CCK-3187.10-1-26 Kroger Field Repairs 2026- Lower Bowl Concrete & Waterproofing
CCK-3187.10-1-26 Kroger Field Repairs 2026- Lower Bowl Concrete & Waterproofing
• The Lower Seating repairs occur between stadium Gate 1 and Gate 4.
• The work focuses on the precast concrete seating units at Row 1 through Row 51 in Section
1 through Section 11.
• Repairs include removal and replacement of the waterproofing membrane and all sealants at
the precast seating units.
• Rewelding and repairs of steel connections between precast seating units, repairs at rails, and
installation of supplemental steel brackets.
• Repair of concrete deterioration at the precast seating units and support framing.
• Installation of new drains at the lower row and repairs at existing drains.
• Preparation and painting of steel framing, support members, and concrete wall panels.
• The existing bleacher-style seats will be temporarily removed and reinstalled upon
completion of the work in the Lower Seating.
Mountain Comprehensive Health Corporation – MCHC – Pharmacy Drive-Thru Alteration
Mountain Comprehensive Health Corporation – MCHC – Pharmacy Drive-Thru Alteration
The project site is located at 226 Medical Plaza Ln, Whitesburg, KY. The bid is to furnish all
necessary labor, materials, tools, machinery, warranties, and all other items required to meet
the plans and specifications. Work to include, but not limited to: Interior and exterior concrete,
brick masonry, structural steel framing, interior finishes, 60 mil rubber roofing, aluminum
doors/windows, Electric, Plumbing, HVAC, casework, earthwork, grading, asphalt paving, and
storm drainage.
Laurel County Board of Education – Laurel County Day Treatment – Phase 2
Laurel County Board of Education – Laurel County Day Treatment – Phase 2
The Phase 2 Project at the Laurel County Day Treatment campus in the Bush community is
centered on renovation of the Existing Gymnasium and associated spaces. The main
gymnasium will receive new windows, HVAC equipment, lighting and electrical fixtures,
repaired flooring, and refreshed finishes. The existing stage area will be demolished and
replaced with new floor structure at the same elevation as the main gymnasium. That space will
then contain new restrooms, janitorial, and storage spaces. The space between in the existing
stage opening will receive new infill framing and casework. The existing basement floor will
be reworked to accommodate new footings and mechanical equipment. New double doors and
exterior access will be provided for this unoccupied space at the back of the gymnasium.
Existing abandoned openings on the rear and side of the gymnasium will be infilled with
matching stone finishes. All existing exterior walls associated with Phase 2 will be cleaned. A
new canopy and ramp will be constructed at the existing exterior gymnasium door. A new
decorative main entrance gate will be constructed at the southern entrance, and a non-decorative
gate constructed at the southern entrance. Some selective ceiling demolition and replacement in
the existing Phase 1 corridor to facilitate Domestic Water, Sprinkler, and Power services to be
extended to Phase 2 will be required. This work will allow the campus to utilize this space in
day-to-day instructional activities and preserve the historical space for the community.
DeSales High School will receive sealed bids for the furnishing of all labor and materials and the performance of
all work required for the
DeSales High School
Innovation Center Addition.
CCK-3187.20-1-26 Kroger Field 2026 Repairs- Upper Bowl Concrete & Waterproofing
CCK-3187.20-1-26 Kroger Field 2026 Repairs- Upper Bowl Concrete & Waterproofing
PROJECT DESCRIPTION
Includes:
• Upper Concourse Concrete & Waterproofing Repairs.
• Prepare and install a waterproofing membrane on the structural slab, stairs, and
bridges. Work includes replacement of sealants.
• Repair of concrete deterioration and rebuild the slab edge at concourse expansion
joints.
• Replace concourse expansion joints.
• North Loft Club Seating Concrete & Waterproofing Repairs.
• The Loft Club Seating repairs occur between stadium Gate 1 and Gate 4.
• The work focuses on the precast concrete seating units at Row 1 through Row 7 in
Section 101 through Section 210.
• Repairs include removal and replacement of the waterproofing membrane and all
sealants at the precast seating units.
• Rewelding and repairs of steel connections between precast seating units, repairs at
rails, and installation of supplemental steel brackets.
• Repair of concrete deterioration at the precast seating units and support framing.
• Preparation and painting of steel framing, support members, and concrete wall
panels.
• Installation of new drains at the lower row and repairs at existing drains.
• The existing bleacher-style and regular seats will be temporarily removed and
reinstalled upon completion of the work in the Loft Club Seating.
Estimated Length of Project:
(Substantial Completion) + 90 Calendar Days (Final Completion)
Drainage from eligible works are located upslope of the citizen’s residence impacting the residence and yard area. A slide has also occurred on the slope behind/beside the citizen’s residence impacting yard drainage. This project addresses the slide removing a quantity of material and grading the remainder in place in a stable configuration. The existing ditch adjacent to the slide area will be excavated to rock. A Concrete Block-Tied Mat ditch will be installed from the top end of the excavated rock ditch to a planned drop box at the toe. Drainage will also be collected by installation of subdrain along the toe of the highwall. All collected drainage will be routed to a second drop box installed on the existing pipe crossing KY-194 and ultimately the roadside ditch. Concrete Block-Tied Mat ditches will also be installed to control surface drainage from the adjacent roadway and conduct drainage down the slope to the drop box and existing culvert. A culvert with inlet headwall will be installed between the concrete block-tied mat adjacent to the state roadway and drop box to allow access. All material generated by construction activities will be wasted onsite
Clark County Project Development Board – A/E RFP Documents
Clark County Project Development Board – A/E RFP Documents
The Clark County Project Development Board (PDB) proposes to
construct a new judicial center to be located in Winchester,
KY. The PDB invites interested architectural firms to
electronically submit a Court of Justice Architect-Engineer and
Related Services Questionnaire to the Administrative Office of
the Courts.
Cawood Water District – US 421/KY 3001 Waterline Replacement – Contract 2
Cawood Water District – US 421/KY 3001 Waterline Replacement – Contract 2
The project consists of replacing approximately 5,750 L.F. of 8″ and 3″ waterline, one
pressure reducing station, and all necessary appurtenances along US 421 and KY 3001
in Harlan County.
The project involves roof work at the Hazard Community and Technical College on the Heavy Equipment, Devert Owens, Walter Prater, and First Federal buildings.
The Heavy Equipment and Devert Owens buildings will both have their existing roofs completely removed and replaced with a new two-ply SBS modified bitumen roofing system installed over new insulation and cover board.
The Walter Prater building will receive a recover roof system, with a new two-ply SBS modified bitumen roof installed over a cover board set above the existing roof. Any surface defects in the existing roof will be repaired before the new system is installed.
The First Federal building will have all four gutter roof areas replaced with a new fluid-applied roofing system. The standing seam metal roof will also be prepped and repainted, with a new coping cap installed over the existing stone coping cap on the metal roof sections to match the low-slope roof areas, along with miscellaneous tuckpointing of the stone cornice.
The Devert Owens building will also include repainting the scupper/downspout boots, the canopies, the metal siding and siding at the higher building section.
All work includes new flashings, accessories, and related sheet-metal components.
Jefferson County Public Schools – Chiller Replacement – Jeffersontown High School
Jefferson County Public Schools – Chiller Replacement – Jeffersontown High School
The primary scope of work for this project is to replace the chillers
and pumps serving Jeffersontown High School, including electrical
upgrades required.
Jefferson County Public Schools – Boiler & Chiller Replacement – Barret Traditional Middle School
Jefferson County Public Schools – Boiler & Chiller Replacement – Barret Traditional Middle School
This project consists of a central plant replacement at
Barret Traditional Middle School in the Jefferson
County Public School District. The existing gas-fired
hot water boilers and chillers will be replaced along
with all existing chilled water, hot water, and building
pumps. The existing piping will be reworked to support
these replacements, and the chiller enclosure will be
expanded to accommodate the new equipment.
The electrical scope is also limited to supporting these
replacements.
The existing chillers shall be delivered and turned over
to JCPS and all new equipment shall be furnished and
installed by the contractor.
Hardin County Board of Education – Trojan Way Elementary School
Hardin County Board of Education – Trojan Way Elementary School
The project consists of a new two story Elementary School with a community storm
shelter for the Occupants. The design capacity is for 800 students. The overall gross
square feet footage is approximately 109,000 sf.
This project provides for the renovation of the existing men’s and women’s restrooms and locker rooms at E.P. Tom Sawyer State Park Pool and Recreation facility, Louisville KY
The work scope will involve the following features:
• Renovation of men’s and women’s restrooms on the main level.
• Renovation of men’s and women’s locker room facilities.
• Removal and replacement of all plumbing fixtures, faucets, flush valves, hangers and supports, floor drains and related accessories.
• Removal and replacement of all waste and vent piping including all underground sanitary waste and vent piping.
• Removal and replacement of all domestic hot, cold and hot water return piping including water heaters and main service backflow preventer.
• Provide trench drain covers for the existing drain troughs.
• Preparation of flooring for new resinous flooring.
• Preparation of walls in the restrooms and locker rooms for new paint.
• Removal and replacement of existing ceilings in the restrooms and locker rooms. New ceilings in the locker room areas will be moisture resistant lay-in type.
• Providing new ADA casework, shrouds and undermount lavatories for restrooms and locker rooms.
• Construction of new block walls to separate shower stalls in the Men’s shower room.
• Provide power for mechanical equipment and plumbing water heaters and associated equipment.
• Demo existing light fixtures and reuse existing power circuits for new lighting fixtures in newly remodeled areas.
• Demo existing receptacles and reuse existing power circuits for newly installed receptacles in newly remodeled areas.
• Add new power for hand dryers as required.
• Modify existing power panels as required for new mechanical/plumbing equipment.
• Remove existing locker room/restroom energy recovery ventilator DX cooling coil, remote air-cooled condensing unit, refrigerant piping, condensate drain piping, electronic controls.
• Provide new duct-mounted DX heat pump coil, refrigerant heat recovery dehumidification coil, refrigerant piping, condensate drain piping, remote air-cooled heat recovery heat pump, and direct digital controls for locker room/restroom HVAC.
Southern Water and Sewer District – Water Treatment Plant Improvements REBID
Southern Water and Sewer District – Water Treatment Plant Improvements REBID
The work to be REBID is described as follows:
CONTRACT 412-23-01, WATER TREATMENT PLANT IMPROVEMENTS
Perform work at the Southern Water and Sewer District to improve function of
existing equipment.
City of Somerset – Horse Soldier Gas Line Extension
City of Somerset – Horse Soldier Gas Line Extension
The project consists of installing approximately 8,640 L.F. of 8” HDPE natural gas main,
along KY 914 via open trench and directional bore installation methods and all other
necessary appurtenances.
The project is a full replacement of the marina. The work includes replacing all walkways, frames and floats.
Walkways will have concrete panels for surfacing. The head dock building will be replaced. Dock A – Dock E are all being replaced and will have covered slips. Landside utilities will all remain in place except for the fuel tank and fuel line that serves the marina. A new fuel tank and fuel line will replace the existing system. All water side utilities will be replaced.
The contractor shall follow the staging plan provided in the construction drawings that will permit all boats to remain in the water throughout construction.
The King’s Daughters Medical Center Wound Center Relocation is located at 1000 Ashland
Drive, Russell, KY 41 169. The space is currently unoccupied. The scope of work is detailed
in the contract documents. Scope includes modification to approximately 3200 SF of space
with the basement of the UK KDMC Health Park.