111318 Lincoln County Call 108

KYTC

LINCOLN

CALL 108CONTRACT ID 111318

LINCOLN COUNTY

HPP 0142 (009): MASON GAP ROAD (KY 698) CURVE REALIGNMENT, WIDENING AND
RECONSTRUCTION OF KY 698 JUST SOUTH OF STANFORD, A DISTANCE OF 0.14 MILES. GRADE &
DRAIN WITH ASPHALT SURFACE.
SYP NO. 08-00141.00.

LYNN IMAGING, FRANKFORT, KY

CLICK HERE TO ORDER

111317 Graves County Call 324

KYTC

GRAVES

CALL 324
CONTRACT ID 111317
GRAVES COUNTY

FD04 SSP 042 NEW ROUTE: MURRAY-MAYFIELD ROAD (KY 80) SPP FROM THE INTERSECTION OF
KY121 TRUCK ROUTE EAST OF MAYFIELD EXTENDING SOUTHWEST TO THE KY303, A DISTANCE OF 1.
13 MILES. GRADE & DRAIN AND PAVEMENT ALTERNATES.
SYP NO. 01-00181.40.

LYNN IMAGING, FRANKFORT, KY

CLICK HERE TO ENTER

111305 Jefferson County Call 100

KYTC

JEFFERSON

CALL 100
CONTRACT ID 111305
JEFFERSON COUNTY

IM 2652 (024): GENE SNYDER FREEWAY (I-265) AND BARDSTOWN ROAD (US 31E) IMPROVE
INTERCHANGE AT I-265-US 31E, A DISTANCE OF 0.49 MILES. GRADE & DRAIN WITH PCC
PAVEMENT.
SYP NO. 05-00264.00.

LYNN IMAGING, FRANKFORT, KY

CLICK HERE TO ORDER

111024 Christian County Call 200

KYTC

CHRISTIAN

CALL 200
CONTRACT ID 111024
CHRISTIAN COUNTY

024GR11D024
I-24/US-41A INTERCHANGE
THE DBE PARTICIAPTION GOAL IS 0.00%.

CHRISTIAN COUNTY
IM 0243(050): I-24/US-41A INTERCHANGE MODIFY I-24/US-41A INTERCHANGE AT FORT
CAMPBELL . JPC PAVEMENT REPAIRS – DIAMOND GRINDING. SYP NO. 02-00213.00.

CHRISTIAN COUNTY
JL03 024 041A 004-014 032D: US-41A MODERNIZE US-41A FROM I-24 TO LOVERS LANE BY
ADDING SHOULDERS AND TURN LANES. ASPHALT REHAB WITH GRADE & DRAIN. SYP NO.
02-00311.10.

LYNN IMAGING, FRANKFORT, KY

CLICK HERE TO ORDER

111022 Fayette County Call 106

KYTC

FAYETTE

CALL 106
CONTRACT ID 111022
FAYETTE COUNTY

NH 2681(026): HARRODSBURG ROAD(US 68) CONSTRUCTION OF DOUBLE CROSSOVER DIAMOND
INTERCHANGE ON HARRODSBURG RD.(US-68) AT NEW CIRCLE RD.(KY-4). GRADE & DRAIN WITH
ASPHALT SURFACE.
SYP NO. 07-00144.01.

LYNN IMAGING, FRANKFORT, KY

CLICK HERE TO ORDER

111018 Barren County Call 105

KYTC

BARREN

CALL 105
CONTRACT ID 111018
BARREN COUNTY

IMD 8368(002): GLASGOW-BOWLING GREEN ROAD (US 68/KY 80) US-68 AT HIGHLAND GLEN
INDUSTRIAL PARK. ASPHALT SURFACE WITH GRADE & DRAIN.
SYP NO. 03-00143.00.

LYNN IMAGING, FRANKFORT, KY

CLICK HERE TO ORDER

Geology Physics Building Laboratory 626

Geology Physics Building Laboratory 626

UC Project No. 10120A

Cincinnati, OH

Click Here to Order

Bracken County Judicial Center

Bracken County Judicial Center

The project is generally described as complete building construction and necessary site improvements for the New Bracken County Judicial Center.

Brooksville, Kentucky

click here to order

Boyle County Main Campus Phase 3 Renovations

Boyle County Main Campus Phase 3 Renovations

Furnishing all labor, materials, equipment and services for the Phase 3 renovations.

Danville, KY

click here to order

Greenup County Library Demolition

Greenup County Library Demolition

Demolition Package

Greenup, Kentucky

Click Here to Order

WKU-Community Bikeway Project

WKU-Community Bikeway Project

This project will complete an approximately 2-mile segment in the community-wide bicycle/pedestrian network, going from Creason Street, through the WKU Campus, along Center Street, to the Bowling Green Parks & Recreation Center. As funding allows, the project will include connecting spurs along the route, enhancing the bicycle/pedestrian network on campus and downtown. A typical cross-section for the length of the project has not been determined, i.e. whether the facility will be on-road, off-road, or a combination of the two. It will be the responsibility of the consultant to develop and evaluate alternatives in response to existing and proposed conditions along the route.

Bowling Green, KY

Click Here to Order

Creason Parking Lot Redevelopment 2011-080

Creason Parking Lot Redevelopment 2011-080

Bowling Green, Ky

Click Here to Order

Parking Structure #1 Repairs

Parking Structure #1 Repairs

This project is for repairs to Parking Structure #1 including localized concrete patching, storm-water drains, stair tower roof replacement, pressure washing, and handrail modifications.

Bowling Green, KY

Click Here to Order

Lowell Ave Area Lead Service Renewals

Lowell Ave Area Lead Service Renewals

Louisville, Ky

Click Here to Order

Highway 245 Transmission Main – Happy Hollow Road to Lotus Road

Highway 245 Transmission Main – Happy Hollow Road to Lotus Road

Louisville Water Company is requesting Bids for the installation of approximately 20,460 L.F. of 16″ ductile iron water main, eight (8) fire hydrants, and 3,200 L.F. of paved trail along Clermont Rd. (Hwy 245) between Happy Hollow Rd. and just east of Lotus Rd. for the Bullitt County Water Extension Program.

Louisville, KY

Click Here to Order

Lyndon Rain Gardens Stormwater Improvements

Lyndon Rain Gardens Stormwater Improvements

Miscellaneous stormwater improvements identified as the Lyndon Rain Gardens located at 501 Romara Place. The property is owned by the City of Lyndon. The project includes site preparation and grading, erosion prevention and sediment control, drainage pipe and structure installation, rain garden and walkway construction, a dual wet well/cistern system including pump and miscellaneous electrical, plantings, interpretive signs, site restoration and cleanup, and all other appurtenant work as specified in the contract documents. The contract documents include detailed drawings referenced as Record No. 15,550. The pre-bid meeting will be held at the project site listed above.

Louisville, KY

Click Here to Order

Kentucky Building HVAC Upgrades

Kentucky Building HVAC Upgrades

This project is an upgrade of existing HVAC and lighting systems, including replacement of ductwork, piping, units, and fixtures. Project will also require carpentry work associated with system components; some specialty work will be required as the building was constructed in the 1930’s.

Bowling Green, KY

Click Here to Order

First Street Streetscape Renovation Phase 1

First Street Streetscape Renovation Phase 1

The Morehead Streetscape First Street Project consists of the following: New sidewalks, curbs, permeable pavers, drainage, Landscaping and lighting from Bridge Street west to Anglin Avenue, a distance of approximately 0.18 miles. The City of Morehead will be performing the demolition work and the successful contractor will be required to coordinate these efforts with the city work forces.

Morehead, Kentucky

Click Here to Order

Ewing Lane Pump Station & Force Main Replacement Project

Ewing Lane Pump Station & Force Main Replacement Project

The project consists of the furnishing and installing of a new pump station, construction of gravity sewers and force main, surface restoration, and all other items shown on the plans and mentioned in the specifications for a complete project.

Jeffersonville, IN

Click Here to Order

McConnells Trace Greenway Restoration Project

McConnells Trace Greenway Restoration Project

This project consists of the stabilization and restoration of approximately 1,200 feet of a stream channel. This project also includes grading, rock structures and outfall protection.

Lexington, KY

click here to order

Contract 23 Raw Water Intake Screen Modifications

Contract 23 Raw Water Intake Screen Modifications

Contract 23 consists of removing the existing slide gates and screens from the existing raw water intake structures and installing new 24″ static screens, 36″ isolating valves, air burst system, canopy shelter, and appurtenances.

Elizabethtown, KY

Click Here to Order

Muhlenberg County High School West Campus Sports Complex BP 1

Muhlenberg County High School West Campus Sports Complex BP 1

Sports Complex

Powderly, KY

Click Here to Order

2315.0 Shively Track and Field Renovation Structural Concrete Rebid

2315.0 Shively Track and Field Renovation Structural Concrete Rebid

The University of Kentucky’s Shively Track, used by the men’s and women’s track and cross country teams, is over 30 years old and needs to be renovated and updated. this project will renovate the existing track and field facility by providing a new track and field surface, field event training areas, spectator seating, spectator amenities (concessions, restrooms, etc.) and equipment storage. The existing facility will be completely demolished and the new sports venue will be constructed to provide a first class venue for track and field events, creating a quality experience for both athletes and spectators and will be easy to access and maintain. The new track will be a none-lane synthetic surface track, competitive events, and grass infield. AN athlete only practice throw area will be developed creating a safety for adjacent spectators and warm-up of student athletes. Additionaly, a student athlete area has been developed to accomodate visiting teams. The new design and materials integrated with the adjacent baseball stadium create a synergy for dual use. A new entry plaza is being developed to create an identity for the facility and serves to upgrade th entry into the baseball stadium. Peramnet seating is provided for 3,000 spectators divided between the lower level grandstands. There are buildings to be constructed as part of the project: Field Storage, Throw Storage. Concessions/Restrooms and meet adminstration. Typical building material include concrete foundations and walls, loadbearing CMU, brick, and standing seam metal roof.

Lexington, KY

Click Here to Order

Burgin Independent Phase 2 Addition and Renovation

Burgin Independent Phase 2 Addition and Renovation

Burgin Independent Phase 2 Addition and Renovation in Burgin, Kentucky. The estimated cost is 2.2 Million dollars.

Burgin, KY

Click Here to Order

CCK-1770-11 UKGS Replace Hot Water Heaters

CCK-1770-11 UKGS Replace Hot Water Heaters

Replacement of water heater located in the 83 building of Good Samaritan Hospital. This includes labor and materials.

Lexington, KY

Click Here to Order