CCK-2546-21 Delta Gamma House – BP#1 – Early Demolition and Abatement

CCK-2546-21 Delta Gamma House – BP#1 – Early Demolition and Abatement

The scope of work shall include all work indicated in the Work Category Description EARLY
DEMOLITION & ABATEMENT, and Division 01 General Requirements and Division 02
Existing Conditions.

The following items represent specific inclusions in this Contract EARLY DEMOLITION &
ABATEMENT. They are provided as a guide to aid in the assignment of work and in no way
should be construed as being all inclusive. All work described or indicated in the respective
specification sections or divisions listed above, and on the drawings, shall be included,
unless specifically noted otherwise:

TRADE PACKAGE 1: EARLY DEMOLITION & ABATEMENT

1. This subcontractor is responsible for all layout/surveying associated with this work.
2. This subcontractor is responsible for all cleanup associated with this work.
3. This subcontractor is responsible for coordination with all other subs on this project
as it relates to this scope of work.
4. This subcontractor is responsible for all permits, fees, and inspections associated
with this work.
5. This subcontractor is responsible for providing as much dumpster yardage as
necessary for this work.
6. This subcontractor is responsible for providing and maintaining temporary toilets
and hand washing stations throughout the course of this work.
7. This subcontractor is responsible for providing any signage needed on the project.
8. This subcontractor is responsible for the final cleaning on the project upon the
completion of this work.
9. This subcontractor is responsible for the temporary fence and tree protection as
shown on the logistics plan for the duration of this work.
10. This subcontractor is responsible for all demo on the project.
11. This subcontractor is responsible for any temporary enclosures or safety barricades
needed throughout this work. This work will also include keeping window and door
openings enclosed throughout the duration of this work.
12. There is only one bid package. This subcontractor is responsible for all work
associated with the contract drawings and specifications, NO EXCEPTIONS.

Project Location: Lexington, Kentucky

More Details

LaGrange Utilities Commission Site Improvements

LaGrange Utilities Commission Site Improvements

The work to be bid upon is described as follows:

– Demolish and remove 1130 SY Asphalt Pavement.
– Demolish and Remove 470 SY Concrete Pavement.
– Install approximately 220 CY of Reinforced Concrete Pavement.
– Seed/Straw approximately 375 SY.
– Time allowed for completion of the Project is 20 consecutive calendar days.

Project Location: LaGrange, Kentucky

More Details

Hawthorne Ave Drainage Improvement Project

Hawthorne Ave Drainage Improvement Project

Sealed Bids addressed to the Louisville and Jefferson County Metropolitan Sewer District, 700 West Liberty Street, Louisville, Kentucky 40203 for the construction of the Hawthorne Ave Drainage Improvement ProjectContract No. 2021-023, Budget ID No. D20033, will be received at the office of MSD until 10:00 a.m., Local Time, June 3, 2021, and will be publicly opened and read at that place and time. The public may attend the bid opening via teleconference call.

Description and location of Project: Install a new drainage system along both sides of Hawthorne Ave from 2305 to 2309, in Metro Council District 8. All work shall be done in accordance to MSD’s Standard Specifications.

There will be no pre-bid meeting held for this project.

The Engineer’s Construction Cost Estimate for this project is between $ 150,000.00 and $200,000.00.

The bid documents will be available on, May 14, 2021, online at www.msdbids.com. The charge for each set of bid documents is outlined on the above-referenced web site.

Persons wishing to view the bid documents may do so online at www.msdbids.com or at the following locations: Builders Exchange of Louisville, Inc., 2300 Meadow Drive; Associated Builders & Contractors of Kentuckiana, 1810 Taylor Avenue; and F. W. Dodge, 1812 Taylor Avenue; all located in Louisville, Kentucky; and the Associated General Contractors of Kentucky, 2321 Fortune Drive, Suite 112, Lexington, Kentucky.

The Project Manager for this Invitation to Bid is Joseph S Exely. All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s Procurement Buyer Barry Pickett at Barry.Pickett@louisvillemsd.org.. Questions received less than two days prior to the date for opening of bids will not be answered. Only answers by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD’s Chief Engineer, David W. Johnson, P.E.

MSD SUPPLIER DIVERSITY MINORITY AND WOMAN BUSINESS ENTERPRISE PROGRAM POLICY AND PROCEDURES MANUAL (MBE/WBE PROGRAM) – FOR CONSTRUCTION CONTRACTS $150,000 AND GREATER for Minority Business Enterprise (MBE) and Woman Business Enterprise (WBE) subcontracting participation. Effective June 1, 2020, MSD has adopted and implemented the revised MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual, modifying the MBE and WBE participation goals on construction services and construction-related services, in accordance with the MSD Disparity Study (Study). The Study provided the factual predicate for MSD to establish new MBE and WBE goals in MSD contracting. The MSD MBE\WBE Program modified subcontracting goals are listed below:

If selected as applicable below, the Contractor must subcontract at least 18.0% of the total amount of the Contract Bid price to certified African American minority-owned businesses, at least 2.0% of the total amount of the Contract Bid price to a certified Asian-Indian American minority-owned businesses, and at least 15.0% total amount of the Contract Bid price to certified Caucasian Female businesses. If the Contractor is unable to meet the goals, they must demonstrate adequate “GOOD FAITH EFFORTS” in accordance with the MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program) – (see MSD MBE/WBE Program – Construction Subcontracting Goal Documents and Forms at http://louisvillemsd.org/SupplierDiversity/forms).

All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s Procurement Buyer, Barry Pickett at Barry.Pickett@louisvillemsd.org. Due to the current Coronavirus (COVID-19) pandemic measures, MSD will be hosting a Teleconference call in the place of a face-to-face public opening. MSD will also post the As-Read Bid Summary as soon as available. To take part in the Bid Opening Teleconference Call, please call 502-654-8113 and enter code 810369475#.

MSD SUPPLIER DIVERSITY PROGRAM: Applicable

The revised MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program) is effective June 1, 2020. If applicable, the goals are as follows:

18.0% MBE – African American, 2.0% MBE – Asian-Indian American and

15.0% WBE – Caucasian Female participation respectively required for this project.

MSD BID DISCOUNT: Applicable

This MSD construction project is bid and advertised as: check applicable below

Construction Services: X
Construction-related Services:

LOCAL LABOR COMMITMENT PREFERENCE: No

COMMUNITY BENEFITS PROGRAM: No

The contract will be awarded on the basis of the lowest, responsive, responsible bid, subject to the approval of the MSD Board. MSD reserves the right to reject any or all bids or waive any informality in any bid.

MBE and WBE businesses are encouraged to bid on this project as a prime contractor.

LOUISVILLE AND JEFFERSON COUNTY

METROPOLITAN SEWER DISTRICT

David Johnson, P.E.
Chief Engineer

Rene’ Lindsay, CPPO
One Water Chief Procurement Officer

Project Location: Louisville

More Details

21-76 / Yale Drive Area Water Main Replacement Project

21-76 / Yale Drive Area Water Main Replacement Project

Questions: Terri Young

Louisville Water Company is requesting Bids for the supply and install 6,170+/- linear feet of six (6)-inch Pressure Class 350 ductile iron water main (using traditional trench installation techniques) for sections of six (6) neighborhood streets located in central Jefferson County off Bardstown Road, inside Watterson Expressway. Also included with the project is the transfer, renewal, relocation or discontinue of 119 +/- customer services, Fire Hydrant removal and installation, cut and plugs, restoration on and along Project Limits.

Questions or inquiries relating to this project must be submitted in writing via email at least seven (7) calendar days prior to the bid opening date. All questions and inquiries must be sent to the Buyer, Terri Young, email at tyoung@lwcky.com.

The Company’s Project Manager’s estimate for the Contract plus Company supplied materials for this Project is $1,000,001 – $3,000,000. If the Company’s Project Manager’s estimate for the Contract plus Company supplied materials exceeds $250,000: a Bid Bond is required. For this Contract, a Bid Bond is required.

Bids will only be accepted from Bidders who have been pre-qualified by the Company in the pre-qualification category or categories that apply to this Bid. This Bid requires prequalification in the 4” – 16” Ductile Iron Water Mains Category. For information about pre-qualification, contact the Buyer listed above.

Bid Documents may be obtained from Lynn Imaging located at 11460 Bluegrass Pkwy, Louisville, KY 40299, (502) 499-8400 and
www.lwckyplanroom.com. One copy of the Bid Documents (includes technical specifications and a full set of plans) will be available at no charge (not including shipping/delivery charges) to Contractors that are prequalified with Louisville Water Company in the category(ies) specified for this bid. For details regarding the charges that apply to non-prequalified contractors, go to www.lwckyplanroom.com.

Click Here for the List of Prequalified Bidders

Project Location: Louisville, Kentucky

More Details

RFB-216-21 Parking Lot Lighting Upgrades

RFB-216-21 Parking Lot Lighting Upgrades

Estimate:
$219,829.00
Estimated Length of Project:
120 (Substantial Completion) + 30 (Final Completion)

This project consists of adding new light fixtures on existing poles at three parking areas. The parking areas includes the Cabinet for Human Resources (CHR) Parking Lot located at Cold Harbor Drive, the KY Public Service Parking Lot located at Sower Blvd, and The KY State Lab Parking Lot located at Sower Blvd. The parking lot will remain in use by the public and building staff throughout the project.

Project Location: Frankfort

More Details

Orange County, Indiana Highway Department – 2021 CCMG Street Paving Project

Orange County, Indiana Highway Department – 2021 CCMG Street Paving Project

The project consists of paving and pavement preventative maintenance work on various roads
throughout the County associated with their 2021 Community Crossings Matching Grant program and
award

Project Location: Paoli, Indiana

More Details

Oldham County Judicial Center – Phase 1 – Re-Bid

Oldham County Judicial Center – Phase 1 – Re-Bid

RE-BID BID PACKAGE 5 – STEEL

The Oldham County Judicial Center will receive sealed proposals for the following: The Oldham County Judicial
Center (Phase 1). In the manner and on the date hereinafter specified for the furnishing of all labor, materials,
supplies, tools, equipment, services, etc. necessary for the construction of the Oldham County Judicial Center in
LaGrange, Kentucky.

Project Location: LaGrange, Kentucky

More Details

London-Laurel County Economic Development Authority – Greer Industrial Park Build Ready Site Prep – Lot 5

London-Laurel County Economic Development Authority – Greer Industrial Park Build Ready Site Prep – Lot 5

The work consists of earthwork and access for a 75,000 a s.f. building pad at the Greer Industrial Park on Lot 5.

Project Location: London, Kentucky

More Details

CCK-2544-21 PAV WH Floors 1-3 Replace Trace on Hot Water System

CCK-2544-21 PAV WH Floors 1-3 Replace Trace on Hot Water System

This project will include the demolition of the existing heat trace system, and the
installation of a new heat trace system, on the existing domestic hot water piping that
is exposed on, and between, the 1st, 2nd and 3rd Floors of the Whitney Hendrickson
Cancer Facility for Women (Pavilion WH). This includes the replacement of the
existing insulation around the hot water piping and new electric power to the new
heat trace system controllers.

Project Location: Lexington, Kentucky

More Details

City of Shepherdsville – Arrowhead Pump Station Access Drive

City of Shepherdsville – Arrowhead Pump Station Access Drive

The Project includes the following Work:

Construction of paved access drive from Fincastle Way to the existing Arrowhead Pump Station.
Work also includes, culvert construction, site grading and drainage, erosion control and site
restoration.

Project Location: Shepherdsville, Kentucky

More Details

RFB-213-21 Big Sandy CTC Science Building Repairs

RFB-213-21 Big Sandy CTC Science Building Repairs

Estimate:
$208,500.00
Estimated Length of Project:
90 (Substantial Completion) + 30 (Final Completion)

Project is for the repair of damage to the science building caused by water. Repairs include gypsum wall board repairs; new LVT, broadloom carpet, carpet tile and VCT flooring and base; new acoustical wall covering; new paint; and new floor receptacles and associate electrical and CAT6 wiring. Additional work includes moving and storing existing loose fixtures, furnishing, and auditorium seating while work is being performed, then reinstalling. Existing equipment to be left in place is to be protected. Star projector is to have protective box built and placed around it to prevent any damage, debris or dust getting onto the projector during construction.

Project Location: Prestonsburg

More Details

21-33 / Smyrna Parkway Area Water Main

21-33 / Smyrna Parkway Area Water Main

Questions: Renee Fromme

Louisville Water Company is requesting Bids for the referenced project consists of the supply and installation of 2,360 +/- linear feet
of 6-inch DR-18 C900 PVC water main, 225 +/- linear feet of 6-inch Pressure Class 350 ductile iron water main, 2,100 +/- linear feet
of 8-inch DR-18 C900 PVC water main, and 305 +/- linear feet of 8-inch Pressure Class 350 ductile iron water main. Also included
with the project is the supply and installation of 5 fire hydrants, and the supply and transfer, renewal, relocation or discontinue of 96
+/- customer services. Contractor shall supply and install all materials required for the completion of this project.

Questions or inquiries relating to this project must be submitted in writing via email at least seven (7) calendar days prior to the bid opening date. All questions and inquiries must be sent to the Buyer, Renee Fromme, email at rfromme@lwcky.com .

The Company’s Project Manager’s estimate for the Contract plus Company supplied materials for this Project is $500,001.00 – $1,000,000.00. If the Company’s Project Manager’s estimate for the Contract plus Company supplied materials exceeds $250,000: a Bid Bond is required. For this Contract, a Bid Bond is required.

Bids will only be accepted from Bidders who have been pre-qualified by the Company in the pre-qualification category or categories that apply to this Bid. This Bid requires prequalification in all of the following prequalification categories: 4” – 16” PVC Water Mains. For information about pre-qualification, contact the Buyer listed above.

Award of the Contract will be based on base bid pricing and is at the Company’s sole discretion. Alternate bid(s) may or may not be awarded. The Company will award the Contract to the Bidder presenting a Bid that is responsive to the Specifications, is in substantial compliance with the Contract requirements, and presents the lowest and best price for performing the Work making up the base bid. The Company may accept the Bid that the Company determines is in the Company’s best interest, which may not necessarily be the least expensive Bid.

Bid Documents may be obtained from Lynn Imaging located at 11460 Bluegrass Pkwy, Louisville, KY 40299, (502) 499-8400 and www.lwckyplanroom.com. One copy of the Bid Documents (includes technical specifications and a full set of plans) will be available at no charge (not including shipping/delivery charges) to Contractors that are prequalified with Louisville Water Company in the category(ies) specified for this bid. For details regarding the charges that apply to non-prequalified contractors, go to www.lwckyplanroom.com.

Click Here for the List of Prequalified Bidders

Project Location: Louisville, Kentucky

More Details

21-30 / Garrs Lane Area Water Main Replacement Project

21-30 / Garrs Lane Area Water Main Replacement Project

Questions: Terri Young

Louisville Water Company is requesting Bids for supply and installation of 4,095 +/- linear feet of six (6)-inch DR-18 C900 PVC water main and 1,220 +/- linear feet of six (6)-inch Pressure Class 350 ductile iron water main. Also included with the project is the supply and installation of six (6) fire hydrants, and the supply and transfer, renewal, relocation or discontinue of 129 +/- customer
services. Contractor shall supply and install all materials required for the completion of this project.

Questions or inquiries relating to this project must be submitted in writing via email at least seven (7) calendar days prior to the bid opening date. All questions and inquiries must be sent to the Buyer, Terri Young, email at tyoung@lwcky.com.

The Company’s Project Manager’s estimate for the Contract plus Company supplied materials for this Project is $1,000,001 – $3,000,000. If the Company’s Project Manager’s estimate for the Contract plus Company supplied materials exceeds $250,000: a Bid Bond is required. For this Contract, a Bid Bond is required.

Bids will only be accepted from Bidders who have been pre-qualified by the Company in the pre-qualification category or categories that apply to this Bid. This Bid requires prequalification in the 4” – 16” PVC Water Mains Category. For information about prequalification, contact the Buyer listed above.

Bid Documents may be obtained from Lynn Imaging located at 11460 Bluegrass Pkwy, Louisville, KY 40299, (502) 499-8400 and www.lwckyplanroom.com. One copy of the Bid Documents (includes technical specifications and a full set of plans) will be available at no charge (not including shipping/delivery charges) to Contractors that are prequalified with Louisville Water Company in the category(ies) specified for this bid. For details regarding the charges that apply to non-prequalified contractors, go to www.lwckyplanroom.com.

Click Here for the List of Prequalified Bidders

Project Location: Louisville, Kentucky

More Details

RFB-212-21 ESH 2nd Floor Renovations

RFB-212-21 ESH 2nd Floor Renovations

Estimate:
$ 61,005.00
Estimated Length of Project:
120 (Substantial Completion) + 14 (Final Completion)

The needs have changed for the waiting room 2C29 at Eastern State Hospital, due to increased abuse to finishes. Existing paneling and drywall from all walls will be removed and replaced with plywood backing and high-impact gypsum board, then painted with epoxy paint. The sheet vinyl flooring will be replaced with a resinous flooring. The existing window and door sidelite will be replaced with monolithic safety glass that cannot be shattered or scratched. As indicated in detail below, electrical and mechanical fixtures will be upgraded to withstand abuse and prevent provision of objects that can be used for harm. With the addition of monolithic glass between the waiting area and staff areas, an intercom will be provided for communication to patients.

Project Location: Lexington

More Details

Madison County Utilities District – US 25 South Water Line Relocation

Madison County Utilities District – US 25 South Water Line Relocation

The work to be bid upon is described as follows:

US 25 Water Line Relocation

• Construction of approximately 5,000 LF of 8” PVC Water Main, 1,030 LF to 8” Ductile Iron w/ Nitrate Gasket, 50 LF of Steel Encasement Pipe by Open Cut, 330 LF of PVC Encasement Pipe by Open Cut,
550 LF of Steel Encasement Pipe by Jack & Bore, 380 LF of Free Bore, 30 LF of Creek Crossing, appurtenances and other necessary items.

Project Location: Richmond, Kentucky

More Details

LFCHD – Window Assessment with Replace/Repair and Building Wash and Seal

LFCHD – Window Assessment with Replace/Repair and Building Wash and Seal

The Lexington-Fayette County Health Department is accepting bids for a complete assessment of all windows
with replacement and/or repair along with complete building wash and sealant application at its 650 Newtown
Pike, Lexington, KY 40508 location.

Project Location: Lexington, Kentucky

More Details

City of Louisa – 2020 Water Treatment Plant Improvements

City of Louisa – 2020 Water Treatment Plant Improvements

Project consisting of
installation of an Owner purchased coarse screen filter unit with associated piping modifications,
upgrades to the SCADA (Supervisory Control and Data Acquisition) control system, and various
electrical upgrades.

Project Location: Louisa, Kentucky

More Details

Mt Sterling Water & Sewer – Howard’s Mill Road Phase II Water Line Replacement

Mt Sterling Water & Sewer – Howard’s Mill Road Phase II Water Line Replacement

Mt. Sterling Water and Sewer (MSWS) is accepting bids for labor, equipment, gravel, concrete
and blacktop related to a water line replacement project proposed for Howard’s Mill Road
Phase II Mt. Sterling, Kentucky. Please note materials for this project will be supplied by the
owner. This project consists of an estimated 3,940 feet of 8” class 350 ductile iron pipe,
reconnection of service lines, along with related accessories.

Project Location: Mt Sterling, Kentucky

More Details

Mt Sterling Water & Sewer – Antwerp Avenue and Pribble Park Sewer Line Replacement

Mt Sterling Water & Sewer – Antwerp Avenue and Pribble Park Sewer Line Replacement

Mt. Sterling Water and Sewer (MSWS) is accepting bids for labor, equipment, gravel, concrete and blacktop related to a sewer line replacement project proposed for Antwerp Avenue and Pribble Park, both located in Mt. Sterling, Kentucky. Please note materials for this project will be supplied by the owner. Plan sheets are available, Antwerp (720’) and Pribble Park (265’). In addition to the construction of the above footages of sanitary sewer pipe, installation of precast manholes and reconnection of existing sewer laterals are also included requirements of this project.

Project Location: Mt. Sterling, Kentucky

More Details

Calloway County Public Library – Main Street Demolition Project

Calloway County Public Library – Main Street Demolition Project

Work consists of, but is not limited to the following:

• Building Demolition and Grading
• Pavement Demolition
• Site Utilities disconnections and Demolition
• Site Improvement – Soil Preparation and Plantings
• All Hazardous Building Materials have been removed by Audas
Environmental.

Project Location: Murray, Kentucky

More Details

WKU-10285 / Garrett Conference Center Demolition

WKU-10285 / Garrett Conference Center Demolition

The project is to demolish and remove Garrett Conference Center located on the main campus of Western Kentucky University in its entirety including footers/foundations and existing underground utility piping. The building is of concrete frame construction originally built in 1951 consisting of 87,460 total gross square feet on four levels (one sub-grade with three elevated levels). The building does have a partially excavated crawl space.

Project Location: Bowling Green, Kentucky

More Details

CCK-2543-21 TP Cooper Classrooms 109, 113 & 212 Renovations

CCK-2543-21 TP Cooper Classrooms 109, 113 & 212 Renovations

This project upgrades the HVAC systems in classrooms 109, 113 and 212 of the Thomas Poe
Cooper Building. Existing window air conditioning units and steam radiators will be removed.
New ceiling cassette fan coil units will be installed in each of these classrooms. A new rooftop
condensing unit will also be installed.

Project Location: Lexington, Kentucky

More Details

North Mercer Water District – 2019 Water System Improvements – Contract 2C

North Mercer Water District – 2019 Water System Improvements – Contract 2C

The program of work for Contract 1 which bids are to be submitted consists of the replacement of
approximately 46,000 LF of existing 3”, 4” and 6” water main and replacement of existing service line. The
program of work for Contracts 2A, 2B and 2C consists of the replacement of approximately 26,500 LF,
19,000 LF, and 18,000 LF respectively, of 4”, 6” and 8” pipe. Also included in all three contracts is the
replacement of existing service line.

Project Location: Mercer County, Kentucky

More Details

North Mercer Water District – 2019 Water System Improvements – Contract 2B

North Mercer Water District – 2019 Water System Improvements – Contract 2B

The program of work for Contract 1 which bids are to be submitted consists of the replacement of
approximately 46,000 LF of existing 3”, 4” and 6” water main and replacement of existing service line. The
program of work for Contracts 2A, 2B and 2C consists of the replacement of approximately 26,500 LF,
19,000 LF, and 18,000 LF respectively, of 4”, 6” and 8” pipe. Also included in all three contracts is the
replacement of existing service line.

Project Location: Mercer County, Kentucky

More Details

North Mercer Water District – 2019 Water System Improvements – Contract 2A

North Mercer Water District – 2019 Water System Improvements – Contract 2A

The program of work for Contract 1 which bids are to be submitted consists of the replacement of
approximately 46,000 LF of existing 3”, 4” and 6” water main and replacement of existing service line. The
program of work for Contracts 2A, 2B and 2C consists of the replacement of approximately 26,500 LF,
19,000 LF, and 18,000 LF respectively, of 4”, 6” and 8” pipe. Also included in all three contracts is the
replacement of existing service line.

Project Location: Mercer County, Kentucky

More Details