City of Owingsville KY 111 and US 60 Sanitary Sewer Extensions
City of Owingsville KY 111 and US 60 Sanitary Sewer Extensions
Furnish and install approximately 12,709 LF of 6 & 8″ gravity sewer, approximately 10,443 LF of 3″ through 6″ force main, one 200 gpm duplex pumping station, 9 grinder pump stations and related appurtenances.
This project will consist of the purchase and installation of a floating diesel pump which will pump a modified sump within the pond at the compost pad. A new level gage for the determining actual pond depth will be installed at th epond overflow/discharge tube. A flexible line will need to be installed on the pump discharge to tie into the existing 6″ PVC discharge line exiting the pond. The discharge line out of the valve vault will take two underground routes. One will run north along the western edge of the compost pad. It will be 6″ schedule 80 PVC pipe which will run about 1100 feet. It will have a fire hydrant installed in it within 15 feet of the valve vault. Th eother discharge will run east along the southern edge of the compost pad. This line will be 4″ schedule 80 PVC pipe which will run about 400 feet. This line will have a “stub up” every 80-90′ of line. The 4″ schedule 802 PVC stub up will come above ground to a valve and a quick connect fitting with cap on the dischargd side of the valve. There will be a total of 4 stub up connections.
Haley Pike Landfill Leachate Treatment System Wetlands Improvements
Haley Pike Landfill Leachate Treatment System Wetlands Improvements
This project will consist of several steps which must be completed sequentially, within a very definite time line, and during the August/September 2011, time frame to take advantage of the normal dry period. During construction, the leachate system will continue to be in operation and care must be taken for said operation without damage to the existing system.
Public Garage Repairs Covington KY, Covington City Center Garage
RFB-213-11
Covington, Kentucky
The Public Garage Repairs – Lexington Financial Center Garage Project is comprised of concrete and waterproofing repairs. The work shall include all supported levels throughout the garage, and some miscellaneous repairs to slab-on-grade. The work includes:
The work will be performed primarily at night. Specific phasing restriction are included to ensure the garage remains open for business during normal business hours.
LYNN IMAGING, FRANKFORT, KY
Sanitary Sewer Improvements Buckner Municipal Force Main
Sanitary Sewer Improvements Buckner Municipal Force Main
This project consists of 1 sanitary sewer duplex pump ststion (100 HP Pumps), 20,050 1f of 16 C905 DR18 PVC force main, 1,040 1f of 4,6, and 8″ SDR 21 PVC force main, 9 Air/Vacuum Valves, 235 1f railroad & road bores, connection of 3 existing pump ststions to 16″ force main, Construction of a headworks structure at the KSR wastewater treatment plant, and the installation of approximately 6,500 square feet of asphalt in Oldham County Kentucky.
The City Of Versailles Tyrone Pike (US 62) Pedestrian Sidewalk
The City Of Versailles Tyrone Pike (US 62) Pedestrian Sidewalk
This project consists of 4,730+/- project ststion length consisting of sidewalks, road and driveway crossings, fence removal and replacing, retaining wall and miscellaneous appurtenances 3,500+/- lineal feet five foot wide sidewalks. 75+/- lineal feet of four foot wide sidewalks. 150+/- lineal feet of dry stone masonry or of concrete block retaining wall. 340+/- lineal feet remove and replace 42 inch+/- high chain fence. 476+/- lineal feet hoop and spear, 48 inch high, wrought iron fence.
Contract 4 Five Forks Area Sanitary Sewer System Expansion
Contract 4 Five Forks Area Sanitary Sewer System Expansion
This project consists of approximately 35,734 L.F. of 8-inch, 6-inch, 4-inch, 2-inch and 1 1/4 inch force mains, 1,755 L.F. of 10-inch gravity sewer and 150 residential grinder pump stations including all related appurtenances as shown on the drawings and specifications for the sewage collection system for the city of Louisa, Kentucky.
Boyd Co HS Rebid BP8 Aluminum Entrances/Windows and BP30 Security
Boyd Co HS Rebid BP8 Aluminum Entrances/Windows and BP30 Security
BOYD COUNTY BOARD OF EDUCATION (OWNER) will receive proposals through Codell Construction Company (CM) to furnish all labor and materials to complete Bid Package 8-Aluminum Entrances/Windows and Bid Package 30-Security at the BOYD COUNTY HIGH SCHOOL located at 14375 LIONS LANE, ASHLAND, KY 41102. Work is to be performed in accordance with plans, specifications, and addenda prepared by SHERMAN CARTER BARNHART (ARCHITECT), CMTA , INC. (MECHANICAL AND ELECTRICAL ENGINEER), and SHERMAN CARTER BARNHART (STRUCTURAL ENGINEER).
Contract 7 Louisa Interconnect Water Main Extension Improvements
Contract 7 Louisa Interconnect Water Main Extension Improvements
The program of work for which bids are to be submitted consists of approximately 6,610 L.F. of 10-inch ductile iron water main, The replacement of 2,465 L.F. of 6-inch SDR 21 class 200 water main and 47 residential reconnections including all related appurtenances as shown on the drwaings and specifications.
This project consists of the installation of the following: Automatic self cleaning filtration system, WTP building addition, and emergency generators, also included are all all associated plumbing, piping, mechanical, and electrical as shown on the drawings and specifications.
New Parking Lot Kentucky School of Arts and Crafts, Hazard Community and Technical College
RFB-211-11
Hindman, Kentucky
The project consist of the construction of a new parking lot on the east branch of Troublesome Creek in Hindman, Kentucky. This parking lot will be asphalt surfaced. There is an Add Alternate for a concrete surface. Fill material will be available on site to affect any grade changes. Site utility work will be included.
Work includes the replacement of the roofing system and clerestory windows and interior handicap accessibility improvements, site concrete, signage and striping at the Poplar Street Office Building.
Bid No. 11-52 / Foxcraft Road Main Replacement Project
Bid No. 11-52 / Foxcraft Road Main Replacement Project
Louisville Water Company is requesting Bids for the installation of 1,010 linear feet of 8-inch PVC water main along Foxcroft Road between 6716 Foxcroft Road and Tallwood Road. Also included with the project is the renewal of one fire hydrant, the transfer/renewal of 12 customer services, and one meter exchange.
City of Slaughters Reinforcement of Existing Lines Serving Whitsell St and Rhonda Lane
City of Slaughters Reinforcement of Existing Lines Serving Whitsell St and Rhonda Lane
This project consists of approximately 1,950 LF of new 3″ waterline to replace existing lines, 8 service line connections to existing meters, three highway bores, two open cust encasements, two flush hydrants, pavement repairs, and associated appurtenances.
Fire Alarm Upgrades-Meece Hall and Russell Ctr, Somerset Community College Various Campuses
RFB-209-11
Somerset, Kentucky
The Fire Alarm System will be removed and upgraded at both Meece Hall located on the Somerset Campus and the Russell Center located in Russell springs, Ky. An intelligent, addressable fire alarm system shall be provided. The system will comply with all manufactures’ requirements and shall report compatible alarm signals to the remote central system via an externally mounted dialer. The fire alarm system will monitor any and all sprinkler system flow switches, tamper switches, and duct mounted smoke detectors as well as heat detectors and smoke detectors. A remote annunciator panel will not be required as the lockable Fire Alarm Panel will be located at the entrance door to each building.
Roof Replacement Atwood Research Facility, Kentucky State University
RFB-205-11
FRANKFORT, KENTUCKY
The Work includes: Removal of existing single-ply roof – ballasted. Approximately 3,200 S.F. and Removal of existing single-ply roof – unballasted. Approximately 2,150 S.F. and Removal of existing asphalt shingle roof – . Approximately 12,200 S.F.
The Work also includes Repair/removal/replacement of existing roof substrate, as required. Substrate for all shingle roof and unballasted single-ply roof is plywood or wood boards (depending on location). Substrate for ballasted single-ply roof is rigid insulation over metal deck. Also, installation of new modified bitumen roofing system in areas where single-ply roof is removed; Installation of new glass-fiber-reinforced asphalt shingle roofing system in areas where asphalt shingle roof is removed. For continued project description see Summary, General Conditions.
This project includes removal of existing light fixtures, and installation of new exterior and interior lighting in the public spaces of the Kentucky Center. The lighting components will be controlled via a lighting control system. Project scope includes installation, power and control wiring, new light shelves and shield, and integration of existing lighting components.
This contract consists of approximately 18,000 feet of eight inch (8″) gravity sewer, 10,000 feet of four (4″) force main, 4,000 Feet of three inch (3″) force main, 3,500 feet of two inch (2″) force main, one hundred twelve (112) manholes, six (6) lift stations, and appurtenances.
This package involves Mechanical, Interior Finishes and speciality rooms work for the new CAER laboratory #2, a 43 thousand SF research laboratory. The work will be performed under contract with the construction manager, Turner Construction and Finch Constructors.