RFB-14-23 Eddie Prater HP AML Reclamation, Magoffin Co., KY
RFB-14-23 Eddie Prater HP AML Reclamation, Magoffin Co., KY
Estimated Length of Project:
(Substantial Completion) + 120 Calendar Days (Final Completion)
The Eddie Prater site is located at 565 Roanne Road in Salyersville, KY, 41465. Eddie’s slide is located at coordinates Lat 37°36 ‘ 49.18″, Long 83° 02’ 15.48″. On November 12, 2021 a portion of the hillside at Eddie Prater’s residence became unstable and slid down the hill side. The slide area is approximately 250 feet by 141 feet. Eddie Prater is concerned about the slide moving and the trees falling on his outside building. Also, he is concerned about the safety of the county road above the slide blocking the home on the hill, if the slide is not addressed.
To address this concern, the slide area will be stripped to bedrock to remove the threat of more sliding. Once the two outside buildings are moved closer to the cabin above the side area. All excavated earthen material will be placed in an offsite waste area (abandoned sediment pond.) A temporary low water crossing will be installed on the property, to access the slide as shown on the plan view. Sub drains will be constructed along the two coal seams and extended to the creek to drain the water off the slide area and Eddie’s property. Work will be done on the Roanne Road going off on to Roanne Spur Road to allow for the trucks to turn around as shown on the plan view. Roanne Spur Road will be used to access the slide area from the top. Roanne Spur Road will be moved back on to solid rock, due to the slide area under cutting it. Guard railing and guard lagging will be used to stabilize Roanne Spur Road and protect the landowner.
The cost estimate for this work includes plan quantity for the earthwork and additional items for site prep, revegetation, and roadway stone for the county roads included in the cost estimate. In total, the project area encompasses approximately 2.0 acres behind the house of Eddie Prater as marked on the plans. All trees and root balls will be burned on Eddie Prater’s property.
This project will directly disturb the stream, but no permit is needed for temporary low water crossing to access the slide. This project will not address underground mine openings. Trees (1.0 acre) will be disturbed outside of the unstable landslide area; Bat Fund Mitigation will be utilized for this project. All areas disturbed by this project will be revegetated by means of the Standard AML Reclamation Seed Mixture. A quantity of Hydro mulching/Hydro seeding has been included to address revegetation of suitable portions of the landslide area following excavation. Cover crop is also provided in order to provide quick vegetative cover on any disturbed areas that will go undisturbed for at least two weeks, but not be ready for application of permanent revegetation. Sediment control will be provided by silt fences or straw bales along the Creek bank and other areas as needed.
Elliott County Board of Education – Elliott County Schools Restroom Renovations
Elliott County Board of Education – Elliott County Schools Restroom Renovations
This project includes plumbing fixture and interior finishes renovation for six
restrooms (intermediate restroom, high school cafeteria restroom, vocational wing restroom, high
school first floor restroom, high school second floor restroom, new gym lobby restroom) in the Elliott
County School building. One new family restroom will be added in the intermediate restroom.
Existing janitor’s closet at new gym lobby restroom will be demolished and transformed into a new
family restroom with a mop sink closet added.
Project Description: The project is a roof coating and replacement at the Department of Military Affairs – Murray Readiness Center located in Murray, Kentucky. The work consists of two roofing systems, SBS modified bitumen membrane and silicone roof coating for the existing building. Modified bitumen membrane work is the full replacement for the 910 sf Kitchen area. The remainder of the building, approximately 17,000 sf will be coated with silicone roof coating. All of the existing parapet copings, conductor heads and downspouts are also to be replaced.
The project is the epoxy flooring overlay of existing terrazzo flooring on two walks of Cellhouse No. 3. The project involves the flooring preparation and overlay installation of seamless epoxy flooring in the Dayroom and cells. Work shall include floor cleaning, grinding and preparing existing surface, epoxy installation and cove bases.
CCK-2643-23 W.T. Young Library Urethane Foam Roof Phase I
CCK-2643-23 W.T. Young Library Urethane Foam Roof Phase I
NOTICE: PROJECT HAS BEEN CANCELLED
Phase I is to install 1/2 of the roof system on W.T. Young Library. The work is to remove the
ballast from the existing EPDM roof-membrane, install a urethane coated SPFR system and
install the sleepers for a future roof-top work platform. The sleepers will be embedded into the
foam of the SPR system. The future work-platform is for maintenance-access to the building
Cupola and the Rotunda roof, exterior walls, built-in gutters, downspouts and windows. The
work platform is to be constructed on the perimeter of the large roof central-skylight system in
order to accommodate a lift reaching to the top of the Rotunda.
City of Madisonville – Ahlstrom Sanitary Sewer Extension
City of Madisonville – Ahlstrom Sanitary Sewer Extension
The primary scope of work includes the installation of approximately 1,549 LF of 10-inch PVC
SDR 35 gravity sewer, 250 LF of 8-inch PVC SDR 35 gravity sewer, 7 manholes, 60 LF of 18-
inch steel encasement pipe, and related appurtenances.
Rowan County Board of Education – Rodburn Elementary School ARP ESSER Addition and Renovation
Rowan County Board of Education – Rodburn Elementary School ARP ESSER Addition and Renovation
The project will consist of HVAC replacement and associated renovation and a 4-
room classroom addition to the existing Rodburn Elementary School located 91 Christy Creek, Morehead,
KY. Alternate bids will also be accepted as described in the bidding documents and section 01800
Alternates. The detailed language specific to the bid package is located in section 01900 of the project
manual.
Knox County Board of Education – Lynn Camp High School Phase 1 Roof Replacement
Knox County Board of Education – Lynn Camp High School Phase 1 Roof Replacement
The project site is located at 100 N Kentucky 830, Corbin, KY 40701. The bid is to furnish all
necessary labor, materials, tools, machinery, warranties, and all other items required to meet
the renovations per plans and specifications. Work to include, but not limited to; Roof
Replacement.
Interior remodeling of an existing 2,995 square feet Classroom facility. Work includes miscellaneous interior demolition of gypsum board partitions, ceilings, and demolition of mechanical, electrical and plumbing items.
New construction includes creating two Classrooms and ancillary spaces. Construction of Toilets, Storage and a Lactation Rooms including, new hollow metal frames, wood doors and hardware. Work includes floor, ceiling and wall finishes. Installation of an all new ductwork, extensive plumbing work and electrical work
Westar – Derby City Gaming (DCG) Downtown – BP 04 – Building Fit-Out
Westar – Derby City Gaming (DCG) Downtown – BP 04 – Building Fit-Out
1. Overall project consists of the selective demolition of existing finishes and structures
within the old US Bank Building. When completed the full rebuild of the building will
house Churchill Downs Inc.’s Derby City Downtown Gaming, consisting of two floors of
HRM gaming areas, support space, kitchen, and multiple bar and food options. In addition
to the two lower gaming floors the project also refurbishes three floors of an upper level
parking garage. All new upgraded utility services will supply the building.
2. The scope of work contained in this Bid Package includes the early selection of
subcontractors who will design and install micropiles for new building and retaining wall
foundations and who will detail, fabricate, and install the structural steel and decking for
the reinforcement of the building and for the building additions along Market Street and
Fourth Street. The bid documents being used for this bid are a progress set of the structural
drawings and specifications and are not final, but they appear to be far enough along to be
representative of the scope of work. Final pricing per the completed design will need to be
established with the selected bidder or bidders, depending on what is in the best interest of
the owner, before issuing a subcontract.
Southern Water & Sewer District – Wayland to Lackey Waterline Extension Project
Southern Water & Sewer District – Wayland to Lackey Waterline Extension Project
The Project consists of construction services for Southern Water and Sewer District proposed
replacement of aging waterlines that extends from the community of Wayland and running north along
KY Route 7 to the community of Lackey both located Floyd County, Kentucky.
The Town of Sellersburg has developed plans for the development of Bill Mosely
Park at Mosely Park Rd, Sellersburg, IN 47172. The project limits span a 1.6-acre area surrounding the Sellersburg Town Pool. Land and Water Conservation Fund monies will be used to assist in the park development; all relevant requirements will apply.
Town of Sellersburg – Sellersburg Water System Connection to Indiana American Water
Town of Sellersburg – Sellersburg Water System Connection to Indiana American Water
The Project includes the following Work:
This project consists of the installation of approximately 590 LF of 10” and 6” water main,
appurtenances, and a concrete vault for flow control and flow metering.
The project includes providing all construction supervision, labor, materials, tools, test equipment
necessary for the Hartland 2 Pump Station Upgrades, to include emergency pump bypass
connections, replacement of all operating valves, upgrade of electrical controls and conduit, and
replacement of pumps and associated equipment.
Morgan County Water District – Waterline Replacement Phase 2
Morgan County Water District – Waterline Replacement Phase 2
Work is to include installation of approximately 50,000 LF of 8-inch waterline, 7,700 LF of 6-inch
waterline, 31,700 LF of 4-inch waterline, and 2,520 LF of 3-inch waterline and other appurtenances,
replacement service meters with telemetry and other replacement equipment as shown.
This project includes renovation of the Curris Center on all existing floors including the following: Restrooms, Lobbies, Welcome Center, Student Involvement Offices,
Conference Rooms, and Esports spaces. Seven Alternates are also included as follows:
Alternate 1 – Additional Painting as shown on documents
Alternate 2 – Provide Fire Alarm per specification
Alternate 3 – HVAC Controls per specification
Alternate 4 – Flush Valves by Sloan Flush Valves
Alternate 5 – Conference rooms 310A and 310B
Alternate 6 – Commonwealth Suite, Rooms 300E, 308 and 309
Alternate 7 – Provide Delaney Ball Valves
Mercer County Library – History / Heritage Research Center
Mercer County Library – History / Heritage Research Center
Building Renovation and Addition of approx. 3300 SQ.FT.
Demolition and Selective Demolition of existing 2 story frame
structure and selective portions of the existing historic
masonry section of the house. This includes the removal of
all foundation materials that conflict with new work of the
addition, with proper removal from site all associated
material of the demolition.
The addition is typical 2×6 wood frame brick veneer, and or
cement fiber siding construction, with a masonry wall and
steel and metal deck concrete roofed “rated construction”
records room. Other miscellaneous steel material and
fabrications. Concrete foundations and slab on grade floors
for the addition. Includes, Foundation and utility service
excavation, foundation insulations, drain system, fill and
backfill. Dimensional Shingle roofing over proper
underlayment and plywood roof deck. gutters and Down spouts.
Exposed truss fabrications and stick framed roofing with
plywood deck. Exposed wood plank interior ceiling area.
Cabinetry and Finish carpentry – Casework and wood trims,
wood interior doors and wood/alum entry door and frame,
aluminum clad replacement windows in the historic sections
and similar units for the new addition. Composite fiber board
and vinyl soffit and eave trims. Drywall systems, plaster
repair, acoustic ceiling systems, painting, stain concrete
and (wood floor refinishing- historic section), ceramic tile,
and vinyl floor coverings in the addition. All envelope
insulations for walls and attics (fiberglass/ spray foam)
inclusive of sound insulations. All Mechanical/ Electrical /
Plumbing systems. Provide for new connections to all utility
service taps. Mini split H.V.A.C. systems (elec), Plumbing
and plumbing system fixtures. Electrical service panel/ meter
relocation. Lighting equipment and fixtures, and data
service. All Site preparation and coordination for all
utility services connections, excavation. Site concrete and
paving, and minor landscaping and pavilion structure.