Lower Roof Replacement National Guard Armory

RFB 21-12
Monticello, Kentucky

The Project consists of the complete removal and replacement of an existing built-up
roof over a concrete deck substrate. Demolition of an existing masonry chimney,
remove 5 existing capped vent curbs and patch, remove the existing gutters and
downspouts and replace with new to match the high roof, remove and replace existing
expansion joints, remove existing sheet metal over windows at 10 locations and
replace with new cladding.

Click Here to Order

Big Branch AML Waterline Expansion Vicco KY

Big Branch AML Waterline Expansion

Contract 3- The project consisits of construction of approximately 21,200 feet of 3 and 6 inch waterlines and necessary appurtenances in Big Branch, Maggard Branch and associated Hollows in Perry County. Work includes 200 linear feet of directional drilling with 6″ PE pipe as part of stream crossings and at other locations. Work also includes furnishing and installing a master meter with a pressure reducing valve and a flow control valve. Service will be provided to approximately 52 residences. Please review a set of plans and specifications for further details. Excavation is unclassified. The contractor shall furnish all materials, equipment and labor necessary to complete the construction of the waterline, appurtenances and backfill. Time of completion will be 180 calendar days.The engineers estimate for this project is $550,000.00.

RM Johnson

Vicco KY

click here to order

Senior Living at Kenton Pointe Maysville, KY

Senior Living at Kenton Pointe

Hospice of Hope

Maysville, Kentucky

Click Here to Order

Inpatient Care Center Maysville, KY

Inpatient Care Center

Hospice of Hope

JRA

Maysville, Kentucky

click here to order

Walkertown Elementary Renovations Hazard, KY

Walkertown Elementary Renovations

Hazard, KY

Clotfelter Samokar

click here to order

Scott Fork Industrial Park Utilities Contract 2 Pikeville, KY

Scott Fork Industrial Park Utilities Contract 2

The project includes two 1,000 Gallon Septic Tanks, a Leachfield, and associated piping.

Summit Eng

Pikeville KY

click here to order

North Wastewater Treatment Plant

North Wastewater Treatment Plant

The scope of work includes the construction of a new extended aeration-type WWTP, rated at a peak flow of 9.0 MGD, consisting of one cylindrical fine screen, one vortex grit removal system, two oxidation ditches with vertical turbine mixers, two circular clarifiers, RAS/WAS pump station, UV disinfection, two aerated sludge holding tanks with PD blowers and coarse bubble diffusers, and one sludge dewatering centrifuge. Other structures include scum pump station, plant drain recycle pump station, and process flow splitters. An Administration building will consist of offices and a laboratory.

Jeffersonville, IN

Click Here to Order

Railroad Track Improvements #2450

Railroad Track Improvements #2450

Louisville, KY

To furnish all labor, material and necessary equipment for Railroad Track Improvements.

Click Here to Order

Louisville Loop Sign and Trailhead Fabrication and Installation

Louisville Loop Sign and Trailhead Fabrication and Installation

Furnish all labor, materials and necessary equipment for the Implementation of Louisville
Loop Sign and Trailhead Fabrication and Installation Project for Metro Parks, per the
attached maps and specifications (utilizing American Recovery & Reinvestment Act of
2009 – ARRA funds).

Louisville, Ky

Click Here to Order

Springfield Housing Authority

Springfield Housing Authority

The project consists of waste line replacement and Flooring replacement at site KY056-01 (Melavin Circle)

CS Design

Springfield, KY

click here to order

City Of Williamsburg Commerical Development Infrastructure

City Of Williamsburg Commerical Development Infrastructure

The project consists of approximately 1,600 LF of 8″ PVC waterline, 3,650 LF of 8″ PVC gravity sewer, 680 LF of 10″ PVC gravity sewer, 16 EA 48″ diameter Precast Manholes, 3 EA 48″ diameter Precast Drop Manholes. One aerial sewer creek crossing, tie-ins to existing lines and services, testing and disinfection, and landscaping restoration and seeding.

Williamsburg, KY

Click Here to Order

Millersburg US 68 Water Main Relocations

Millersburg US 68 Water Main Relocations

The work includes the construction of approximately 1,345 linear feet of 4-inch and 6-inch main and all appurtenances thereto as shown on the drawings and specifications.

Millersburg, KY

Click Here to order

HCWA US 68 Utility Relocation Cynthiana, KY

HCWA US 68 Utility Relocation Cynthiana, KY

The work includes the construction of approximately 1,670 linear feet of 4-inch main and all appurtenances thereto as shown on the drawings and specifications.

Harover

Cynthiana, KY

Click Here to Order

Route 750 Utility Relocation City Of Raceland

Route 750 Utility Relocation City Of Raceland

This project consists of approximately 442 L.F. of 12″ A-2000 PVC Sewer Main, 159 L.F. of 8″ A-2000 PVC SEwer Main, 591 L.F. of 10″ AWWA C151 DIP Water Main, 35 L.F. of 8″ AWWA C151 DIP Water

Howerton Eng

Raceland KY

Click Here to Order

Versailles Housing Authority Linden Drive Porch cover Replacements

Versailles Housing Authority Linden Drive Porch cover Replacements

Work includes remove existing and construct fifty-six (56) new portch covers, including new, metal roofed portch covers with fiberglass columns/brackets at seven (7) Linden Drive townhome buildings.

Campbell and Associates

Versailles, KY

Click Here to Order

Contract 397-09-02 Water Treatment Plant Expansion City Of Somerset

Contract 397-09-02 Water Treatment Plant Expansion City Of Somerset

Expansion of the Somerset Water Treatment Plant to 16 million gallons per day. The construction will include a new chemical feed building, conversion of the existing superpulsator building to flocculation basins, a new plate setter building, and a new membrane building.

Bell Engineering

Somerset, KY

Click Here to Order

Contract 4 Five Forks Area Sanitary Sewer System Expansion Rebid

Contract 4 Five Forks Area Sanitary Sewer System Expansion Rebid

The program of work for which bids are to be submitted consists of approximately 35,734 L.F. of 8-inch, 6-inch, 4-inch, 2-inch and 1 1/4 inch force mains, 1,755 L.F. of 10-inch gravity sewer and 150 residential grider pump stations including all related appurtenances as shown on the drawings and described in the specifications for the sewage collection system for the City of Louisa Kentucky. The contract time alloted for the completion of this contract is one hundred eighty (180) consecutive calendar days.

Kentucky Engineering

Louisa, KY

Click Here to order

Contract 7 Louisa Tank Interconnect Water Main Extension and Improvements Rebid

Contract 7 Louisa Tank Interconnect Water Main Extension and Improvements Rebid

The program of work for which bids are to be submitted consists of approximately 6,610 L.F. of 10-inch ductile iron water main, the replacemtn of 2,465 L.F. of 6-inch SDR 21 Class 200 water main and 47 residential reconnections including all related appurtenances as shown on the drawings and described in the specifications for the city of Louisa Kentucky. The Contract Time allotted for the completion of this contract is one hundred eighty 180 consecutive calendar days.

Kentucky Engineering

Louisa, KY

Click Here to Order

Contract 8 Water Treatment Plant Improvements Rebid Louisa KY

Contract 8 Water Treatment Plant Improvements Rebid Louisa KY

The program of work for which bids are to be submitted consists of the installation of the following: Automatic self cleaning filtration system, WTP building addition, and emergency generators, also included are all associated plumbing, piping, mechanical, and electrical as shown on the drawings and described in the specifications. The contract time alloted for the completion of this contract is three hundred (300) consecutive calendar days.

Kentucky Engineering

Louisa, KY

Click Here to Order

Maysville Mason County Landfill Phase 4/5 Geocomposite Drainage Net

Maysville Mason County Landfill Phase 4/5 Geocomposite Drainage Net

This project will consist of geocomposite drainage net and related work for approximately 2.88 HORIZONTALLY MEASURED acres of the contained landfill.

S and ME

Maysville KY

click here to order

Lower Howards Creek Force Main Winchester KY

Lower Howards Creek Force Main Winchester KY

The project scope includes installation of approximately 18,050 feet of 24-inch force main, pig launching and receiving stations, buried valves and valve boxes, combination air release/vacuum valves, crushed stone pipe bedding, site clearing, site restoration, road and stream borings, concrete thrust blocks, and all related appurtenances and/or work.

Winchester KY

CDP

Click Here to Order

UK 2312.01 CAER Labratory #2 Bid package 5 Landscaping and Interior Signage

UK 2312.01 CAER Labratory #2 Bid package 5 Landscaping and Interior Signage

This package involves Mechanical, Interior Finishes and Specialty Rooms work for the new CAER laboratory #2, a 43 thousand SF research laboratory. The work will be performed under cobtract with the construction manager, Turner Construction Company and Finch Constructors.

UK Capital

Lexington, KY

Click Here to Order

UK Funkhouser Building Elevator Upgrade

UK Funkhouser Building Elevator Upgrade

The basic intent of this project and specifications is for the contractor to upgrade the Funkhouser Building Elevator to a fully operational and code compliant elevator system. The successful contractor shall construct the project based on, and satisfy all applicable requirements of surrent national, state and local codes and safety regulations include the ASME 17.2 2004 Edition, environmental requirements, the University of Kentucky Elevator Standard,(a notated copy specific to the Funkhouser Elevator is attached), and current requirements of teh Kentucky State Elevator Code and Inspection Department. this further includes, whether or not specified or not specified, provideing all work, equipment, and labor necessary and as required for the specific situations of the upgrade and modernization in the Funkhouser Building. All shall be completed to the University’s satisfaction. In general the elevator project includes: Complete upgrade and modernization of Elevator system and car. Installation of the Fireman Service and associated smoke detection system. Replacement of any worn or suspect parts anywhere in the system. Upgrading of Machine Room,hoistway, and pit code requirements, and providing upkeep and maintenance for the elevator from the signing of the contract through the end of the elevator warranty.

University of Kentucky

Lexington KY

Click Here to Order

Westhall Ave Main Replacement

Westhall Ave Main Replacement

Louisville Water Company is requesting Bids for the installation of 705 linear feet of 6-inch DR-18 C900 PVC water main using traditional trench installation techniques along Westhall Avenue, 155 linear feet of 6-inch Pressure Class 350 ductile iron water main using traditional trench installation techniques across Westhall Avenue and supply and install 275 linear feet of 6-inch HDPE Directional Drill water main along Westhall Avenue. Also included with the project are the installation of 1 fire hydrant and the transfer, renewal and relocation of 23 customer services. (See supplementary specifications for additional details). HDPE pipe will be supplied by the contractor. All other pipe and pipe appurtenances will be supplied by Louisville Water Company.

Louisville, Ky

Click Here to Order

Runway & Taxiway Overlay & Associated Lighting Project

Runway and Taxiway Overlay & Associated Lighting Project Addington Field Airport in Elizabethtown, Ky

Elizabethtown, Ky

Click Here to Order