn. No trees are proposed to be affected.
The Work includes removal and replacement of windows, hollow metal doors & frames, and storefront glazing systems at Building A and Building B at the Leestown Road campus of BCTC. Exterior louvers at Building B will be painted and resealed at perimeter. One coiling overhead door and two overhead door operators will be installed. Refer to Drawings and Specifications for additional information.
Americana World Community Center – Family Health Centers Renovation
Americana World Community Center – Family Health Centers Renovation
Americana World Community Center seeks to renovate the three-story, 8,979 square foot, former Holy
Rosary Convent building located on its campus at 4801 Southside Drive in Louisville, Kentucky. The first
and second floors will be renovated to become a primary care center, and the lower level of the building
will be renovated to be community center space with offices and areas for arts, crafts, and programs. The
renovation project will include the removal or abatement of asbestos and lead paint and renovation of the
exiting three stories. Renovation includes new entry and elevator addition to make all floors ADA
accessible. New windows, doors and interior finishes. New HVAC, plumbing and electrical.