Contract No. 1 WWTP Improvements Belt Filter Press and Building
Contract No. 1 WWTP Improvements Belt Filter Press and Building
The program of work for which bids are to be submitted consists of the construction of a 0.8 meter skid mounted belt filter press and building including all related appurtenances as shown on the Drawings and described in the Specifications.
The work includes two bid items. Bid item #1 includes but is not limited to selective demolition and installation of bathroom fixtures in the existing building. Renovating the existing room finishes is included in the bathroom. Bid item #2 includes but is not limited to attachment to an existing sewer line and installation of new line and a lift pump is included.
Invited Generals are as follows…ABEL Construction, DW Wilburn, Hawkins Construction, Inc., Hayden Company, Inc., JMBA, Inc., Owens Construction, Inc., Raisor Construction, Inc., and Woodford Builders. The project consists of the Construction of approximately 30,410 SF new Worship and educational building on One Floor level plus Sanctuary seating balcony and mechanical mezzanine.
Miami Township Fire Station 51 and Public Works Facility
Miami Township Fire Station 51 and Public Works Facility
General Construction, Plumbing, Fire Protection, HVAC and Electrical Work for a 1 story, 13,200 SF fire startion and a 1 story, 53,000 SF public works facility.