RFB-68-22 Niki Stanley Slide HP AMLRP

RFB-68-22 Niki Stanley Slide HP AMLRP

Estimated Length of Project:
(Substantial Completion) + 120 (Final Completion)

The Niki Stanley Slide AMLRP will result in the disturbance of up to 3.3 acres, and
includes the complete excavation of a landslide threatening the turn-around and parking area at the head of the access drive for the Stanley residence, and the repair of a gabion ditch installed along the toe of the current landslide under a previous AML reclamation project (Boldman Slide AMLRP) that affected the site. Earthen material excavated from the landslide will be taken to fill areas along stable portions of a nearby abandoned mine bench. After the damaged portion of the gabion ditch is removed, a low-water crossing will be installed to allow the headwater of
Hunts Branch to be crossed in order to access the lower portion of the slide. Plans are for an excavated rock ditch to carry drainage down the slope formerly occupied by the slide to a new gabion ditch spur, which will then carry it to the reconstructed gabion ditch. Earthen material excavated from the project site will be transported to a nearby permitted Title V underground mine site, where it will be stockpiled for future use in reclaiming that site. The entire project area has been subjected to disturbances such as landslide activity, residential construction, road construction coal mining, and previous reclamation projects. Forested habitat may need to be disturbed in order to allow access to the upper portions of the landslide area. Other than the installation and removal of a temporary low-water crossing in a constructed drainway composed of a gabion ditch, direct disturbance of streams will not occur.
There will be no disturbance of any caves or cave-like habitats, specifically including
underground mine openings or workings. The off-road access, landslide area, and fill areas will be revegetated by means of the standard AML Reclamation Seed Mixture. Hydromulching and hydroseeding may be utilized within the area of the excavated landslide. The standard AML Residential Seed Mixture will be utilized in any areas of residential lawn that are disturbed.

Project Location: Pike

More Details

City of Bardstown – Woodlawn Trunk Sewer

City of Bardstown – Woodlawn Trunk Sewer

Project consists of construction of approximately 4442 linear feet of 12” gravity sewer main and 71 linear feet of 8” gravity sewer main, along with dismantle of two existing pump stations in the City of Bardstown.

Project Location: Bardstown, Kentucky

More Details

Housing Authority of Frankfort – Phase A: Maintenance Building Renovations

Housing Authority of Frankfort – Phase A: Maintenance Building Renovations

The project consists of:
    Phase A: Maintenance Building Renovations

Project Location: Frankfort, Kentucky

More Details

Franklin County Fiscal Court – Simon House First Floor Fit-up BP2

Franklin County Fiscal Court – Simon House First Floor Fit-up BP2

The Franklin County Fiscal Court is requesting sealed bids for the first floor fit-up of the former
Health Department building. Bids shall include any and all costs for items including but not limited to
permits, materials, special equipment and shall be itemized on the List of Unit Prices provided in the
bid form.

Project Location: Frankfort, Kentucky

More Details

RFB-64-22 Capitol Annex Domestic Water Heater Replacement

RFB-64-22 Capitol Annex Domestic Water Heater Replacement

Estimate:
$187,271.00
Estimated Length of Project:
120 (Substantial Completion) + 30 (Final Completion)

Replace the existing gas domestic water heater that is no longer working with a new electric water heater (similar to the existing) and modify piping to accommodate the new heater.

Project Location: Frankfort

More Details

CCK-2584-22 Cooling Plant #1 Tower Replacement – Phase III – 2497.2

CCK-2584-22 Cooling Plant #1 Tower Replacement – Phase III – 2497.2

Demolish all the remaining old cooling towers, modify all the remaining structural steel,
sand blast and paint all the of the remaining existing unpainted steel and new steel installed,
install new frp grating and handrails, coordinate installation with owner supplied cooling tower
and pipe and wire new tower when installation of tower is complete.

Project Location: Lexington, Kentucky

More Details

Lee County Schools – Middle-High School HVAC Upgrades in Main & Auxilliary Gyms

Lee County Schools – Middle-High School HVAC Upgrades in Main & Auxilliary Gyms

The work includes the provision and installation of two new HVAC units, controls, duct work, hydronic
piping, power, fire alarm, and associated demolition work to upgrade the HVAC systems in the main and
auxiliary gymnasiums. The scope of work for this construction project includes but is not limited to:
selective building demolition, duct installation, hydronic piping, insulation, HVAC controls, power, fire
alarm, and miscellaneous structural supports. The work effort will be executed in one principal phase
beginning on or around December 1, 2021 and ending on May 2, 2021 (for Final Completion). The
building will be occupied during construction work. The Contractor will be required to coordinate the
contract work with daily school activities in the building and on the site.

Project Location: Beattyville, Kentucky

More Details

Glasgow Independent Schools – New South Green Elementary School

Glasgow Independent Schools – New South Green Elementary School

The Glasgow Independent Schools Board of Education will receive sealed bids for the bid package listed for the
SOUTH GREEN ELEMENTARY.

Project Location: Glasgow, Kentucky

More Details

CITB-147-2022 Weaver Radiant Heater Replacement

CITB-147-2022 Weaver Radiant Heater Replacement

This invitation is for replacement of the radiant heaters in the Weaver Gym as specified in the following event at Eastern
Kentucky University’s Richmond, KY Campus. The work includes furnishing all labor, materials, equipment and services
necessary for the complete project.

Project Location: Richmond, Kentucky

More Details

LFUCG – Kearney Ridge and Beaumont Woods Detention Basin Improvements

LFUCG – Kearney Ridge and Beaumont Woods Detention Basin Improvements

The project includes providing all construction supervision, labor, materials, tools, test
equipment necessary for the Kearney Ridge and Beaumont Woods Detention Basin Improvements.

Project Location: Lexington, Kentucky

More Details

Spencer County Fiscal Court – Ray Jewell Memorial Park

Spencer County Fiscal Court – Ray Jewell Memorial Park

Project consists of the construction of a sports lighting system for Field 1 and memorial area at Ray Jewell Memorial Park.

Project Location: Taylorsville, Kentucky

More Details

Cawood Ledford Boys and Girls Club – New Gymnasium

Cawood Ledford Boys and Girls Club – New Gymnasium

The bid is to furnish all necessary
labor, materials, tools, machinery, warranties, and all other items required to construct a new Gymnasium Facility on existing vacant lot

Project Location: Harlan, Kentucky

More Details

CCK-2576-22 Construction of the Still & Maturation Buildings – 2526.0/2536.0

CCK-2576-22 Construction of the Still & Maturation Buildings – 2526.0/2536.0

Still Building:

Project is approximately 7,000 SF, mixed-use building including a full functioning distillery and
collegiate support spaces. Primary structure is steel framing and soil-bearing footings.
Exterior assemblies include continuous insulation, anchored stone veneer, metal panel,
storefront, curtain-wall, and coated foam roofing, and other work indicated in the Contract
Documents.

Maturation Building:

The new facility will complement the Still Building and provide an area for the sprits to age
and for research. It will consist of approximately 1,000-1,500 square feet of space with limited
HVAC requirements. It will be sited and coordinated with the Still Building.

Project Location: Lexington, Kentucky

More Details

Town of Clarksville – Pump Station 9 Influent Gravity Replacement & Beckett St Sewer Extension

Town of Clarksville – Pump Station 9 Influent Gravity Replacement & Beckett St Sewer Extension

This project involves the following:
– Approximately 316 LF of 12” Sanitary Sewer Lines and 3 associated manhole structures along Homestead Avenue and Norwood Avenue.

– Approximately 299 LF of 8” Sanitary Sewers Lines and 1 associated manhole along Bowling Avenue.

– Cleaning and abandoning of approximately 564 LF of gravity sanitary sewer.

– Regrading of approximately 330 LF of ditch and installation of approximately 248 LF of 1-foot wide concrete “V” ditch.

– Approximately 121 LF of 8” Sanitary Sewers Lines and 3 associated manhole in the alley
near Beckett Street.

Project Location: Clarksville, Indiana

More Details

Elizabethtown Independent Schools – Elizabethtown High School Restroom Renovation

Elizabethtown Independent Schools – Elizabethtown High School Restroom Renovation

The project scope includes the renovation of student and staff restrooms in the
High School. All fixtures and toilet partitions are being replaced. Demolition and new construction of
walls and slabs are included related to plumbing work. Finishes are being replaced in each location.
Sanitary line replacement is required in two locations..

Project Location: Elizabethtown, Kentucky

More Details

CCK-2583-22 PAV H Elevator 8C Modernization

CCK-2583-22 PAV H Elevator 8C Modernization

This project is to modernize Elevator 8C in Pavilion H on the UK Medical Center Campus.
The work will include replacement of existing control systems, car and lights, door operator, traveling cable and hoist way wiring.

Project Location: Lexington, Kentucky

More Details

21-18 / Crescent Hill Pump Station Discharge System Improvements

21-18 / Crescent Hill Pump Station Discharge System Improvements

This project has been CANCELLED, Please refer to Add #6

Questions: Renee Fromme

Louisville Water Company is requesting proposals for the systematic dismantling and replacement of existing 48”, 60” and 78” discharge headers including valves and connecting piping with new 78” discharge headers and associated valves and connecting piping. Includes electric and controls. Includes buried PCCP yard piping. Includes interior building modifications such as supports, handrails, floors, gratings and coatings. Includes lead based paint abatement. Includes carbon fiber interior pipe wrap/lining. Includes miscellaneous plumbing, piping, small hydro-pneumatic system replacement, and accessories and appurtenances.

A pre-bid/proposal meeting to discuss the Project and to tour the work site will be held on October 13, 2021 at 9:00 a.m. EST/EDT. At the Louisville Water Company Crescent Hill Filter Plant – Training Center, Louisville, KY. (Check-in with Guard; requires ID, PPE of high-vis vest, hardhat, safety glasses, safety shoes, ear plugs, and Covid mask). Attendance at this meeting is mandatory.

Questions or inquiries relating to this RFP/Bid must be submitted through the Louisville Water Company web-based portal for this RFP/Bid by the date and time indicated on the web portal for this RFP.

The Company’s Project Manager’s estimate for the Contract plus Company supplied materials for this Project is $10,000,001 –
$25,000,000. If the Company’s Project Manager’s estimate for the Contract plus Company supplied materials exceeds $250,000 a Bid Bond is required. For this Contract, a Bid Bond of $45,000.00 is required.

Proposals will only be accepted from Prime Proposers who have been pre-qualified by the Company in the pre-qualification category or categories that apply to this RFP and shall have a prequalification bid limit of at least $14,000,000. This RFP requires Prime to be prequalification in the Heavy Construction – Plant Work Category or 16”-60” Steel Water Mains. Contractors/Subcontractors performing specialty items of work such as electrical work must be prequalified in the Electrical Category, field coating/painting work must be prequalified in the Painting or Water Tank Coating Category, water main installation must be prequalified in the 24”-60” Prestressed Concrete Water Mains Category, and carbon fiber wrap lining on interior mains must be prequalified in 24”-60” Pipeline Carbon Fiber Wrap Lining Category. For information about pre-qualification, contact the Buyer listed above.

Sealed Proposals for the material or service specified above shall be accepted by Louisville Water Company until 11:00 a.m. Eastern Time on the RFP Submittal Due Date cited above. Louisville Water Company is using a web-based portal for accepting and evaluating bid proposals digitally https://louisvillewater.bonfirehub.com/portal for this Request for Proposal (RFP). Documents may be uploaded at any time during the open period indicated for each RFP. Specifications are on file and may be obtained from the Louisville Water Company designated web portal at https://louisvillewater.bonfirehub.com/portal. Proposals may not be submitted by other means.

RFP/Bid Documents may be obtained from Lynn Imaging located at 11460 Bluegrass Pkwy, Louisville, KY 40299, (502) 499-8400 and www.lwckyplanroom.com. One copy of the RFP/Bid Documents (includes technical specifications and a full set of plans) will be available at no charge (not including shipping/delivery charges) to Prime Contractors that are prequalified with Louisville Water in the category(ies) specified for this bid with a bid limit of at least $14,000,000. Contractors that are not prequalified may purchase the RFP/Bid Documents for $150.00 (not including shipping/delivery charges and sales tax).

Click Here for the List of Prequalified Bidders

Project Location: Louisville, Kentucky

More Details

WKU-10298 Price Contract for Painters

WKU-10298 Price Contract for Painters

Bids are requested by Western Kentucky University, from eligible firms located within a 125-mile radius of Bowling Green, KY to establish price contracts for the furnishing of labor, materials, and services for a Job Order Contract for Paint Contractor on facilities utilized by Western Kentucky University. The Paint Contractor shall be capable of providing qualified and skilled tradesmen as may be required. All jobs are to include but are not limited to the Contractor acquiring any necessary permits, inspections, and Performance Bonds where required. For question regarding this bid, please select “Messages” tab in Unimarket to send a message to your WKU contact, Marci Morehead

Project Location: Bowling Green, Kentucky

More Details

Floyd County Board of County Commissioners – Floyd County Bridge No. 506

Floyd County Board of County Commissioners – Floyd County Bridge No. 506

JOB NO. 13009, FLOYD COUNTY BRIDGE NO. 506 which consist of the
replacement of the existing single span bridge with a precast three-sided reinforced concrete
bridge structure and precast concrete wingwalls, all supported on a concrete footing on steel
HP piles. The bridge will provide a clear waterway opening of 9.0 feet high by 22 feet wide
with concrete sidewalk, concrete curb and gutter, concrete railing and approximately 100 feet
of approach work consisting of surface milling, pavement reconstruction with asphalt and
compacted aggregate, concrete curb and gutter replacement, install concrete guardrail
transition, steel guardrail with guardrail end treatments, scour stop, seeding, signing and
pavement markings, and all other items shown on the plans and mentioned in the contract
specifications for a complete project.

Project Location: New Albany, Indiana

More Details

RFB-63-22 KCTCS – BCTC Newtown Campus and Building Signage

RFB-63-22 KCTCS – BCTC Newtown Campus and Building Signage

Estimate:
$ 95,636.00

Estimated Length of Project:
75 (Substantial Completion) + 15 (Final Completion)

The Newtown Campus of Bluegrass Community & Technical College located at 500 Newtown Pike in Lexington (Fayette County) seeks to expand provide additional campus signage for identifying buildings and streets within the campus. There will be grounted mounted signs, building mounted signs and regulatory signs.

Project Location: Lexington

More Details

Elliott County Board of Education – High School HVAC Replacement

Elliott County Board of Education – High School HVAC Replacement

Project consists of Replacing multiple HVAC units, boilers, updating
outside air makeup systems, and removing coal fired boiler.

  1. Project cost range is anticipated to be under $785,000.00

G. Construction Contract: Bids will be received for the following Work:

  1. General Contract (all trades).

Project Location: Sandy Hook, Kentucky

More Details

RFB-56-22 KCIW Replace Boilers in Main Building

RFB-56-22 KCIW Replace Boilers in Main Building

Estimate:
$171,801.00
Estimated Length of Project:
150 (Substantial Completion) + 30 (Final Completion)

Under base bid, remove two existing steam boilers and all steam system components in central mechanical room, including feed tank, heat exchanger, steam and condensate piping, etc. Provide two new condensing heating hot water boilers to feed building’s existing heating hot water loop. New boilers will operate via their own on-board controls, no integration to building automation system. New boilers will include new PVC flues and combustion air intakes. Replace two existing base mounted circulation pumps. There are two addtiive alternates and they will be accepted as funds permit.

Project Location: Peewee Valley

More Details

21-120 / Tucker Station Road Area Water Main Replacement Project

21-120 / Tucker Station Road Area Water Main Replacement Project

Questions: Renee Fromme

Louisville Water Company is requesting Bids for Limits of the referenced project include sections of eight (8) neighborhood streets
located in eastern Jefferson County in the Tucker Station Road area; Brookgreen Drive, Echo Bridge Road, Marengo Drive, Live Oak
Drive, Farmbrook Drive, Rockbridge Road, Creekvalley Road, and Edenwood Drive. The referenced project consists of the supply
and install a total of 6,655 LF of water main, including supply and install of 5,540+/- linear feet of 6-inch DR-18 C900 PVC, 565+/-
linear feet of 8-inch DR-18 C900 PVC, 370+/- linear feet of 6-inch Pressure Class 350 ductile iron water main, and 180+/- linear feet
of 8-inch Pressure Class 350 ductile iron water main, using traditional trench installation techniques. Also included with the project is
the supply and installation of 9 fire hydrants, and the supply and transfer, renewal, relocation, or discontinue of 123+/- customer
services. Fire hydrant removal, main cut and plugs, and restoration on and along Project Limits as stated above shall be included.
Contractor shall supply and install all materials required for the completion of this project.

Questions or inquiries relating to this project must be submitted in writing via email at least seven (7) calendar days prior to the bid
opening date. All questions and inquiries must be sent to the Buyer, Renee Fromme, email at rfromme@lwcky.com.

The Company’s Project Manager’s estimate for the Contract plus Company supplied materials for this Project is $1,000,001 –
$3,000,000. If the Company’s Project Manager’s estimate for the Contract plus Company supplied materials exceeds $250,000: a Bid
Bond is required. For this Contract, a Bid Bond is required.

Bids will only be accepted from Bidders who have been pre-qualified by the Company in the pre-qualification category or categories
that apply to this Bid. This Bid requires prequalification in all of the following categories: 4” – 16” Ductile Iron Water Mains, 4” –
16” PVC Water Mains, and 1” & Smaller Water Services, with a minimum prequalification limit of $1,000,000. The Bidder may
submit a bid that exceeds the amount of the Bidder’s monetary pre-qualification limit set by the Company. For information about prequalification,
contact the Buyer listed above.

Award of the Contract will be based on base bid pricing and is at the Company’s sole discretion. Alternate bid(s) may or may not be
awarded. The Company will award the Contract to the Bidder presenting a Bid that is responsive to the Specifications, is in
substantial compliance with the Contract requirements, and presents the lowest and best price for performing the Work making up the
base bid. The Company may accept the Bid that the Company determines is in the Company’s best interest, which may not necessarily
be the least expensive Bid.

Bid Documents may be obtained from Lynn Imaging located at 11460 Bluegrass Pkwy, Louisville, KY 40299, (502) 499-8400 and
www.lwckyplanroom.com. One copy of the Bid Documents (includes technical specifications and a full set of plans) will be available
at no charge (not including shipping/delivery charges) to Contractors that are prequalified with Louisville Water Company in the
category(ies) specified for this bid. For details regarding the charges that apply to non-prequalified contractors, go to
www.lwckyplanroom.com.

Click Here for the List of Prequalified Bidders

Project Location: Louisville, Kentucky

More Details

21-119 / Sylvania Road Area Water Main Replacement Project

21-119 / Sylvania Road Area Water Main Replacement Project

Questions: Terri Young

Louisville Water Company is requesting Bids for a project that includes sections of six (6) neighborhood streets located in southwestern Jefferson County in the Terry Road area; Rutledge Road, Dale Road, Wood Road, Capella Lane, Memory Lane, and Sylvania Road. The referenced project consists of the supply and install of a total of 6,860 LF of water main, including supply and install of 25+/- linear feet of four (4)-inch DR-18 C900 PVC, 2,460+/- linear feet of six (6)-inch DR-18 C900 PVC, 565+/- linear feet of eight (8)-inch DR-18 C900 PVC, 1,640+/- linear feet of six (6)-inch Pressure Class 350 ductile iron water main, and 2,170+/- linear feet of eight (8)-inch Pressure Class 350 ductile iron water main, using traditional trench installation techniques. Also included with
the project is the supply and installation of eight (8) fire hydrants, and the supply and transfer, renewal, relocation, or discontinue of 87+/- customer services. Fire hydrant removal, main cut and plugs, and restoration on and along Project Limits as stated above shall be included. Contractor shall supply and install all materials required for the completion of this project.

Questions or inquiries relating to this project must be submitted in writing via email at least seven (7) calendar days prior to the bid opening date. All questions and inquiries must be sent to the Buyer, Terri Young, email at tyoung@lwcky.com.

The Company’s Project Manager’s estimate for the Contract plus Company supplied materials for this Project is $1,000,001 – $3,000,000. If the Company’s Project Manager’s estimate for the Contract plus Company supplied materials exceeds $250,000: a Bid Bond is required. For this Contract, a Bid Bond is required.
Bids will only be accepted from Bidders who have been pre-qualified by the Company in the pre-qualification category or categories that apply to this Bid. This Bid requires prequalification in all of the following categories: 4” – 16” Ductile Iron Water Mains, 4” – 16” PVC Water Mains, and 1” & Smaller Water Services Category, with a minimum prequalification limit of $1,000,000. The Bidder may submit a bid that exceeds the amount of the Bidder’s monetary pre-qualification limit set by the Company. For information about pre-qualification, contact the Buyer listed above.

Bid Documents may be obtained from Lynn Imaging located at 11460 Bluegrass Pkwy, Louisville, KY 40299, (502) 499-8400 and www.lwckyplanroom.com. One copy of the Bid Documents (includes technical specifications and a full set of plans) will be available at no charge (not including shipping/delivery charges) to Contractors that are prequalified with Louisville Water Company in the category(ies) specified for this bid. For details regarding the charges that apply to non-prequalified contractors, go to www.lwckyplanroom.com.

Click Here for the List of Prequalified Bidders

Project Location: Louisville, Kentucky

More Details

21-118 / Mamaroneck Road Area Water Main Replacement Project

21-118 / Mamaroneck Road Area Water Main Replacement Project

Questions: Renee Fromme

Louisville Water Company is requesting Bids for Limits of the referenced project include sections of seven (7) neighborhood streets
located in southern Louisville in the Hikes Lane area; Butler Court, Mamaroneck Road, Chatham Road, Tyson Place, Briarbridge
Way, Brinkey Way, and a Public Utility Easement (between Klondike Lane and Brinkey Way). The referenced project consists of the
supply and install a total of 5,780 LF of water main, including supply and install of 450+/- linear feet of 4-inch DR-18 C900 PVC,
2,725+/- linear feet of 6-inch DR-18 C900 PVC, 570+/- linear feet of 8-inch PVC, 1,230+/- linear feet of 6-inch Pressure Class 350
ductile iron water main, 950+/- linear feet of 8-inch Pressure Class 350 ductile iron water main, 45+/- linear feet of 8” HDPE DIPS
SDR-11, and 10+/- linear feet of 16-inch Pressure Class 350 ductile iron water main, using traditional trench installation techniques.
Also included with the project is the supply and installation of 6 fire hydrants, and the supply and transfer, renewal, relocation, or
discontinue of 124+/- customer services. Fire hydrant removal, main cut and plugs, and restoration on and along Project Limits as
stated above shall be included. Contractor shall supply and install all materials required for the completion of this project.

Questions or inquiries relating to this project must be submitted in writing via email at least seven (7) calendar days prior to the bid
opening date. All questions and inquiries must be sent to the Buyer, Renee Fromme, email at rfromme@lwcky.com.
The Company’s Project Manager’s estimate for the Contract plus Company supplied materials for this Project is $1,000,001 –
$3,000,000. If the Company’s Project Manager’s estimate for the Contract plus Company supplied materials exceeds $250,000: a Bid
Bond is required. For this Contract, a Bid Bond is required.

Bids will only be accepted from Bidders who have been pre-qualified by the Company in the pre-qualification category or categories
that apply to this Bid. This Bid requires prequalification in ALL of the following categories: 4” – 16” Ductile Iron Water Mains, 4” –
16” PVC Water Mains, 4”-12” HDPE Water Mains, 1” & Smaller Water Services and 1.5” & Larger Water & Fire Services Category,
with a minimum prequalification limit of $1,000,000. The Bidder may submit a bid that exceeds the amount of the Bidder’s monetary
pre-qualification limit set by the Company. For information about pre-qualification, contact the Buyer listed above.

Award of the Contract will be based on base bid pricing and is at the Company’s sole discretion. Alternate bid(s) may or may not be
awarded. The Company will award the Contract to the Bidder presenting a Bid that is responsive to the Specifications, is in
substantial compliance with the Contract requirements, and presents the lowest and best price for performing the Work making up the
base bid. The Company may accept the Bid that the Company determines is in the Company’s best interest, which may not necessarily
be the least expensive Bid.

Bid Documents may be obtained from Lynn Imaging located at 11460 Bluegrass Pkwy, Louisville, KY 40299, (502) 499-8400 and
www.lwckyplanroom.com. One copy of the Bid Documents (includes technical specifications and a full set of plans) will be available
at no charge (not including shipping/delivery charges) to Contractors that are prequalified with Louisville Water Company in the
category(ies) specified for this bid. For details regarding the charges that apply to non-prequalified contractors, go to
www.lwckyplanroom.com.

Click Here for the List of Prequalified Bidders

Project Location: Louisville, Kentucky

More Details