RFB-209-25 EEC-AML-23066AMLBAML-BIL

RFB-209-25 EEC-AML-23066AMLBAML-BIL

Estimated Length of Project:
(Substantial Completion) + 90 Calendar Days (Final Completion)

The project area is 3.2 acres. A slide in front of a residence has threatened the home and risks sliding material into the road below. The project will consist of two phases.

Project Location: Pike County

More Details

City of Campbellsville – Miller Park Drive and Lebanon Avenue Waterline Replacements

City of Campbellsville – Miller Park Drive and Lebanon Avenue Waterline Replacements

The scope of work includes the installation of approximately 500 LF of 24-inch DI waterline,
4,975 LF of 18-inch DI waterline, 810 LF of 10-inch DI waterline, 45 LF of 8-inch DI waterline,
55 LF of 6-inch DI waterline, 253 LF of 2-inch PVC waterline, 180 LF of 36-inch steel casing
pipe, 32 LF of 16-inch steel casing pipe, 1 fire hydrant assembly, and related appurtenances.

Project Location: Campbellsville, Kentucky

More Details

Estill County Board of Education – Estill County Middle School Early Site Package

Estill County Board of Education – Estill County Middle School Early Site Package

This job consists of an early site package for the Estill County Board of Education – Estill County Middle School.

Project Location: Irvine, Kentucky

More Details

RFB-211-25 EEC-23035AMLBAML-BIL

RFB-211-25 EEC-23035AMLBAML-BIL

Estimated Length of Project:
(Substantial Completion) + 60 Calendar Days (Final Completion)

The site is characterized by drainage from a pre-law mine in the vicinity of the Goebel residence, which is currently flowing into the citizen’s basement. Additionally, areas around the bowling alley and park are also saturated. This project will seek to collect and divert that water away from the structures and toward natural streams in the area.

Project Location: Floyd County

More Details

25-0421 – ASSET DATA COLLECTION FOR STORMWATER ASSETS IN POND CREEK WATERSHED

25-0421 – ASSET DATA COLLECTION FOR STORMWATER ASSETS IN POND CREEK WATERSHED

Proposals will be received by the Louisville and Jefferson County Metropolitan Sewer District until 2:00 PM, local time, April 21, 2025. So as to avoid disclosure of the contents to competing teams, qualifications shall not be publicly opened. MSD is using a web-based portal for accepting and evaluating bid proposals digitally http://louisvillemsd.bonfirehub.com/portal for this Invitation to Bid. Documents may be uploaded at any time during the open period indicated for each proposal.






25-0421 – ASSET DATA COLLECTION FOR STORMWATER ASSETS IN POND CREEK WATERSHED





There will be a Mandatory pre-bid meeting held on 4/8/2025, at 1:00 PM via Teleconference call in place of a public face-to-face meeting. To take part in this conference call, please call 1-502-654-8113 and enter Conference ID: 123 545 23#. Attendance is required.



Microsoft Teams Meeting Link

https://teams.microsoft.com/l/meetup-join/19%3ameeting_MDdkMzExMzEtNTA4Zi00ODkzLWE1MzQtYzk3M2RkN2U5ZjY4%40thread.v2/0?co ntext=%7b%22Tid%22%3a%221d96fa6e-38c4-4eff-a0b0- 72c01218a89c%22%2c%22Oid%22%3a%2289f31444-77ba-4459-b345-8c70209dd9c9%22%7d

Proposal forms, including Specifications and Instructions for Bidders, may be obtained from MSD’s designated web portal at http://louisvillemsd.bonfirehub.com/portal





LOUISVILLE & JEFFERSON COUNTY

METROPOLITAN SEWER DISTRICT

RENE’ LINDSAY

ONE WATER CHIEF PROCUREMENT OFFICER

Project Location: Louisville, KY

More Details

City of Elizabethtown – Elizabethtown Police Station Renovation and New Building

City of Elizabethtown – Elizabethtown Police Station Renovation and New Building

Scope of Work consists of, but is not limited to the following:

• Sitework
o Site Demolition
o New Parking Lots (Curb & Gutter and Asphalt
o Sidewalks
o Site Utilities
o Fencing
• Selective Demolition
• Concrete Masonry Unit Construction
• Metal Framing
• Drywall
• Hollow metal doors & frames
• Metal Roofing
• Glazing
• Casework
• Finishes
• Electrical
• HVAC & Controls
• Plumbing

Project Location: Elizabethtown, Kentucky

More Details

CCK-2874.00-2-25 Construct Support Services Building – New Environmental Quality Management Center

CCK-2874.00-2-25 Construct Support Services Building – New Environmental Quality Management Center

Project comprises of a new facility for the UK Environment Quality Management Center located
at 901 Journal Avenue, Lexington, KY. Sitework, utilities, reinforcing steel supply, electrical
gear supply, generator supply, are some of the items pertaining to this bid package for this project.

Project Location: Lexington, Kentucky

More Details

Georgetown Municipal Water and Sewer Service – Wastewater Treatment Plant #2 – Tertiary Filter Upgrades & Mechanical Bar Screen Replacement

Georgetown Municipal Water and Sewer Service – Wastewater Treatment Plant #2 – Tertiary Filter Upgrades & Mechanical Bar Screen Replacement

The Wastewater Treatment Plant #2 Tertiary Filter Upgrade
& Mechanical Bar Screen Replacement will consist of installing a new cloth media filtration
system to replace the existing sand filtration system, replacing the existing mechanical bar screen,
and screenings compactor, and all related appurtenances as shown on the DRAWINGS and
described in the SPECIFICATIONS.

Project Location: Georgetown, Kentucky

More Details

Park Hill Trap Catch Basin Replacement & Tree Box Installation – Phase 1

Park Hill Trap Catch Basin Replacement & Tree Box Installation – Phase 1

INVITATION TO BID

Sealed Bids will be received electronically by Louisville and Jefferson County Metropolitan Sewer District, for the construction of the Park Hill Trap Catch Basin Replacement & Tree Box Installation – Phase 1, Contract No. 2025-021, Budget ID No. H25276, Drawing Record No. / Sheet No. , until 10:00 a.m., Local Time, Thursday, April 10, 2025, and will be publicly opened and read at that time. The public may attend the bid opening via teleconference call at 502-654-8113 (Dial-in Number) Conference ID: 541 154 029#.

MSD is using a web-based portal for accepting and evaluating bid proposals digitally at http://louisvillemsd.bonfirehub.com/portal for this Invitation to Bid. Documents may be uploaded at any time during the open period indicated for each proposal.

Description and location of Project: Existing Trap Catch Basin Replacements and tree box installations within the Park Hill Neighborhood. All work shall be done in accordance to MSD’s Standard Specifications.

There will be no pre-bid meeting held for this project.

The Engineer’s Construction Cost Estimate for this project is between $400,000.00 and $500,000.00.

Proposal forms, including Specifications and Instructions for Bidders, may be obtained from MSD’s designated web portal at http://louisvillemsd.bonfirehub.com/portal.

Persons wishing to view the bid documents may do so online at http://louisvillemsd.bonfirehub.com/portal or at the following locations: Builders Exchange of Louisville, Inc., 2300 Meadow Drive; Associated Builders & Contractors of Kentuckiana, 1810 Taylor Avenue; and F. W. Dodge, 1812 Taylor Avenue; all located in Louisville, Kentucky; and the Associated General Contractors of Kentucky, 2321 Fortune Drive, Suite 112, Lexington, Kentucky.

The Project Manager for this Invitation to Bid is Joseph Exely. All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s designated web portal at http://louisvillemsd.bonfirehub.com/portal. Questions received less than two days prior to the date for opening of bids may not be answered. Only answers by formal written Addenda posted on MSD’s designated web portal will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD’s Chief Engineer, David W. Johnson, P.E.

MSD SUPPLIER DIVERSITY MINORITY AND WOMAN BUSINESS ENTERPRISE PROGRAM POLICY AND PROCEDURES MANUAL (MBE/WBE PROGRAM) – FOR CONSTRUCTION CONTRACTS $200,000 AND GREATER for Minority Business Enterprise (MBE) and Woman Business Enterprise (WBE) subcontracting participation. Effective June 1, 2020, MSD has adopted and implemented the revised MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual, modifying the MBE and WBE participation goals on construction services and construction-related services, in accordance with the MSD Disparity Study (Study). The Study provided the factual predicate for MSD to establish new MBE and WBE goals in MSD contracting. The MSD MBE\WBE Program modified subcontracting goals are listed below:

If selected as applicable below, the Contractor must subcontract at least 18.0% of the total amount of the Contract Bid price to certified African American minority-owned businesses, at least 2.0% of the total amount of the Contract Bid price to a certified Asian-Indian American minority-owned businesses, and at least 15.0% total amount of the Contract Bid price to certified Caucasian Female businesses. If the Contractor is unable to meet the goals, they must demonstrate adequate “GOOD FAITH EFFORTS” in accordance with the MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program) – (see MSD MBE/WBE Program – Construction Subcontracting Goal Documents and Forms at http://louisvillemsd.org/SupplierDiversity/forms.

All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s designated web portal at http://louisvillemsd.bonfirehub.com/portal.

MSD SUPPLIER DIVERSITY PROGRAM: Not Applicable

The MSE/WBE Program is effective June 1, 2020. If selected as applicable above, the goals are as follows:

18.0% MBE – African American, 2.0% MBE – Asian-Indian American and

15.0% WBE – Caucasian Female participation respectively required for this project.

MBE and WBE businesses are encouraged to bid on this project as a prime contractor.

MSD BID DISCOUNT: Applicable

This MSD construction project is bid and advertised as: check applicable below

Construction Services: X
Construction-related Services:

LOCAL LABOR COMMITMENT PREFERENCE: No

COMMUNITY BENEFITS PROGRAM: No

The contract will be awarded on the basis of the lowest, responsive, responsible bid, subject to the approval of the MSD Board. MSD reserves the right to reject any or all bids or waive any informality in any bid.

LOUISVILLE AND JEFFERSON COUNTY

METROPOLITAN SEWER DISTRICT

David Johnson, P.E.
Chief Engineer

Rene’ Lindsay, CPPO
One Water Chief Procurement Officer

Project Location: Louisville, KY

More Details

FSS – State Capitol Renovation BP09 Structural Demo and Modifications, Roofing

FSS – State Capitol Renovation BP09 Structural Demo and Modifications, Roofing

The Kentucky State Capitol Renovation – Bid Package 09 – Structural Demo and Modifications,
Roofing represents a portion of the overall building renovation scope. Bid Package 09 incorporates
selective structural demolition on Floor 4, masonry and concrete restoration (existing structure), new
structural steel framing (Floor 4 and the roof), new roofing (including sheet metal flashings, gutters
and down spouts), and new glazed skylights above the legislative chambers and the Great Hall.

Project Location: Frankfort, Kentucky

More Details

RFB-192-25 Parks – CO Multi-Park Structural Investigation West- Lake Cumberland

RFB-192-25 Parks – CO Multi-Park Structural Investigation West- Lake Cumberland

Estimate:
$1,253,382.00

Estimated Length of Project:
180 (Substantial Completion) + 30 (Final Completion)

The project consists of structural repairs to interior and exterior elements at the Lodge and guestroom buildings at Lake Cumberland State Resort Park. Exterior repairs generally consist of spalled concrete at the end of balcony double-tee members and cracking and spalling on concrete walls. A retaining wall is to be constructed on the southeast corner of the main lodge to address soil erosion conditions and drainage on the east side of the main lodge is to be redirected to the existing natural drainage channel to the south that leads down the slope to the lake. A portion of concrete slab will be removed and replaced at the northeast corner of the conference center building due to settlement of the existing slab. Interior repairs are limited to the crawlspace beneath the main lodge and consist of underpinning of several foundation elements which have been undermined due to soil erosion as well as repair and/or reinforcement of existing cast-in-place and precast first-floor framing members. The project also includes removal and replacement of retaining wall, concrete slab, and steel railing at cottage 510, as well as removal and replacement of concrete walkways at cabins 528, 529, and 530.

Project Location: Jamestown

More Details

CCK-2844.00-1-25 Princeton Greenhouse – Headhouse

CCK-2844.00-1-25 Princeton Greenhouse – Headhouse

Work of the Project includes Building and Site Work for the construction of a new 4,366
GSF Greenhouse and 920 GSF headhouse to support the University of Kentucky College
of Agriculture, Food and Environment. There is an alternate to expand the headhouse by
801 GSF for a total of 1,721 GSF. Included in the scope of the work is site work and
limited concrete work for the site. The project is constructed of wood framing with and
metal paneling. This facility will be supported by concrete stem walls and footers with
slabs on grade. Roofing systems will be metal paneling.

Project Location: Lexington, Kentucky

More Details

RFB-204-25 KSP-KEWS New Towers – W2 (Barren River/Dale Hollow)

RFB-204-25 KSP-KEWS New Towers – W2 (Barren River/Dale Hollow)

Estimate:
$946,405.00

Estimated Length of Project:
180 (Substantial Completion) + 30 (Final Completion)

The Kentucky State Police is proposing to erect two (2) new communications towers. The site names are 0312 Barren River and 1505 Dale Hollow. The new structures will be 250’ tall latticed steel self-supporting towers designed to accommodate future 50’ extensions. All new tower sites will require a new equipment shelter, generator, and propane tank.
This project involves installing structural foundations, erecting towers, installing all necessary site components, and completing all exterior improvements per the project drawings. The new tower steel and hardware, equipment shelters, generators, and automatic transfer switches (ATS) will be provided by the Kentucky State Police. The contractor is responsible for the transportation and delivery of all site components to the project locations. The contractor is responsible for the coordination of delivery and receipt of the new tower steel and hardware from the tower manufacturer.

Project Location: Various

More Details

RFB-208-25 KDVA- KVCW – Roof Replacement

RFB-208-25 KDVA- KVCW – Roof Replacement

Estimate:
$110,000.00

Estimated Length of Project:
75 (Substantial Completion) + 30 (Final Completion)

The Work of Project is defined by the Contract Documents and consists of demolition and replacement of existing shingle roofing on the administration and maintenance buildings.

Project Location: Hopkinsville

More Details

City of Hazard – Hazard Sanitary Trunk Phase 1

City of Hazard – Hazard Sanitary Trunk Phase 1

The work will be divided into two portions, the first for
investigation, discovery and project definition, the second for actual construction. The project will investigate and
then rehabilitate approximately 6,350’ of 30” sanitary sewer trunk and related appurtenances.

Project Location: Hazard, Kentucky

More Details

RFB-207-25 New Boilers & Controls KET MEP Upgrades

RFB-207-25 New Boilers & Controls KET MEP Upgrades

Estimate:
$315,240.00

Estimated Length of Project:
120 (Substantial Completion) + 30 (Final Completion)

Two existing boilers will be replaced with new condensing natural gas boilers as well as the four circulation pumps. In addition, emergency stops, flow switches, acid neutralization tank, condensate piping, chemical pot feeder tank, cold water makeup system, natural gas connections and pressure gauges will be replaced at the KET building, located at 600 Cooper Drive, Lexington, KY.
The new Boiler System will be installed per Kentucky Boiler Code as well as the Kentucky Building Code with Current Revisions, including the International Mechanical Code and the National Electrical Code. The Owner’s required work schedule will require to replace the boilers with a minimal amount of downtime to the hot water loop requiring after hours weekend construction activity.

Project Location: Lexington

More Details

RFB-202-25 Re-Ad of RFB-38-25 Nursing Facility Renovations Western State Hospital Cabinet for Health and Family Services

RFB-202-25 Re-Ad of RFB-38-25 Nursing Facility Renovations Western State Hospital Cabinet for Health and Family Services

Estimate:
$4,751,500.00

Estimated Length of Project:
320 (Substantial Completion) + 30 (Final Completion)

This project will generally consist of improvements to the existing HVAC systems for Building 30 and 31 within the Nursing Facility. Work includes excavation and asphalt repairs, removal and replacement of existing ceiling systems, modifications to the existing sprinkler system, removal of existing two-pipe HVAC systems, removal of exhaust systems, installation of four-pipe fan coils, installation of outside air systems, installation of exhaust air systems, installation of hot water and chilled water piping systems. removal of power connections to mechanical systems noted, installation of new power panels, and power connections to new equipment. There will be an alternate for these improvements to Building 32. Trades involved shall include but are not limited to: demolition, concrete, drywall, painting, ceilings, fire protection, mechanical, ductwork, electrical, and fire alarm

Project Location: Hopkinsville

More Details

RFB-203-25 EDU – KSD Jacobs Hall Window Project

RFB-203-25 EDU – KSD Jacobs Hall Window Project

Estimate:
$370,000.00

Estimated Length of Project:
120 (Substantial Completion) + 30 (Final Completion)

This project consists of the removal of existing windows (72) on the 1st, 2nd, 3rd & 4th floors of the building and the installation of replacement windows. New pre-finished metal cladding is to be applied to the existing exterior window trim.

Project Location: Danville

More Details

Belmar Basin Green Retrofit

Belmar Basin Green Retrofit

INVITATION TO BID

Sealed Bids will be received electronically by Louisville and Jefferson County Metropolitan Sewer District, for the construction of Belmar Basin Green Retrofit, Contract No. 25-0410, Budget ID No. H25058, Drawing Record No. / Sheet No. , until April 10th, 2025, Local Time, 10:00 am, and will be publicly opened and read at that time. The public may attend the bid opening via teleconference call at 502-654-8113 (Dial-in Number) Conference ID: 341 510 147#.

MSD is using a web-based portal for accepting and evaluating bid proposals digitally at http://louisvillemsd.bonfirehub.com/portal for this Invitation to Bid. Documents may be uploaded at any time during the open period indicated for each proposal.

Description and location of Project: The scope of work will include, but is not limited to, all labor, equipment, tools and services required for enhancing the stability of the Belmar Basin channel by replacing the existing vegetation with native soils provided on plans. The work will involve but not limited to: Clearing existing vegetation; Removal of concrete sections; Reseeding with native grasses.

There will be a non-mandatory pre-bid meeting held for this project. The meeting will take place at 1573 Belmar Dr., Louisville, Kentucky 40213, on Friday, March 28th, 2025, Local Time, 2:00 pm.

The Engineer’s Construction Cost Estimate for this project is between $45,000.00 and $65,000.00.

Proposal forms, including Specifications and Instructions for Bidders, may be obtained from MSD’s designated web portal at http://louisvillemsd.bonfirehub.com/portal.

Persons wishing to view the bid documents may do so online at http://louisvillemsd.bonfirehub.com/portal or at the following locations: Builders Exchange of Louisville, Inc., 2300 Meadow Drive; Associated Builders & Contractors of Kentuckiana, 1810 Taylor Avenue; and F. W. Dodge, 1812 Taylor Avenue; all located in Louisville, Kentucky; and the Associated General Contractors of Kentucky, 2321 Fortune Drive, Suite 112, Lexington, Kentucky.

The Project Manager for this Invitation to Bid is Venkata Gullapalli. All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s designated web portal at http://louisvillemsd.bonfirehub.com/portal. Questions received less than four days prior to the date for opening of bids may not be answered. Only answers by formal written Addenda posted on MSD’s designated web portal will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD’s Chief Engineer, David W. Johnson, P.E.

MSD SUPPLIER DIVERSITY MINORITY AND WOMAN BUSINESS ENTERPRISE PROGRAM POLICY AND PROCEDURES MANUAL (MBE/WBE PROGRAM) – FOR CONSTRUCTION CONTRACTS $150,000 AND GREATER for Minority Business Enterprise (MBE) and Woman Business Enterprise (WBE) subcontracting participation. Effective June 1, 2020, MSD has adopted and implemented the revised MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual, modifying the MBE and WBE participation goals on construction services and construction-related services, in accordance with the MSD Disparity Study (Study). The Study provided the factual predicate for MSD to establish new MBE and WBE goals in MSD contracting. The MSD MBE\WBE Program modified subcontracting goals are listed below:

If selected as applicable below, the Contractor must subcontract at least 2.0% of the total amount of the Contract Bid price to certified African American minority-owned businesses, at least 0.0% of the total amount of the Contract Bid price to a certified Asian-Indian American minority-owned businesses, and at least 12.0% total amount of the Contract Bid price to certified Caucasian Female businesses. If the Contractor is unable to meet the goals, they must demonstrate adequate “GOOD FAITH EFFORTS” in accordance with the MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program) – (see MSD MBE/WBE Program – Construction Subcontracting Goal Documents and Forms at http://louisvillemsd.org/SupplierDiversity/forms.

All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s designated web portal at http://louisvillemsd.bonfirehub.com/portal.

MSD SUPPLIER DIVERSITY PROGRAM: Not Applicable

The MSE/WBE Program is effective June 1, 2020. If selected as applicable above, the goals are as follows:

2.0% MBE – African American, 0.0% MBE – Asian-Indian American and

12.0% WBE – Caucasian Female participation respectively required for this project.

MBE and WBE businesses are encouraged to bid on this project as a prime contractor.

MSD BID DISCOUNT: Applicable

This MSD construction project is bid and advertised as: check applicable below

Construction Services: x
Construction-related Services:

LOCAL LABOR COMMITMENT PREFERENCE: No

COMMUNITY BENEFITS PROGRAM: No

The contract will be awarded on the basis of the lowest, responsive, responsible bid, subject to the approval of the MSD Board. MSD reserves the right to reject any or all bids or waive any informality in any bid.

LOUISVILLE AND JEFFERSON COUNTY

METROPOLITAN SEWER DISTRICT

David Johnson, P.E.
Chief Engineer

Rene’ Lindsay, CPPO
One Water Chief Procurement Officer

Project Location: Louisville, KY

More Details

RFB-205-25 DOC – Upgrade Green River Correctional Complex Full Electrical System

RFB-205-25 DOC – Upgrade Green River Correctional Complex Full Electrical System

Estimate:
$3,640,000.00

Estimated Length of Project:
360 (Substantial Completion) + 30 (Final Completion)

The Project involves replacement of the campus wide fire alarm system monitoring the Green River Correctional Complex. Work of the Project will be performed in all buildings or structures located inside and outside the security boundary of the GRCC. The existing fire alarm initiating and alarm devices, control panels, circuits and associated components shall be removed. The replacement addressable fire alarm system shall consist of initiating and control devices, control panels, software, circuits, and all associated components for a complete campus wide fire alarm system. In addition, the project includes the construction of an underground fiber-optic circuit that will loop the complex and interconnect the building fire alarm systems. All work must be performed in a sequenced effort coordinated with the GRCC. The Contract Documents include a suggested construction phasing schedule. However, it is the responsibility of the Contractor to prepare and submit a schedule of work.

Project Location: Central City

More Details

Edmonson County Board of Education – South Edmonson Elementary Addition & Renovation

Edmonson County Board of Education – South Edmonson Elementary Addition & Renovation

This project consists of an addition and renovation to the South Edmonson Elementary for the Edmonson County Board of Education.

Project Location: Brownsville, Kentucky

More Details

RFB-206-25 DMA – BNGC Facilities Bldg 162 HVAC

RFB-206-25 DMA – BNGC Facilities Bldg 162 HVAC

Estimate:
$169,626.00

Estimated Length of Project:
60 (Substantial Completion) + 30 (Final Completion)

The project involves replacing five air handling units. Three DX split-system air handlers with inline natural gas duct furnaces will be replaced with like systems. One DX split-system air handler with an inline natural gas duct furnace will be replaced with a condensing furnace and evaporator coil. One condensing furnace with evaporator coil will be replaced with a like system. All new equipment will integrate with the existing Automated Logic controllers.

Project Location: Frankfort

More Details

RFB-199-25 KCTCS – Roof Replacement Industrial Ed. Bldg. – Hazard CTC

RFB-199-25 KCTCS – Roof Replacement Industrial Ed. Bldg. – Hazard CTC

Estimate: $640,000.00

Estimated Length of Project: 120 (Substantial Completion) + 30 (Final Completion)

The project includes replacement of existing roofing on the Industrial Education Building on the Vo-Tech campus of Hazard Community and Technical College. Roofing material to be covered with a new modified bitumen roof system on a wood-fiber cover over the existing roof membrane. Roof edge fascias and other edge metal, scupper boxes, downspouts and flashings to be replaced.

Project Location: Hazard

More Details

Frankfort Sewer Department – PC3 Casing Pipe Entrance

Frankfort Sewer Department – PC3 Casing Pipe Entrance

The Project consists of constructing two steel casing pipes (36” & 42” diameter) under Minuteman Parkway in Frankfort KY.

Project Location: Frankfort, Kentucky

More Details

Franklin County Schools – Elkhorn Elementary School

Franklin County Schools – Elkhorn Elementary School

This project consists of a one-story new Elementary School with a community storm
shelter for the occupants of the building. The design capacity is for 700 students and
100 staff, the overall gross square footage is approximately 97,820sf.

Project Address: 275 Lions Way, Frankfort, KY 40601

Project Location: Frankfort, Kentucky

More Details