City of Maysville – Maysville Sewer Line Extension Project
City of Maysville – Maysville Sewer Line Extension Project
PROJECT DESCRIPTION: The Project consists of constructing approximately 27,100 linear feet of 6″, 8″, and 10″ PVC
gravity line and 4″ and 8″ PVC force main connecting the Maysville Mason County Landfill
(MMCL) to the downtown Maysville Sanitary Sewer System, as well as the construction of two
pump stations. The project contains approximately 580 linear feet of jack-and-bore installation of
steel casing pipe under streams, railroads, state highways, and public driveways, approximately 470
linear feet of open-cut installation of steel casing pipe at private landfill roads, creeks which arc not
waters of the United States, and above culverts/high-pressure gas lines, and approximately 80 linear
feet of concrete encasement at creek crossings that arc not waters of the United States.
PROJECT DESCRIPTION: The project site is located at 6000 KY-38, Evarts, KY 40828. The bid is to furnish all necessary
labor, materials, tools, machinery, warranties, and all other items required to replace existing
standing seam metal roof.
City of New Albany – Basin 16 Sanitary Sewer Improvements
City of New Albany – Basin 16 Sanitary Sewer Improvements
Please Note: Addendum 1 has changed the Bid Date
PROJECT DESCRIPTION:
The Work of the Project is divided into two Divisions. Bids may be submitted for Division A only, Division B only, or for Divisions A and B
together.
Division A Includes the installation of a 1.6 million
gallon wet weather sanitary sewer equalization basin utilizing approximately 2,700 lineal feet of 120-
inch diameter sanitary sewer pipe, approximately 114 lineal feet of 24-inch, 304 lineal feet of 18-inch,
and 6 lineal feet of 12-inch sanitary sewer, 12-inch and 24-inch storm sewer, sanitary and storm
manholes, excavation and grading, site restoration and appurtenant work. Also includes the
installation of a dewatering pump station with submersible pumps, 8’ diameter wet well and valve
vault, 5’ diameter meter vault, and approximately 439 lineal feet of 8-inch sanitary force main.
The estimated construction cost range for Division A is $3.6-4.2M.
Division B Includes the installation of approximately 3,226 lineal feet of 24-inch, 913 lineal feet of 18-inch,
and 40 lineal feet of 15-inch diameter gravity sanitary relief sewer ranging in depth (average between
manholes) from 8 to 16 feet, sanitary sewer manholes, HMA roadway and site restoration, and appurtenant work.
The estimated
construction cost range for Division B is $1.5-2.0M.
The work is limited to removal and replacement of approximately 165 squares of various types of roofing systems at Cumberland Falls Lodge as well as repairs to exterior envelope construction assemblies and exterior painting. The scope of work includes removal of existing shingle and low-slope roofing systems in all areas except for two small areas recently replaced. New copper and metal flashings, and limited replacement of existing gutter and downspouts are included as well as limited repair/replacement of wood soffits, trim and fascia Restoration cleaning and masonry cutting and pointing are included. Exterior painting and installation of an OSHA compliant engineered fall protection system is included within the scope of the project. Alternate pricing includes additional gutter and downspouts, infill of existing ventilation louvers and added roof ventilation.
This project consists of upgrading the Hopkinsville Community College existing campus site lighting fixtures with new LED lighting fixtures. The project also includes removal of several lighting poles/fixtures and providing new poles and fixtures within a few select areas. In some locations, multiple fixtures will be installed on existing poles
Design Build Roofing Replacement for the Alexander Building – 180095
Design Build Roofing Replacement for the Alexander Building – 180095
PROJECT DESCRIPTION:
Louisville Metro Government is soliciting Design/Build proposals for a new roofing replacement
on the Alexander Building located at 745 West Main Street, Louisville, Kentucky.
Louisville Metro Government uses Bonfire portal for accepting and evaluating proposals digitally (https://louisvilleky.bonfirehub.com/portal)
. Bidders must submit all pages of bid document through Bonfire. Sealed Proposals must be uploaded,
submitted, and finalized prior to the closing at 12/7/17 3:00pm. The bid document and drawings
are available on Bonfire and Lynn Imaging, all other forms, documents and attachments are available
on (https://louisvilleky.bonfirehub.com/portal).
PROJECT DESCRIPTION:
The scope of work includes the removal of existing metal halide light fixtures
from inside the existing gymnasium and installation of new LED light fixtures.
David Hawes WWTP Headworks, UV, and Electrical Improvements
David Hawes WWTP Headworks, UV, and Electrical Improvements
PROJECT DESCRIPTION:
The Work includes installation of a new influent metering structure, screening equipment and building,
and UV equipment and building at the David Hawes WWTP and related improvements.
PROJECT DESCRIPTION: The Plum Street Parking Lot project consists of the installation of approximately 4,400 square
yards of medium duty asphalt pavement, including all earthwork, hauling, grading, demolition,
storm sewers and all other appurtenant work.
Laurel County Correctional Center – Sanitary Sewer Extension
Laurel County Correctional Center – Sanitary Sewer Extension
PROJECT DESCRIPTION:
The primary scope of work includes the installation of approximately 1,193 LF of 12-inch gravity
sewer, approximately 316 LF of 8-inch gravity sewer, approximately 1,535 LF of 8-inch force
main, approximately 695 LF of 2-inch HDPE waterline, one triplex pump station and valve vault,
a control building including gravel drive, and related appurtenances.
This project consist of the construction of a 15,770 GSF building to house training space, classrooms and offices. The high-bay training space will be constructed utilizing a pre-engineered metail building structure while the support spaces of classrooms, offices and utilities will be constructed utilizing cold-formed metal framing with light gage metal roof trusses. The roof will be metal roof while the exterior walls will be a combination of metal wall panels and masonry veneer. Interior wall construction will be primarily metal stud with gypsum board. Interior finishes include sealed concrete, paint and acoustical ceiling tile. Plumbing includes exterior and interior domestic water mains, interior sanitary and vent piping, exterior sanitary sewers, plumbing fixtures and domestic water heaters. Fire Protections includes exterior meter and pit, exterior water main, fire hydrants, interior piping, valves, alarm devices and heads for 100% of building. Electrical work includes new electrical distribution system, panelboards, wiring devices, light fixtures and lamps, fire alarm system, TV and telephone services, motor and electrical equipment connections, exterior lighting, SPD service equipment protection, and emergency power systems. HVAC includes installation of packaged grade mounted gas fired/dx cooling unit, with supply and return ductwork routed into building to VAV boxes with electric heat on building automation system for control off the offices/classrooms. The high bay space is heated and ventilated with infrared gas fired heaters, large volume fans, intakes and exhaust fans.
LFUCG – Family Care Center Courtyard Restoration & Accessibility Project
LFUCG – Family Care Center Courtyard Restoration & Accessibility Project
Please Note: Addendum 2 has changed the Bid Date
PROJECT DESCRIPTION: Consisting of the construction and/or furnishing of items for the Family Care
Center Courtyard Restoration & Accessibility Project, Lexington-Fayette County,
Kentucky.
Estimate:
$298,585.00 Estimated Length of Project:
(Substantial Completion) + 120 Calendar Days (Final Completion)
Silt control measures at each site shall be installed and remain in effect until construction is completed at that site. This project includes 12 portal closures, drainage controls including ditches and subdrains, culverts and headwalls, excavation to rock for a slide, and a waste area. Bituminous repair, including roadway stone, has been factored into the contract. Revegetation of the site, including agricultural limestone, fertilizer, mulch and seed will be done according to standard AML design specifications.
The Work consists of removing and disposing the existing life safety intercom system at the Kentucky Correctional Psychiatric Center and replacing with a new life safety intercom system. During construction KCPC shall have a fully operational life safety intercom system at all times. Construction sequencing is required as indicated on the construction documents. All devices, wiring, cabling, conductors, power supplies, equipment racks, LAN shall be new. Owner will supply some speakers and horn devices as indicated. Existing raceways may be reused.
This renovation project is for the Fleming Armory Storage building located at Boone National Guard Center in Frankfort, KY. Approximately 605 linear feet of wire caging partition walls are to be installed and integrated into the existing facility that currently includes several caged storage areas. 30 working days are provided from start of construction to substantial completion. 15 working days are provided from substantial completion to final completion. The contractor will be responsible for coordinating areas of construction with the Owner. The contractor will be required to communicate and work closely with the Owner for project logistics, including shut downs (where applicable), construction sequencing, and general construction activities
PROJECT DESCRIPTION:
Furnishing of all labor, materials, supplies, tools,
services, etc., necessary for:
NEW ASPHALT PAVING
ANDERSON COUNTY BUS GARAGE
ROBERT B. TURNER ELEMENTARY SCHOOL
ANDERSON COUNTY MIDDLE SCHOOL