Estimated Length of Project:
190 (Substantial Completion) + 30 (Final Completion)

Kentucky State University, Exum Center Exterior Repairs project is being undertaken to extend the usable life of the building and to maintain the weather resistance while modernizing the exterior appearance.
The façade is showing many signs of decay, as there are many visible areas of cracking in the brick, ground face CMU and architectural precast concrete shapes (sills, water table and other miscellaneous segments). The exterior insulation finish system (EIFS) has several areas showing decay and even has large sections missing at several locations around the building. In addition, the main entrance canopy has significant signs of decay including rust of the structural steel and downspouts; deteriorating EIFS; and missing canopy ceiling.
To stay within the project budget and to address the focal areas of the building, the scope of work will be limited to the renovation of the main façade, replacement of the entrance canopy, updating the front plaza and the urgent repairs around the remaining exterior of the building.
At the front façade of the building, the damaged masonry will be repaired and the entirety of the EIFS will be replaced with a modern metal wall panel assembly. The ‘big box’ of the gymnasium will be utilized for signage. The entrance canopy will be replaced in its entirety with an updated modern design along with the plaza surrounding the front of the building.

Project Location: Frankfort, Kentucky

More Details

Marion County Board of Education – Marion County ATC – Renovation & Addition

Marion County Board of Education – Marion County ATC – Renovation & Addition

This project consists of the renovation to the Marion Co. Area Technology Center and will include site elements, building addition and renovations. Site development includes reconstruction of the parking lot due to the incorporation of the geothermal wellfield, mill and overlay of remaining pavements and incorporation of concrete walks, yards and aprons. The addition will include expansion of labs and classrooms. Some walls will be removed and others added to align location and size of spaces with program requirements. Interior finishes include flooring, ceilings, paint and
casework.
The existing HVAC system will be replaced with a geothermal water source heat pump system with
dedicated outdoor air units located on the roof. Lighting in the building will be replaced with high efficiency
LED fixtures. New plumbing fixtures will be installed as part of program updates. The
building will also be provided with updated power and data infrastructure. The existing automatic
sprinkler and fire alarm systems will be extended into the building’s addition as well.

Project Location: Lebanon, Kentucky

More Details

Graves County Board of Education – Graves County High School Renovation

Graves County Board of Education – Graves County High School Renovation

The work includes the renovation of several areas of the High School. This includes renovation of six (6)
restrooms, and plumbing fixture replacement at the second-floor restrooms. reconfiguration & renovation
of a portion of the front office with new flooring in all office areas, renovation of the commons area
including the ceiling, terrazzo flooring, the platform and stairs, renovation of the art classroom, renovation
of seven (7) science classrooms, and a display case. Landscaping improvements at the front of the gym
and classroom wing.

Project Location: Mayfield, Kentucky

More Details

Murray-Calloway County Airport Board – Kyle-Oakley Field Airport Apron Expansion and T-Hangar with Jet Pod Project

Murray-Calloway County Airport Board – Kyle-Oakley Field Airport Apron Expansion and T-Hangar with Jet Pod Project

This project consists of the Murray-Calloway County Airport Board – Kyle-Oakley Field Airport Apron Expansion and T-Hangar with Jet Pod Project

Project Location: Murray, Kentucky

More Details

Hollenbach-Oakley LLC – Oldham Reserve – North Regional Basin

Hollenbach-Oakley LLC – Oldham Reserve – North Regional Basin

Construction of a regional storm water detention basin in Oldham County, KY

Project Location: Oldham County, Kentucky

More Details

RFP JOC 26-04 Concrete REISSUE

RFP JOC 26-04 Concrete REISSUE

The selected contractor(s) shall provide labor, materials, equipment, and supervision for various repair/replacement projects under the JOC delivery method.

Project Location: Various

More Details

RFP JOC 26-05 Building Automation Systems Services

RFP JOC 26-05 Building Automation Systems Services

The selected contractor(s) shall provide comprehensive BAS services, including installation, programming, commissioning, integration, maintenance, and full system hardware supply.

Project Location: Various

More Details

Kenton County School District – Renovation – Taylor Mill Elementary School

Kenton County School District – Renovation – Taylor Mill Elementary School

This project consists of the Kenton County School District – Renovation – Taylor Mill Elementary School

Project Location: Covington, Kentucky

More Details

Housing Authority of Harrodsburg – Modernization Project KY36P062-501(24)

Housing Authority of Harrodsburg – Modernization Project KY36P062-501(24)

The project consists of:

Roofing & Guttering

Project Location: Harrodsburg, Kentucky

More Details

City of Winchester – 5th Street Stream Restoration

City of Winchester – 5th Street Stream Restoration

The project scope includes demolition of 167 linear feet of 12’ x 4’ box culvert and earthworks associated with grading a
new open channel stream in its place. The project includes in-stream bank protection features such as a double boulder
revetment and a J hook vane. The project includes establishment of a new riparian buffer along the channel with native
trees, shrubs and wildflowers.

Project Location: Winchester, Kentucky

More Details

Jefferson County Public Schools – 26-305 Alex R. Kennedy – Partial Roof Replacement

Jefferson County Public Schools – 26-305 Alex R. Kennedy – Partial Roof Replacement

This project consists of replacing 70 squares of roof in
sections 3, 4 and 5.

Project Location: Louisville, Kentucky

More Details

RFB-233-26 KCA – Replace HVAC AHUs

RFB-233-26 KCA – Replace HVAC AHUs

Estimate:
$100,000.00

Estimated Length of Project:
90 (Substantial Completion) + 14 (Final Completion)

1. This project consists of primarily the following scope of work:
• Provide new heat recovery VRF system, with (4) indoor wall units and (1) branch selector
Unit.
• Provide local touch-screen control panel for control of entire VRF system.
2. The project requires routing of piping above existing lay-in ceilings, which shall be
protected and reinstalled in existing good condition.
3. The project requires close coordination with existing systems, piping and conduit routings.
Contractor shall field verify proper fit for proposed systems, to ensure proper installation
and startup of new equipment.

Project Location: Louisville

More Details

Bourbon County / Nicholas County Joint Economic Development Authority – Bourbon County / Nicholas County Regional Industrial Park – Mass Grading Project

Bourbon County / Nicholas County Joint Economic Development Authority – Bourbon County / Nicholas County Regional Industrial Park – Mass Grading Project

The project consists of the earthwork and drainage improvements to facilitate the mass grading of the future regional industrial park.

Project Location: Carlisle, Kentucky

More Details

Danville Independent Schools – John W. Bate Middle School Addition Renovation

Danville Independent Schools – John W. Bate Middle School Addition Renovation

The project will include renovation of the existing facility and constructing a new addition for additional classrooms. See individual bid packages for scope of work pertaining to.

The project will be constructed utilizing a “Construction Manager / General Contractor (CM/GC)”. The successful Individual Bid Package Contractor will enter into a contract with the CM/GC. D. W. Wilburn, Inc. will serve as the CM/GC for the project. No contractual relationship will be entered into between the successful Individual Bid Package Contractor and the Danville Independent School System.
This Advertisement For Bids consist of the following Bid Packages to complete the project scope:

Bid Package 1 – GENERAL TRADES
Bid Package 2 – EARTHWORK & STORM
Bid Package 3 – CONCRETE
Bid Package 4 – MASONRY
Bid Package 5 – CASEWORK
Bid Package 6 – ROOFING & METAL PANELS
Bid Package 7 – ALUMINUM STOREFRONT & WINDOWS
Bid Package 8 – DRYWALL
Bid Package 9 – CERAMIC & TERRAZZO
Bid Package 10 – FLOORING
Bid Package 11 – PAINTING
Bid Package 12 – FOOD SERVICE
Bid Package 13 – TELESCOPING STANDS
Bid Package 14 – ELEVATOR
Bid Package 15 – FIRE SUPPRESSION
Bid Package 16 – PLUMBING & HVAC
Bid Package 17 – ELECTRICAL

It is the intent of the Construction Manager / General Contractor (CM/GC) to competitively bid and make offer for BP#1 – GENERAL TRADES and BP#3 – CONCRETE per the standard regulations for construction of the Commonwealth of Kentucky.

Project Location: Danville, Kentucky

More Details

RFB-231-26 Re-Ad of RFB-145-26 EEC-AML-25063BFPFMP0

RFB-231-26 Re-Ad of RFB-145-26 EEC-AML-25063BFPFMP0

Estimated Length of Project:
(Substantial Completion) + 90 Calendar Days (Final Completion)

This site is located in Letcher County. Site has access issues with slides and ponds that will need to be removed. The restablishment of drainage ditches is also needed as well as the extingushing of approxiamtely .5 acres of burning refuse. Refuse will then be reshapped, capped and covered with all necessary revegetation activities

Project Location: Letcher County

More Details

Powell’s Valley Water District – Office Building

Powell’s Valley Water District – Office Building

This project consists of the construction of an Office Building for the
Powell’s Valley Water District.

Project Location: Clay City, Kentucky

More Details

Franklin County Fiscal Court – Farmers Lane Bridge Superstructure Replacement

Franklin County Fiscal Court – Farmers Lane Bridge Superstructure Replacement

The purpose of this project is to replace the existing single span bridge superstructure with a new
KYTC Standard Drawing single span composite box beam bridge superstructure and reconstruct
the roadway approach to the proposed bridge. The proposed bridge is located on Farmers Lane
0.3 miles northwest of Green-Wilson Rd in Franklin County, Kentucky.

Project Location: Franklin County, Kentucky

More Details

RFB-222-26 Parks – KDV – Golf Course Irrigation

RFB-222-26 Parks – KDV – Golf Course Irrigation

Estimate:
$3,070,621.00

Estimated Length of Project:
260 (Substantial Completion) + 30 (Final Completion)

Project scope consists of complete replacement of existing irrigation systems and irrigation pump station. Existing irrigation heads and controls to be removed and existing lines abandoned in place. New irrigation supply lines, heads and associated controls system to be installed. New irrigation system to be sourced from Toro or Rain Bird. Existing irrigation pump equipment to be removed and new pump station installed and connected to new irrigation system. New pump system to be single sourced from MCI Pumping Systems/Flowtronics. Existing Pump house to remain.

Project Location: Gilbertsville

More Details

CC-397L-26 Veterinary Science Building

CC-397L-26 Veterinary Science Building

This project consists of 88,397 square feet of new construction for the New Veterinary Science Building
located at the West Farm Campus. The one-story building will contain a mixture of offices, classrooms, labs,
and support space. There will be a base bid and nine alternates.

Project Location: Murray, Kentucky

More Details

City of Salyersville – Mountain Parkway Landscaping & Wayfinding

City of Salyersville – Mountain Parkway Landscaping & Wayfinding

The work to be bid is described as follows:

CONTRACT 738-26-01
Furnish and installation of landscape improvements, wayfinding signage,
masonry sign wall, and all associated project elements.

Project Location: Salyersville, Kentucky

More Details

Jefferson County Public Schools – Food Service Phase 44 – Various Locations

Jefferson County Public Schools – Food Service Phase 44 – Various Locations

The scope of work for this project is replacement of walk-in freezers
and coolers, cooler/freezer related condensers and evaporators at
Various schools throughout the district. Walk in coolers/freezers for
the various schools are not part of this contract. All work required
for the complete installation of the equipment is included in the
scope of work. Contractor must coordinate all work for the kitchen
equipment vendor.

Project Location: Louisville, Kentucky

More Details

RFB-230-26 DOC – LSCC Campus Wide Roof Repair/Replacements

RFB-230-26 DOC – LSCC Campus Wide Roof Repair/Replacements

Estimate:
$6,438,269.00

Estimated Length of Project:
180 (Substantial Completion) + 30 (Final Completion)

The project involves re-roof work at the Little Sandy Correctional Complex in Sandy Hook, KY. The project is for the State Houses, General Housing Units, Facility Building, Minimum Security Unit, East Region Training Center, Restricted Housing Unit, and the Gym/Chapel/Academic Building. The total roof square footage of work is approximately 196,440 SF of roofing material to be removed and replaced. The existing roof systems are two-ply modified bitumen, asphalt shingle, and metal roofs. The new roofs will be a two-ply SBS modified biumen re-cover system, asphalt shingles, and a sheet metal roof. All pre-finished metal roof coping caps, flashings, accessories and terminations are to be replaced. Some buildings not receiving a new roof will also receive new gutters and downspouts.

Project Location: Sandy Hook

More Details

UK-11913-1-26 BGCC 1st Floor Renovation

UK-11913-1-26 BGCC 1st Floor Renovation

This project is intended to expand the existing pharmacy while maintaining full pharmacy operations
throughout construction. In addition, the clinic requires additional exam capacity, so the scope
includes renovations to existing workrooms to accommodate four new exam rooms within the
current clinic footprint. The expansion will also include two points of care rooms within the new
pharmacy space. Refer to the drawings and specifications for complete project details.

Project Location: Lexington, Kentucky

More Details

Hardin County Schools – EC3 ADDITION (BG #22-055)

Hardin County Schools – EC3 ADDITION (BG #22-055)

This projects consist of the Hardin County Schools – EC3 ADDITION (BG #22-055)

Project Location: Elizabethtown, Kentucky

More Details

Middletown Station Pump Station Elimination

Middletown Station Pump Station Elimination

INVITATION TO BID

Sealed Bids will be received electronically by Louisville and Jefferson County Metropolitan Sewer District, for the construction of Middletown Station Pump Station Elimination, Contract No. 16989, Budget ID No. H23039, Drawing Record No. / Sheet No. 1-7, until 10:00 am, Local Time, Tuesday, March 31th, 2026, and will be publicly opened and read at that time. The public may attend the bid opening via teleconference call at 502-654-8113 (Dial-in Number) Conference ID: 820 993 448#.

MSD is using a web-based portal for accepting and evaluating bid proposals digitally at http://louisvillemsd.bonfirehub.com/portal for this Invitation to Bid. Documents may be uploaded at any time during the open period indicated for each proposal.

Description and location of Project: This Contract provides for the installation of approximately 1,048 linear feet of 8-inch sewer; 7 sanitary manholes; pavement restoration; erosion prevention and sediment control; decommissioning of one pump station (Middletown Station); and appurtenant work. This project is generally located at the southwest corner of Townepark Circle in the Eastgate Business Center extending towards Wooded Falls Road. All work shall be done in accordance to MSD’s Standard Specifications.

There will be a non-mandatory pre-bid meeting held for this project. The non-mandatory pre-bid meeting will be held over Microsoft Teams at 11:30 A.M. Local Time, Monday March 16, 2026. There will be a non-mandatory site visit held for this project. The non-mandatory site visit will be held at 12610 Townepark Circle at 12:30 PM, Local Time, Monday, March 16, 2026. All persons attending the site visit shall provide their own personal protective equipment (PPE).

Microsoft Teams meeting:
Join: https://teams.microsoft.com/meet/21116319836886?p=DOhlNdxQlwS9YFEK6s

Meeting ID: 211 163 198 368 86
Passcode: mm6F5F6N

The Engineer’s Construction Cost Estimate for this project is between $550,000.00 and $635,000.00.

Proposal forms, including Specifications and Instructions for Bidders, may be obtained from MSD’s designated web portal at http://louisvillemsd.bonfirehub.com/portal.

Persons wishing to view the bid documents may do so online at http://louisvillemsd.bonfirehub.com/portal or at the following locations: Builders Exchange of Louisville, Inc., 2300 Meadow Drive; Associated Builders & Contractors of Kentuckiana, 1810 Taylor Avenue; and F. W. Dodge, 1812 Taylor Avenue; all located in Louisville, Kentucky; and the Associated General Contractors of Kentucky, 2321 Fortune Drive, Suite 112, Lexington, Kentucky.

The Project Manager for this Invitation to Bid is Katie Burton. All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s designated web portal at http://louisvillemsd.bonfirehub.com/portal. Questions received less than ten days prior to the date for opening of bids may not be answered. Only answers by formal written Addenda posted on MSD’s designated web portal will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD’s Chief Engineer, David W. Johnson, P.E.

MSD SUPPLIER DIVERSITY MINORITY AND WOMAN BUSINESS ENTERPRISE PROGRAM POLICY AND PROCEDURES MANUAL (MBE/WBE PROGRAM) – FOR CONSTRUCTION CONTRACTS $200,000 AND GREATER for Minority Business Enterprise (MBE) and Woman Business Enterprise (WBE) subcontracting participation. Effective June 1, 2020, MSD has adopted and implemented the revised MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual, modifying the MBE and WBE participation goals on construction services and construction-related services, in accordance with the MSD Disparity Study (Study). The Study provided the factual predicate for MSD to establish new MBE and WBE goals in MSD contracting. The MSD MBE\WBE Program modified subcontracting goals are listed below:

If selected as applicable below, the Contractor must subcontract at least 18.0% of the total amount of the Contract Bid price to certified African American minority-owned businesses, at least 2.0% of the total amount of the Contract Bid price to a certified Asian-Indian American minority-owned businesses, and at least 15.0% total amount of the Contract Bid price to certified Caucasian Female businesses. If the Contractor is unable to meet the goals, they must demonstrate adequate “GOOD FAITH EFFORTS” in accordance with the MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program) – (see MSD MBE/WBE Program – Construction Subcontracting Goal Documents and Forms at http://louisvillemsd.org/SupplierDiversity/forms.

All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s designated web portal at http://louisvillemsd.bonfirehub.com/portal.

MSD SUPPLIER DIVERSITY PROGRAM: Applicable

The MSE/WBE Program is effective June 1, 2020. If selected as applicable above, the goals are as follows:

18.0% MBE – African American participation
2.0% MBE – Asian-Indian American participation
15.0% WBE – Caucasian Female participation

MBE and WBE businesses are encouraged to bid on this project as a prime contractor.

MSD BID DISCOUNT: Not Applicable

This MSD construction project is bid and advertised as: check applicable below

Construction Services: x
Construction-related Services:

LOCAL LABOR COMMITMENT PREFERENCE: No

COMMUNITY BENEFITS PROGRAM: No

The contract will be awarded on the basis of the lowest, responsive, responsible bid, subject to the approval of the MSD Board. MSD reserves the right to reject any or all bids or waive any informality in any bid.

LOUISVILLE AND JEFFERSON COUNTY

METROPOLITAN SEWER DISTRICT

David Johnson, P.E.
Chief Engineer

Rene’ Lindsay, CPPO
One Water Chief Procurement Officer

Project Location: Louisville, KY

More Details

Subscribe