Knox County Utility Commission – Barbourville Connection – KY 225

Knox County Utility Commission – Barbourville Connection – KY 225

This project consists of installation of approximately 15,940
linear feet of 8”, 4”, 3”, 2”, and 1” PVC, SDR-17 waterline, 530 linear feet of 8”
D.I. waterline with nitrile gaskets, 1,125 linear feet of 10” PE waterline, a 300
GPM pump station, and all necessary appurtenances.
The engineer’s estimate is
$1,850,000.

Project Location: Corbin, Kentucky

More Details

City of Mayfield – Temporary Fire Station

City of Mayfield – Temporary Fire Station

The work for this project is related to Severe Storms, Straight-Line Winds, Flooding and Tornadoes that
occurred in Western Kentucky on December 10th and December 11th, 2021 which resulted in Presidential
Declaration of Disaster dated December 12, 2021, 4630-DR-KY. This is an acknowledgement that FEMA
Financial Assistance Awards will be used to fund a portion of the Project Contract. All Bidders shall
comply with all applicable federal law, regulations, executive orders, FEMA policies, procedures, and
directives including, but not limited to those found in the Volume One Project Manual Bidding and
Contract Documents.

Project Location: Mayfield, Kentucky

More Details

RFB-153-23 Parks – JJ Audubon Museum Roof Replace – West

RFB-153-23 Parks – JJ Audubon Museum Roof Replace – West

Estimate:
$740,000.00

Estimated Length of Project:
150 (Substantial Completion) + 30 (Final Completion)

1. Remove existing slate shingles and underlayment to decking where indicated on Drawings.
a. Remove individual damaged slate on other roof areas as indicated on Drawings.
b. Remove existing snow guards.
c. Remove existing roof flashing.
2. Remove damaged existing plywood roof sheathing if discovered.3. Remove damaged existing wood fascia board and trim if discovered.
4. Remove damaged existing wood siding where indicated on Drawings.
5. Install new modified bitumen underlayment, including ice and water shield.
6. Install new slate shingle roofing.
a. Install new slate shingles where individual shingles were removed from other roof areas.
7. Repair laps in existing lead coated copper gutters.

Project Location: Henderson

More Details

RFP-148-23 KET – Next Gen Conv

RFP-148-23 KET – Next Gen Conv

Estimate: $3,766,250.00 (Maximum Not to Exceed Amount)

Estimated Length of Project: 358 (Substantial Completion) + 60 (Final Completion)

Project Description: The Finance Cabinet, Division of Engineering and Contract Administration (DECA) is seeking Integration services for system upgrades at KET (Kentucky Educational Television) to upgrade Master Control and Broadcast Infrastructure. This project includes:
A. Master Control
1. Automation
2. Playout servers (including switching and graphics)
3. Traffic integration
4. KVM computer controls
5. Audio/video bypass switchers
6. Multi-viewer system
7. Supporting equipment (picture monitors, audio speakers, rasterizers and scopes, computer workstations, XD-CAM decks, furniture/consoles, racks)
B. Broadcast Infrastructure
1. Video/audio router
2. LTO deep archive
3. Media Asset Management
4. Network edge switches
5. Virtual Server Environment
6. Conversion and distribution

Project Location:

More Details

West Shelby Water District – Discovery Point Phase 320 – Waterline Extension

West Shelby Water District – Discovery Point Phase 320 – Waterline Extension

This contract consists of installing approximately 220 L.F. of 6”
PVC, SDR-21 and 600 L.F. of 8” PVC, SDR-21 waterline and all other necessary
appurtenances.
The engineer’s estimate is $105,000.

Project Location: Simpsonville, Kentucky

More Details

West Shelby Water District – Discovery Point Phase 310 – Waterline Extension

West Shelby Water District – Discovery Point Phase 310 – Waterline Extension

This contract consists of installing approximately 820 L.F. of 6”
PVC, SDR-21 and 720 L.F. of 8” PVC, SDR-21 waterline and all other necessary
appurtenances.

The engineer’s estimate is $145,000.

Project Location: Simpsonville, Kentucky

More Details

Rutherford Ave Alley Drainage Improvement Project

Rutherford Ave Alley Drainage Improvement Project

Sealed Bids addressed to the Louisville and Jefferson County Metropolitan Sewer District, 700 West Liberty Street, Louisville, Kentucky 40203 for the construction of Rutherford Ave Alley Drainage Improvement Project Contract No. 2023-016, Budget ID No. C23102, will be received at the office of MSD until 10:00 a.m., Local Time, Tuesday, December 6, 2022, and will be publicly opened and read at that place and time. The public may attend the bid opening via teleconference call.

Description and location of Project: To perform the drainage improvement along the alley behind Rutherford Ave. All work shall be done in accordance to MSD’s Standard Specifications.

There will be no pre-bid meeting held for this project.

The Engineer’s Construction Cost Estimate for this project is between $60,000.00 and $100,000.00.

The bid documents will be available on, November 18, 2022, online at www.msdbids.com. The charge for each set of bid documents is outlined on the above-referenced web site.

Persons wishing to view the bid documents may do so online at www.msdbids.com or at the following locations: Builders Exchange of Louisville, Inc., 2300 Meadow Drive; Associated Builders & Contractors of Kentuckiana, 1810 Taylor Avenue; and F. W. Dodge, 1812 Taylor Avenue; all located in Louisville, Kentucky; and the Associated General Contractors of Kentucky, 2321 Fortune Drive, Suite 112, Lexington, Kentucky.

The Project Manager for this Invitation to Bid is Joseph Exely. All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s Procurement Buyer Karen Elzy at karen.elzy@louisvillemsd.org. Questions received less than two days prior to the date for opening of bids may not be answered. Only answers by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD’s Chief Engineer, David W. Johnson, P.E.

MSD SUPPLIER DIVERSITY MINORITY AND WOMAN BUSINESS ENTERPRISE PROGRAM POLICY AND PROCEDURES MANUAL (MBE/WBE PROGRAM) – FOR CONSTRUCTION CONTRACTS $150,000 AND GREATER for Minority Business Enterprise (MBE) and Woman Business Enterprise (WBE) subcontracting participation. Effective June 1, 2020, MSD has adopted and implemented the revised MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual, modifying the MBE and WBE participation goals on construction services and construction-related services, in accordance with the MSD Disparity Study (Study). The Study provided the factual predicate for MSD to establish new MBE and WBE goals in MSD contracting. The MSD MBE\WBE Program modified subcontracting goals are listed below:

If selected as applicable below, the Contractor must subcontract at least 18.0% of the total amount of the Contract Bid price to certified African American minority-owned businesses, at least 2.0% of the total amount of the Contract Bid price to a certified Asian-Indian American minority-owned businesses, and at least 15.0% total amount of the Contract Bid price to certified Caucasian Female businesses. If the Contractor is unable to meet the goals, they must demonstrate adequate “GOOD FAITH EFFORTS” in accordance with the MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program) – (see MSD MBE/WBE Program – Construction Subcontracting Goal Documents and Forms at http://louisvillemsd.org/SupplierDiversity/forms).

All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s Procurement Buyer, Karen Elzy at karen.elzy@louisvillemsd.org. Due to the current Coronavirus (COVID-19) pandemic measures, MSD will be hosting a Teleconference call in the place of a face-to-face public opening. MSD will also post the As-Read Bid Summary as soon as available. To take part in the Bid Opening Teleconference Call, please call 502-654-8113 and enter code 545 127 290#.

MSD SUPPLIER DIVERSITY PROGRAM: Not Applicable

The revised MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program) is effective June 1, 2020. If applicable, the goals are as follows:

18.0% MBE – African American, 2.0% MBE – Asian-Indian American and

15.0% WBE – Caucasian Female participation respectively required for this project.

MSD BID DISCOUNT: Applicable

This MSD construction project is bid and advertised as: check applicable below

Construction Services: X
Construction-related Services:

LOCAL LABOR COMMITMENT PREFERENCE: No

COMMUNITY BENEFITS PROGRAM: No

The contract will be awarded on the basis of the lowest, responsive, responsible bid, subject to the approval of the MSD Board. MSD reserves the right to reject any or all bids or waive any informality in any bid.

MBE and WBE businesses are encouraged to bid on this project as a prime contractor.

LOUISVILLE AND JEFFERSON COUNTY

METROPOLITAN SEWER DISTRICT

David Johnson, P.E.
Chief Engineer

Rene’ Lindsay, CPPO
One Water Chief Procurement Officer

Project Location: Louisville, KY

More Details

10214 Brownhurst Court Drainage Improvement Project

10214 Brownhurst Court Drainage Improvement Project

Sealed Bids addressed to the Louisville and Jefferson County Metropolitan Sewer District, 700 West Liberty Street, Louisville, Kentucky 40203 for the construction of 10214 Brownhurst Court Drainage Improvement Project Contract No. 2023-015, Budget ID No. C23100, will be received at the office of MSD until 10:00 a.m., Local Time, Thursday, December 8, 2022, and will be publicly opened and read at that place and time. The public may attend the bid opening via teleconference call.

Description and location of Project: To perform the drainage improvements along the rear of Brownhurst Court. All work shall be done in accordance to MSD’s Standard Specifications.

There will be no pre-bid meeting held for this project.

The Engineer’s Construction Cost Estimate for this project is between $80,000.00 and $111,000.00.

The bid documents will be available on, November 18, 2022, online at www.msdbids.com. The charge for each set of bid documents is outlined on the above-referenced web site.

Persons wishing to view the bid documents may do so online at www.msdbids.com or at the following locations: Builders Exchange of Louisville, Inc., 2300 Meadow Drive; Associated Builders & Contractors of Kentuckiana, 1810 Taylor Avenue; and F. W. Dodge, 1812 Taylor Avenue; all located in Louisville, Kentucky; and the Associated General Contractors of Kentucky, 2321 Fortune Drive, Suite 112, Lexington, Kentucky.

The Project Manager for this Invitation to Bid is Joseph Exely. All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s Procurement Buyer Karen Elzy at karen.elzy@louisvillemsd.org. Questions received less than two days prior to the date for opening of bids may not be answered. Only answers by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD’s Chief Engineer, David W. Johnson, P.E.

MSD SUPPLIER DIVERSITY MINORITY AND WOMAN BUSINESS ENTERPRISE PROGRAM POLICY AND PROCEDURES MANUAL (MBE/WBE PROGRAM) – FOR CONSTRUCTION CONTRACTS $150,000 AND GREATER for Minority Business Enterprise (MBE) and Woman Business Enterprise (WBE) subcontracting participation. Effective June 1, 2020, MSD has adopted and implemented the revised MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual, modifying the MBE and WBE participation goals on construction services and construction-related services, in accordance with the MSD Disparity Study (Study). The Study provided the factual predicate for MSD to establish new MBE and WBE goals in MSD contracting. The MSD MBE\WBE Program modified subcontracting goals are listed below:

If selected as applicable below, the Contractor must subcontract at least 18.0% of the total amount of the Contract Bid price to certified African American minority-owned businesses, at least 2.0% of the total amount of the Contract Bid price to a certified Asian-Indian American minority-owned businesses, and at least 15.0% total amount of the Contract Bid price to certified Caucasian Female businesses. If the Contractor is unable to meet the goals, they must demonstrate adequate “GOOD FAITH EFFORTS” in accordance with the MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program) – (see MSD MBE/WBE Program – Construction Subcontracting Goal Documents and Forms at http://louisvillemsd.org/SupplierDiversity/forms).

All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s Procurement Buyer, Karen Elzy at karen.elzy@louisvillemsd.org. Due to the current Coronavirus (COVID-19) pandemic measures, MSD will be hosting a Teleconference call in the place of a face-to-face public opening. MSD will also post the As-Read Bid Summary as soon as available. To take part in the Bid Opening Teleconference Call, please call 502-654-8113 and enter code 287 401 229#.

MSD SUPPLIER DIVERSITY PROGRAM: Not Applicable

The revised MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program) is effective June 1, 2020. If applicable, the goals are as follows:

18.0% MBE – African American, 2.0% MBE – Asian-Indian American and

15.0% WBE – Caucasian Female participation respectively required for this project.

MSD BID DISCOUNT: Applicable

This MSD construction project is bid and advertised as: check applicable below

Construction Services: X
Construction-related Services:

LOCAL LABOR COMMITMENT PREFERENCE: No

COMMUNITY BENEFITS PROGRAM: No

The contract will be awarded on the basis of the lowest, responsive, responsible bid, subject to the approval of the MSD Board. MSD reserves the right to reject any or all bids or waive any informality in any bid.

MBE and WBE businesses are encouraged to bid on this project as a prime contractor.

LOUISVILLE AND JEFFERSON COUNTY

METROPOLITAN SEWER DISTRICT

David Johnson, P.E.
Chief Engineer

Rene’ Lindsay, CPPO
One Water Chief Procurement Officer

Project Location: Louisville, KY

More Details

RFB-158-23 KET Next Gen Conv – Facility Upgrades

RFB-158-23 KET Next Gen Conv – Facility Upgrades

Estimate:
$2,284,023.00

Estimated Length of Project:
Dates included in Specs. (Substantial Completion) + 30 (Final Completion)

This project consists of the following improvements in the existing Kentucky Educational Television Network Center at 600 Cooper Drive, Lexington, Kentucky. These upgrades include replacement of the building copper and fiber data cabling;
replacement of an Owner-Furnished chiller; replacement of an Owner-Furnished rooftop air-handler; replacement of an existing Halon fire suppression system with new chemical suppression; replacement of an Owner-Furnished central UPS system; and architectural revisions in select spaces.

Project Location: Lexington

More Details

RFB-154-23 KYTC – Section Engineer Office District 8

RFB-154-23 KYTC – Section Engineer Office District 8

Estimate:
$401,667.00

Estimated Length of Project:
140 (Substantial Completion) + 30 (Final Completion)

The project is located in Somerset, Kentucky at the District 8 Highway Department Maintenance Garage. Project consist of a new 2,000 square feet light wood frame construction office building with pre-engineered wood trusses on reinforced concrete slab on grade, CMU foundation walls, and reinforced concrete spread footings. Exterior work includes painted cementitious lap siding, fiberglass windows, hollow metal doors/frames, prefinished metal soffits/break metal trims, and fiberglass asphalt shingle roofing. Interior work includes painted gypsum board assemblies, acoustic tile ceilings, rubber base & epoxy flooring throughout. Plumbing works includes two toilets, custodial, and small kitchenette. Mechanical work includes HVAC and ventilation systems. Electrical work includes LED interior/exterior lighting, power, and communications systems. Site work and improvements includes grading, concrete sidewalks/mow strips, and asphalt ADA van accessible parking space. New office building will replace the two existing modular building and storage shed currently on site. Project intent is for staff to remain in existing office facilities while construction of the new office building commences. Once the new office building is finished, the staff will move into the new building and the existing modular building will be removed/demolished by the user agency (NIC). User Agency will provide site grading and millings at demolished modular footprints (NIC).

Project Location: Somerset

More Details

RFB-156-23 KCTCS-Student Center Roof Replacement – Elizabethtown CTC

RFB-156-23 KCTCS-Student Center Roof Replacement – Elizabethtown CTC

Estimate:
$194,794.00

Estimated Length of Project:
5/18/23 (Substantial Completion) + 30 (Final Completion)

This project consists of the roof replacement of the 7,900 SF roof system on the Student Center building. In the plan Northwest quadrant of the roof, the existing built-up roof system and lightweight concrete will be removed down to the concrete deck and replaced with tapered polyiso insulation. For the remaining areas of the roof, only the built up roof system will be removed down to the existing lightweight concrete and new roof system will be installed on top. The existing masonry coping will be removed and replaced with manufactured metal fascia.

Project Location: Elizabethtown

More Details

RFB-152-23 KYTC – New Roof & Gutter for Hardin, Caldwell, Hancock, & Logan

RFB-152-23 KYTC – New Roof & Gutter for Hardin, Caldwell, Hancock, & Logan

Estimate:
$348,444.00

Estimated Length of Project:
150 (Substantial Completion) + 15 (Final Completion)

The KYTC – New Roof & Gutter for Hardin, Caldwell, Hancock, & Logan project is being undertaken to extend the usable life of the buildings on the sites on which they sit and to maintain weather resistance of the buildings. The existing roofs are architectural profile metal with gutters and downspouts, and will be re-roofed in a PVC membrane with new gutters, downspouts and accessories.
The project is comprised of (4) different building on (4) different sites in (4) different counties, as listed below. They are all double pitched roofs and all buildings have a small addition onto their long sides with a lower roof, which are also being re-covered. All of the buildings are a single footprint.
LIST OF BUILDINGS AND COUNTIES:
A. Special Crew Building – S047-463-G, Elizabethtown KY, Hardin County
B. Maintenance Garage – S046-495-A, Hawesville KY, Hancock County
C. Maintenance Garage – S017-500-A, Princeton KY, Caldwell County
D. Maintenance Garage – S071-518-A, Russellville KY, Logan County

Project Location: Hardin, Hancock, Caldwell and Logan Counties

More Details

Jefferson County Public Schools – Trunnell Elementary School Partial Roof Replacement

Jefferson County Public Schools – Trunnell Elementary School Partial Roof Replacement

Scope of Work:

Complete tear off; including existing membrane, roof insulation,
vapor retarder, and all sheet metal components. Install new 2-ply
vapor retarder, 2-layers of 2.0” Polyisocyanurate roof insulation,
tapered insulation system, 0.5” coverboard, and base ply of SBS
membrane system, all in hot asphalt. Install 2-ply base flashing
system and all sheet metal components as required. Install granule
surfaced cap sheet in cold adhesive and heat weld all side and
end laps.

Project Location: Louisville, Kentucky

More Details

RFB-157-23 Parks – LB Lake Barkley Little River Lodge Roof Replacement

RFB-157-23 Parks – LB Lake Barkley Little River Lodge Roof Replacement

Estimate:
$ 75,000.00

Estimated Length of Project:
30 (Substantial Completion) + 30 (Final Completion)

1. Remove existing asphalt shingles and underlayment to decking.
2. Remove existing plywood roof sheathing that has been damaged and deteriorated.
3. Remove existing gutters and downspouts.
4. Install new ice and water shield over 100% of area to be reroofed.
5. Install new dimensional, asphalt shingles.
6. Install new prefinished, galvanized steel gutters, downspouts, and trim where indicated on Drawings.

Project Location: Cadiz

More Details

City of Wingo – 2022 Sliplining Project

City of Wingo – 2022 Sliplining Project

The work to be bid upon is described as follows:

– Clean and inspect (CCTV camera) 5,500 LF OF 8” gravity sewer
– Install 5,500 LF OF 8” Cured In Place Pipe Lining
– 6 point repairs
– Remove 10 protruding laterals
– Time allowed for completion of the Project is 90 consecutive calendar days.

Project Location: Wingo, Kentucky

More Details

Mountain Water District – Water Loss Prevention Plan Phase 1-Contract 2

Mountain Water District – Water Loss Prevention Plan Phase 1-Contract 2

The work to be bid is described as follows:

CONTRACT 295-22-02

Water Loss Prevention Plan, Phase 1, shall consist of the following:
The provision of security fencing, water storage tank access road maintenance,
and hydroseeding for 22 tank sites, rehabilitation of 2 existing water storage tanks,
and the installation of 2 water storage skid tanks.

Project Location: Pikeville, Kentucky

More Details

Letcher County Water and Sewer District – Flood Recovery Residential Meter & Water Line Repairs

Letcher County Water and Sewer District – Flood Recovery Residential Meter & Water Line Repairs

The work to be bid is described as follows:

CONTRACT 519-22-01, FLOOD RECOVERY RESIDENTIAL METER AND WATER LINE
REPAIRS

Repair and/or replacement of approximately 125 residential meter, replacement
of approximately 2,500 linear feet of ¾-inch polyethylene service line, and installation
of approximately 500 linear feet of 8-inch and 4-inch polyethylene water line via
directional drill.

Project Location: Mayking, Kentucky

More Details

Green County Board of Education – ATC Welding Lab Expansion

Green County Board of Education – ATC Welding Lab Expansion

Sealed bids will be received by the Green County Board of Education for the ATC Welding Lab Expansion in Greensburg, Kentucky.

Project Location: Greensburg, Kentucky

More Details

Mountain Water District – Water Loss Prevention Plan Phase 1-Contract 1

Mountain Water District – Water Loss Prevention Plan Phase 1-Contract 1

The work to be bid is described as follows:

CONTRACT 295-22-01

Water Loss Prevention Plan, Phase 1, shall consist of the following:
The installation of cellular or satellite telemetry systems at 22 booster pump
station and 22 water storage locations, as well as the installation of twenty-two 2-
inch zone meters (one at each booster pump station site). Additionally, the
installation of radio telemetry at multiple sites

Project Location: Pikeville, Kentucky

More Details

UK-2301-23 RFP Construction Management Services For Pence Hall – Asset Preservation #2590.3

UK-2301-23 RFP Construction Management Services For Pence Hall – Asset Preservation #2590.3

The University of Kentucky desires the services of an experienced and highly qualified construction
management firm to provide “FULL SERVICE” construction management on the proposed project.
The Construction Manager (CM) selected will become a responsible, cooperative and contributing
member of the Owner’s professional team for the design and construction of the project. The
Construction Manager (CM) will provide assistance and advice and provide management services to
the Owner and design consultants to assure the project is completed within defined budget, program
and schedule.

Project Location: Lexington, Kentucky

More Details

Jefferson County Public Schools – Wilder Elementary School Partial Roof Replacement

Jefferson County Public Schools – Wilder Elementary School Partial Roof Replacement

This project will replace approximately 208 roof squares.

Project Location: Louisville, Kentucky

More Details

Jefferson County Public Schools – Byck Elementary School Partial Roof Replacement

Jefferson County Public Schools – Byck Elementary School Partial Roof Replacement

This project will replace approximately 90 roof squares.

Project Location: Louisville, Kentucky

More Details

Jefferson County Public Schools – Jeffersontown Elementary School Partial Roof Replacement

Jefferson County Public Schools – Jeffersontown Elementary School Partial Roof Replacement

This project will replace approximately 270 squares of modified roof
and replacement of 3,000 square feet of insulated metal wall panels.

Project Location: Louisville, Kentucky

More Details

CCK-2673-23 Spindletop Elevator Modernization

CCK-2673-23 Spindletop Elevator Modernization

The project is to modernize the Spindletop Mansion Elevator. The project includes upgrading
the equipment, hoist way, and pit to current codes.

Project Location: Lexington, Kentucky

More Details

RFB-150-23 KHEAA HVAC & Miscellaneous Upgrades

RFB-150-23 KHEAA HVAC & Miscellaneous Upgrades

Estimate:
$2,305,520.00

Estimated Length of Project:
365 (Substantial Completion) + 30 (Final Completion)

Project shall include the HVAC renovation of four floors of the KHEAA building. HVAC scope shall include replacement of two roof top air handling units, replacement of the underfloor air diffusers with wifi enabled diffusers, additional fan powered terminal units and new controls for all existing overhead VAV terminal units. Architectural scope shall include adding insulation to the exterior wall at structural beam locations including the roof level. New storefront doors will be installed at both entrances.

Project Location: Frankfort

More Details