Princeton HA Bathroom Upgrades

Princeton HA Bathroom Upgrades

1. Bathroom Upgrade Base Bid (Three Bedroom Units)
a. Remove existing flooring and install new sheet vinyl with integral base
b. Remove existing plumbing features and install new tub/surround, water closet and vanity
c. Remove existing light fixtures and install new
d. Paint entire bathroom
e. Remove existing bathroom accessories and install new accessories

2. Bathroom Upgrade – bid Alternate No. 1 (Four Bedroom Units)
1. Bathroom Upgrade Base Bid (Three Bedroom Units)
a. Remove existing flooring and install new sheet vinyl with integral base
b. Remove existing plumbing features and install new tub/surround, water closet and vanity
c. Remove existing light fixtures and install new
d. Paint entire bathroom
e. Remove existing bathroom accessories and install new accessories

3. Bathroom Upgrade – Unit Price No. 1 and No. 2 (Two and Four Bedroom Units)
1. Bathroom Upgrade Base Bid (Three Bedroom Units)
a. Remove existing flooring and install new sheet vinyl with integral base
b. Remove existing plumbing features and install new tub/surround, water closet and vanity
c. Remove existing light fixtures and install new
d. Paint entire bathroom
e. Remove existing bathroom accessories and install new accessories

Princeton, KY

Click Here to View

Greenhouse at Franklin County High School

Greenhouse at Franklin County High School

Frankfort, KY

Click Here to Order

Yatesville Crossing Medical Office Building Shell and FitUp

Yatesville Crossing Medical Office Building Shell and FitUp

The project consists of a 20,733 SF, one shell office building, with a 3,226 SF fit-up for a medical clinic, and a 3,494 SF fit-up for a physical therapy office. Construction of the building consists of masonry/wood frame walls and a wood truss roof on a concrete foundation and masonry foundation walls. The project includes general construction, HVAC, plumbing, electrical and site/civil work.

Louisa, KY

Click Here to View

Buechel Basin Wastewater Systems – Phase IB and II (Alternate) Project

Buechel Basin Wastewater Systems – Phase IB and II (Alternate) Project

Louisville, KY

Phase IB of this project consists of the construction of two surge basins (one concrete, with the other earthen), chemical stabilization using lime, wet well with three high-capacity pumps, rock anchors, effluent gate structure, return flow valve vault, groundwater pump station, above-ground water storage tank, electrical building, standby generation systems, several low capacity pumps, screening building, perimeter drains, landscaping, buried piping, storm drainage, etc. associated with this project. Phase II of this project will be bid as an alternate to Phase IB and consists of construction of an earthen surge basin (approx.87.5 MG), chemical stabilization using lime, buried piping, two high-capacity pumps, landscaping, storm drainage, etc. associated with this project. All excess soil and rock will be stockpiled on-site for each Phase. The project is located to the south of Produce Road, east of Poplar Level Road and west of Jennings Lane.

Click Here to Order

Constitution Square Site Lighting Project

Constitution Square Site Lighting Project

Lexington, KY

Click Here to View

UK 2228.1 Student Health Steamline Project

2228.1 Student Health Steamline Project

To install underground steam piping from vault 50 next to KMSF to behind the Hunt Morgan Building. Modify tops on vault 50 steam and chilled water, the Hunt Morgan Vault. Install extension on Greenhouse Vault and new piping. Install new vault to replace existing dirt vault.

Lexington, KY

Click Here to Order

Madison Central High School Renovations Phase 3

Madison Central High School Renovations Phase 3

Madison Central High School Renovations Phase 3
Athletic Facilities and Greenhouse

Richmond, KY

Click here to Order

Kimper Elementary School Renovation

Kimper Elementary School Renovation

The project scope includes 3 seperate bid package that include the removal and replacement of exterior windows/doors, new HVAC system, and public restroom renovation. The work must be substantially complete no later than July 15, 2012.

Pike Co, KY

Click Here to View

RFB-173-12 Reroof & Enclose Concourses John H. Gray Bldg

RFB-173-12
This project is to extend the existing roof of the John H. Gray Building to cover the existing concourses at each end. These concourses have been repaired numerous times over the years. The existing center portion of standing seam metal roof (20,600 SF gabled roof at 2:12 slope) will remain in place, minimizing impact to on-going activities in the building. The flutes will be filled with rigid polyisocyanurate insulation, covered with ½” recovery board and roofed with 2-ply SBS modified bitumen roofing sheets. Seismic upgrades have been incorporated at each end of the building by Brown + Kubican as a separate project but the center part of the building has not been upgraded to meet current seismic code. The hip roofs at each end of the third floor will be removed and replaced with a gabled roof (7,575 SF each end, sloped at 2:12) to match the existing remaining center roof area. These roof areas will be extended to cover the entire Second Floor and eliminate the concourses at each end of the building.

A steel frame clerestory entry will be added to increase the stature of the building at the North End, signalling this as the main entry to the Administration Building and Student Services.

The existing brown fascia & soffit panels at the Third Floor Roof and panels at the mechanical penthouses will be updated with metal panels to look more like the Joe C. Davis Building and the Brown Badgett Energy and Technology Building. The new brick will match the existing brick with architectural detailing carried over from adjacent buildings.

The West end will be fit-up for a new Student Services area and the President’s Office, Academic Affairs and Development will be renovated / relocated across the corridor. For continued description, see the Special Conditions

Madisonville, KY

Click here to order

Olive Hill Arts and Education Center Renovation

Olive Hill Arts and Education Center Renovation

Olive Hill, KY

Click Here to View

Salyersville Water Plant Improvements Phase II

Salyersville Water Plant Improvements Phase II

The project consists of the rehabilitation of the mechanical processes, chemical feed systems, and updates to the instrumentation.

Salyersville, KY

Click Here to View

RFB-174-12 HVAC Controls Upgrade Hopkinsville Community College

RFB-174-12
This project consists of various upgrading of HVAC Control Systems for Hopkinsville Community College in Hopkinsville, Kentucky. The work generally consists of the following improvements: demolition of existing HVAC controls and selective HVAC equipment, installation of new HVAC controls, installation of new HVAC dual duct terminal unit; fabrication and installation of ductwork; electrical work; and testing, adjusting and balancing. The trades involved include, but are not limited to: HVAC, sheetmetal, mechanical, insulation, HVAC controls, electrical, and testing/adjusting/balancing. The work must be performed while the buildings are occupied. It is expected that most of the work must be performed after-hours so as not to disturb normal college operations.

Hopkinsville, Kentucky

click here to order

RFB-172-12 HVAC Upgrade State Office Building

RFB-172-12
The scope of work consists of the demolition of the two existing pipe fan coil systems and attendant equipment serving the building located at 139 East Irvine Street, in Richmond, Ky. including but not limited to boilers, pumps, piping, controls, dampers, fans and replacing with a new variable refrigerant flow system. A dedicated make up air system with DX cooling coil, air cooled condensing unit, electric duct heater and ductwork is also included. This project includes an allowance of $18,000.00 to be included in the Contractors base bid for additional control work as indicated on the drawings to be performed by InnerSpace. The office building will be occupied during normal working hours 7am to 5pm hence all work must be done after hours and on weekends and all work areas must be cleaned at the end of each shift. A work schedule must be submitted and approved prior to beginning work on the project.

Richmond, Kentucky

Click here to order

RFB-155-12 Stream Restoration Elisha Creek

RFB-155-12
The work for this project consists of the restoration of 4,067 LF of the Left Fork of Elisha Creek and 160 LF of an unnamed tributary, including but not limited to construction of in-stream structures, excavation of proposed channels and floodplains, reshaping of existing channels, native planting and seeding, preparation of soil for seeding, planting of trees and shrubs, installation of erosion control fabric and mulch, and harvesting, transporting, installing, and maintaining live stake and rooted materials.

Leslie County, Kentucky

Click here to order

Fiber-Optic Pathway and Cable Installation

Fiber-Optic Pathway and Cable Installation

The project includes installation along three different corridors shown in the construction documents. Specifics consist of the installation of conduit, communication pull boxes, overhead span, utility poles, cable and related items covered in the Bid Schedule, plus incidentals necessary to complete the work.

Lexington, KY

Click Here to View

Middletown Streetscape Phase V

Middletown Streetscape Phase V

Main Street in Middletown new sidewalks, curbs, drainage and landscaping from City Hall east to Evergreen Drive. A distance of approximately 0.41 miles. Demolition of existing concrete sidewalks and curbs, apshalt pavement and other miscellaneous itemts to be removed as indicated on drawings. New construction will consist of concrete/brick sidewalks, concrete curb and gutters, asphalt pavement and base, crosswalks and other miscellaneous items.

Middletown, KY

Click Here to View

Robinson Forest Land Stabilization Project

Robinson Forest Land Stabilization Project

The construction of the gabion retaining wall and soil retaining wall and soil re-compaction in Robinson Forest, Clayhole KY.

Clayhole, KY

Click Here to View

Red River Wastewater Treatment Plant

Red River Wastewater Treatment Plant

Contract 584-09-02 Expansion of the Staton (to become Red River Wastewater Authority) wastewater treatment plant from a capacity of .045 million gallons per day to a capacity of 1.4 million gallons per day. the construction will include a new and upgraded influent pump station, new grit and screening facilities, new aeration basins, new clarifiers, new UV disinfection, new post aeration building, new sludge handling building with sludge press and a new administration building.

Powell Co, KY

Click Here to Order

Red River Wastewater Conveyance System

Red River Wastewater Conveyance System

Red River Wastewater Conveyance System Clay City to Stanton
Contract 584-09-01

Furnishing and installation of approximately 28,100 LF of 12-ince PVC force main and accessories.
Furnishing and installation, at various locations, of 20-inch steel cover pipe, bore, and accessories.

Powell Co, KY

Click Here to Order

Stonewall Elementary School

Stonewall Elementary School

The work includes the renovation of the existing school with new additions for a total of 78,176 SF. Teh existing school has approximately 60,588 SF and the additions have 17,588 SF – all part of a one-story building, though the existing Gymnasium flor is 3′-9″ lower than the main building floor elevations. Stonewall Elementary School was originally built in 1960 with major building additions in 1962, 1965, 1974, and 1979. The scope of work for this current major construction project includes, but is not limited to: selective and building demolition, removal and replacement of mechanical systems including installation of variable refrigerant volume systems, replacment of existing electrical systems, fire protection, fire alarm systems, interior finishes (walls, ceilings, floors, and base), door hardware, site improvements and paving, replacement of kitchen equipment and the addition of 17,588 SF of new administrative area, stage, interior ramped corridor connection to Gym, media center, classrooms and secondary entry vestibules. The work effort will be executed in four principal phases beginning in April/May 2012 and ending in December 2013. The building will be occupied during all phases of construction work.

Lexington, KY

Click Here to View

City of Munfordville Foodland Sewer Project

City of Munfordville Foodland Sewer Project

The work consists of installing 715 linear feet of 8-inch sewer, 7 property service connections, 4 manholes with castings, 1 drop manhole with casting and associated appurtenances. 78 linear feet of the 8-inch sewer pipe is to be installed in an existing steel casing pipe previously installed by another contract. This contract will provide the necessary spacers, bulk head, and appurtenant items necessary to complete the crossing

Munfordville, KY

Click Here to Order

RFB-169-12 HVAC Repairs White Hall State Historic Site

RFB-169-12
This project involves the removal of the seven (7) water source heat pumps and installing new units, installing a new salt free water softener, installing new DDC controls on new heat pumps and making an interface to existing electrical controls on existing heat pumps. Add to the existing DDC controls so Frankfort can see new heat pumps that are being installed and to interface with the existing heat pump systems.

Richmond, Kentucky

Click here to order

Colonnade Repairs

Colonnade Repairs

This project is repair of the Colonnade with will require expertise in stone/limestone repairs, concrete repairs, urethane membranes, and sealants.

Bowling Green, KY

Click Here to Order

Morgan Co Elementary School

Morgan Co Elementary School

The project scope includes a new elementary school approximately 65,000 square feet of new construction. The work must be substantially complete no later than June 30,2013.

West Liberty, KY

Click Here to View

RFB-168-12 Demolition and Site Utility Relocation

RFB-168-12
The project consists of the prepatory work to accommodate the new construction including the demolition of the existing Brockton Apartments, relocation of the storm line, relocation of the sanitary line and construction of new parking.

Richmond, Kentucky

Click here to order