Conestoga Water Storage Tank
Conestoga Water Storage Tank
Base Bid A – Base Bid Lump Sum Work consists of providing all labor, rigging, tools, equipment, and materials to furnish and install one (1) complete 1.5MG Welded Steel Ground Storage Tank (Tank #1) including road work, site work, electrical work, piping, drainage, utilities, restoration, removing existing 8-inch water line, and relocating existing services, as noted on contract documents.
Base Bid B – Base Bid Lump Sum Work consists of providing all labor, rigging, tools, equipment, and materials to furnish and install one (1) complete 1.5MG Bolted, Glass-Lined Ground Storage Tank (Tank #1) including road work, site work, electrical work, piping, drainage, utilities, restoration, removing existing 8-inch water line, and relocating existing services, as noted on contract documents.
Base Bid C – Base Bid Lump Sum Work consists of providing all labor, rigging, tools, equipment, and materials to furnish and install one (1) complete 1.5MG Prestressed Concrete Ground Storage Tank (Tank #1) including road work, site work, electrical work, piping, drainage, utilities, restoration, removing existing 8-inch water line, and relocating existing services, as noted on contract documents.
Alternate Bid A- Provide Second 1.5MG Welded Steel Ground Storage Tank (Tank #2) complete including foundation, electrical, utilities, control vault, and site work
Alternate Bid B- Provide Second 1.5MG Bolted, Glass-Lined Ground Storage Tank (Tank #2) complete including foundation, electrical, utilities, control vault, and site work.
Alternate Bid C- Provide Second 1.5MG Prestressed Concrete Ground Storage Tank (Tank #2) complete including foundation, electrical, utilities, control vault, and site work.
Louisville, KY