US 42 Waterline Relocation
US 42 Waterline Relocation
This contract consists of approximately 2,600 feet of 3 inch water line and its appurtenances.
Carroll Co, KY
US 42 Waterline Relocation
This contract consists of approximately 2,600 feet of 3 inch water line and its appurtenances.
Carroll Co, KY
Phoenix Building and Police Headquarters Building Elevator Renovation Project REBID
The renovation of 4 elevators located in 2 different buildings. The Phoenix Building has a 3 car group of traction elevators serving 7 stops. The Police HQ Building includes a simplex hydraulic elevator serving 5 stops. Renovation includes but is not limited to the replacement of the elevator controllers, ropes, hall call buttons, put ladders, car operating panels, updating of elevator wiring and cab interiors, fire alarm modifications and other emergency operating system. This project is divided into a base bid and 1 bid alternate. The base bid includes all work related to the three traction elevators in the Phoenix Building and bid alternate 1 includes all work related to the renovation of the simplex hydraulic elevator in the Police HQ Building.
Lexington, KY
Morehead Housing Authority Water Heater Replacements
Water Heater Replacements
Morehead, KY
2343.1 Revise Sanitary Sewer on Rose Lane
The project will relocate an existing 12” clay sanitary sewer pipe that is currently located bisecting the middle of the lots 470, 468, 462, 460, 456, 454, 452, 450 and 448 along the west side of Rose lane. The existing sanitary sewer will be intercepted at the property line where 453 Woodland adjoins 470 Rose Lane. The proposed new sewer location will run east along Woodland and then turn to run parallel with Rose lane approximately 5 to 10 feet to the east of the existing Rose Lane sidewalk. The new 12” PVC line will include sanitary manholes as needed to provide connections for future development along Rose lane. All sanitary sewer work will be installed and tested following LFUCG regulations. The new sanitary line will extend to Lot 448 on Rose lane and reconnect with the existing at a manhole on lot 448 Rose Lane. The existing sanitary sewer lines crossing Rose lane in the vicinity of Transylvania Park will also be connected to the new line being installed. Existing Structures on Rose lane will also be reconnected to the relocated sewer line. The installation of the new sanitary line is expected to require trench rock excavation, temporary bypass pumping and restoration of sidewalks and driveways along Rose Lane. There are many utilities in the area and some coordination and possible relocations of water and gas service lines is expected.
Lexington, KY
2351.0 Joe B Hall Wildcat Lodge Abatement/Demolition
The building to be demolished is located at 347 Lexington Avenue, Lexington KY and consist of removing all structures, foundation walls, footings, landscaping, sidewalks, utilities, etc, as indicated.
Building: 20,788 sq ft, 2-story residence hall built on a partial basement under half of the footprint. The structure consists of wood framed construction with wood siding on concrete foundations. First floor and partial basement concrete slabs on grade.
Roof: Partial sloped shingle roof on wood framing and partial low sloped built up membrane roof on wood framing
Interior Construction: wood framing and gypsum board finish
Sidewalks and Porches: Concrete slabs on grade, remove as noted in documents. Walk at street to remain
Attic: None
Foundation Walls: Case in place concrete
Chimney: Masonry
Parking Lot: To remain
Trees and Landscaping: Remove as noted in documents
Elevator: To be removed in its entirety
PME Systems: To be removed in their entirety as indicated in the documents
Hazardous Materials: To be removed in their entirety as identified and indicated in the documents
Lexington, KY
Slone Research Building and Bowman Hall Renovations
Slone Research Building Rooms 108 & 111 Renovation and Bowman Hall Rooms 3 & 5 Renovation
Lexington, KY
Fountain Square Beautification REBID
The scope of construction includes the demolition of the existing fountain, sidewalks, walls, site amenitites and electrical components, the installation of a new fountain, sidewalk pavement with pavers, light poles and fixtures, irrigation, landscaping, retaining walls and seat walls.
Somerset, KY
Payne Gap Waterline Extension Phase II, Contract 1 Waterlines
Work includes the installation of 10, 8, 4 and 2 inch waterlines, pressure reducing vaults and appurtenances.
Jenkins, KY
Hopkinsville Housing Authority Fire and Floor Units Repair
Work includes in the flood unit 3A, the replacement of the vinyl and ceramic tile flooring and baseboards, the repair of a second floor joist, limited drywall repair, removal of the kitchen cabinetry, living room ceiling replacement, and preparations for painting. Work for the fire unit 6A includes replacement of ceiling and overhead insulation to kitchen, living room and hall. Replacement of wall board, wall insulation and any needed studs in kitchen and one-third of living room. Replacement flooring, baseboards, clan and prearation for paint throughout. Replace to window sashes (to be provided by owner) and one double pantry door. Relocate electrical panel.
Hopkinsville, KY
Payne Gap Waterline Extension Phase II, Contract 2 Water Storage Tank
Work includes the installation of a 294,000 gallon water storage tank, valve vault, access road and appurtenances.
Jenkins, KY
AML Waterline Extensions Hyden-Leslie Co Water District
Hyden-Leslie Co Water District
Contract No II-B – AML Waterline Extensions
a. 6″ CL 200/250 PVC Waterline – 11,000 LF
b. 4″ CL 200/250 PVC Waterline – 32,000 FL
c. 3″ CL 200/250 PVC Waterline – 50,000 LF
d. 3″ Class 350 Ductile Iron Waterline
e. 1-3/4″ Service Line – 8,000 LF
f. 6″, 4″, 3″ Gate Valves – 50 EA
g. 5/8″ x 3/4″ Radio Read Meter Assemblies – 80 EA
h. Above Ground Booster Pump Station – 3 LS
RFB-92-13
This project includes the repairs to the existing exterior stairs at each end of the lodge guest room buildings which were originally constructed in the 1960’s and have suffered deterioration due to exposure of reinforcing steel and embedded metals. The stairs will be repaired by a complete removal of all precast stair treads, replacing those with new precast treads. All existing steel support members shall be cleaned of all existing paint sandblasted and recoated with new high performance paint. All existing hand rails shall be removed, repaired, cleaned and repainted. All railing posts to be sent into new precast stair treads shall be repaired prior to reinstallation.
Jamestown, Kentucky
US 25X Sidewalk Project City of Dr Ridge
This contract consists of installing approximately 1,100 linear feet of sidewalk and appurtenances. All bidders must be pre-qualified with the Kentucky Transportation Department.
Dry Ridge, KY
A price contract for a portion of Louisville Metro Government’s need for maintenance and repair of passenger elevators for a twelve (12) month period
Louisville, Ky
Division 1 – Lentzier Creek Sanitary Sewer Project
This project consists of the furnishing and installing of a new pump station, construction of 9,185 LF of gravity sewers, 5,693 LF of parallel force main (total 11,386 LF), surface restoration, and all other items shown on the plans and mentioned in the specifications for a complete project.
Jeffersonville, IN
Master Plan Improvements Phase 3
Approximately 5,130 LF of 6″ PVC and 2,690 LF og 4″ PVC and other items.
Salvisa, KY
RFB-89-12
The project will consist of installing drainage control and closing three portals in the edge of the woods behind a residential area and livestock field. A 5 feet high keystone block wall with retaining wall subdrain will be installed behind the Clayton Christian residence.
All material excavated from the portal closure activities, wall construction, and subdrain construction will be wasted in the livestock field behind the Gregory Woods residence.
Three collapsed portals are located along the treeline. These portals will be opened and a wildlife closure (AMLPC9) placed in each of these.
No stream crossings will be required during construction activities.
For continued description, see Special Conditions.
Lawrence County, Kentucky
RFB-88-13
The work shall provide for the Pike County District Office Building Re-roofing, inclusive of all accessories and miscellaneous work required to provide a complete water tight roofing system. The project is approximately +- 14,000 s.f. of roofing. All work required shall be executed in strict compliance with all manufacturers recommendations, regulatory codes, and/or governing agencies with jurisdiction over this project.
Pikeville, Kentucky
Division 2 – Lentzier Creek Force Main
This project consists of the furnishing and installing of 10,946 LF of parallel force main (total 21,892 LF), surface restoration, and all other items shown on the plans and mentioned in the specifications for a complete project.
Jeffersonville, IN
Hopkins Elementary School Renovation Bid Package 2 – Renovation of the 1954 Building
This project includes the renovation of the existing 1954 classroom portions of the Hopkins Elementary School. The approximate square footage is 24,202.
Somerset, KY
Meadows Northland Arlington Neighborhood Improvement Project Phase 5A
Construct all associated sanitary and storm sewer piping, and structures as shown on the construction plans and specifications for the Meadows-Northland-Arlington Neighborhood Improvement Project, Phase 5A. Provide all demolition, erosion control measures, concrete side3walk, curb and gutter, and asphalt paving as required for the project.
Lexington, KY
Division 2 – Lentzier Creek Force Main
This project consists of the furnishing and installing of 10,946 LF of parallel force main (total 21,892 LF), surface restoration, and all other items shown on the plans and mentioned in the specifications for a complete project.
Jeffersonville, IN
Old Frankfort Pike Dry Stone Fence
Construct a dry stone fence along a portion of Old Frankfort Pike in Lexington, KY which is designed to mimic an existing dry stone fence found on the property opposite of Old Frankfort Pike. Work items shall include the construction of approximately 708 linear feet of dry stone fence, construction staking, demolition of existing retaining wall portion, earthwork, sediment and erosion control measures, and site restoration.
Lexington, KY
HG611 Renovate into Classroom
Convert the existing space into a classroom.
University of Kentucky
Lexington, KY