Petersburg Playground Purchase & Installation
Petersburg Playground Purchase & Installation
To furnish all labor, material and necessary equipment for the Petersburg Park Playground Purchase & Installation ReBid.
Louisville, Ky
Petersburg Playground Purchase & Installation
To furnish all labor, material and necessary equipment for the Petersburg Park Playground Purchase & Installation ReBid.
Louisville, Ky
Meadow Stream Pump Station & Force Main
The work consists of construction of a new sanitary sewer tri-plex pump station and force main including a concrete flow diversion chamber, 12-feet concrete wet well with sumberisble pumps, 12-feet diameter concrete valve vault, station piping and valves, electrical/control panel, 600 KW backup generator, control building and approximately 16,500 linear feet of 18″ diameter HDPE Force main. The work will generally be constructed parallel to existing pump station and force main system.
Crestwood, Ky
RFB-228-11
Construction of a 2,080 square feet pre-engineered structure and associated site work to provide storage space for HCC. The work includes Site Clearing, General and Electrical Construction. The building shell consists of ribbed metal panels over pre-engineered metal building structure, including insulated hollow metal doors and steel overhead doors. The interior consists of exposed faced insulation in walls and roof with concrete slab-on-grade floor. Electrical work consists of providing fluorescent lighting fixtures, power for receptacles and fixtures fed from relocated existing panel.
Henderson, Kentucky
Keys Ferry Road Water Main Replacement
Louisville Water Company is requesting Bids for the installation of 1,100 linear feet of 12-inch DR-18 C900 PVC water main (using traditional trench installation techniques). Also included with the project is the installation of 2 fire hydrants and the transfer, renewal, or relocation of 19 customer services.
Louisville, KY
South 13th Street Water Main Replacement
Louisville Water Company is requesting Bids for the installation of 400 linear feet of 6-inch Pressure Class 350 ductile iron water main (using traditional trench installation techniques). Also included with the project is the transfer, renewal, or relocation of 1 customer service.
Louisville, KY
Survey and Preliminary Engineering for the Urton Lane Extension Corridor #2418
A Request for Proposals for the Survey and Preliminary Engineering for the Urton Lane Extension Corridor ReBid.
Louisville, KY
Morgan County Middle School Roof Replacement
Roof Replacement
West Liberty, Kentucky
2011 Water Main Replacement Dudley and Clayton Avenues
This project consists of approximately 1,565 lineal feet of new 8″ PVC water piping and appurtenances.
Georgetown, Kentucky
HVAC Maintenance for the Libraries #2415
Price Contract for Louisville Metro to provide a portion of their requirements for HVAC Maintenance for the libraries for a twelve month period.
Louisville, KY
RFB-1-11
This project consists of the construction of a 1,500 sf. wood framed structure and
associated site work to provide additional office space for the Dept. of Fish and Wildlife
in addition to the existing storage facility. The work includes general construction,
mechanical, electrical and site work. The building consists of asphalt shingle roof with
wood truss structure and fiber cement siding over wood stud structure. The interior
consists of vct flooring over slab on grade, casework, painted gypsum board on wood
studs, wood and hollow metal doors with hollow metal frames and acoustical tiled
suspended ceiling. Plumbing to tie into existing supply and existing septic sewer.
HVAC system will consist of condensing unit and gas fired furnace tied into existing
propane tank. Electrical work consists of voice/ data cabling, lighting fixtures and
power for receptacles and equipment tied to existing panel.
Drakesboro, Kentucky
RFB-226-11
The Work consists of the following: Construction of a 4,465 square feet renovation of a pre-engineered structure with masonry walls to provide bookstore and office space for OCTC. The work includes Demolition, General, Mechanical and Electrical Construction. The building shell consists of existing cmu with masonry veneer that will be matched to infill existing over-head doors. The interior consists of selective demo work to accommodate renovation, which includes new openings in existing cmu walls and construction of new metal stud wall partitions. Interior also includes vct flooring over existing slab-on-grade, painted gypsum board, wood and hollow metal doors with hollow metal frames, aluminum-storefront, and acoustical tiled suspended ceiling. Plumbing to tie into existing sewer in building. HVAC system to consist of condensing unit and gas fired furnace, tied to exiting supply. Electrical work consists of providing fluorescent lighting fixtures, power for receptacles and equipment tied to existing panels, and conduit for voice/data cabling.
Owensboro, Kentucky
RFB-221-11
The improvements to the exterior of the facility will consist of new ADA ramp, new stairs, new sidewalks, entry façade canopy, landscaping, new exterior stone masonry, new cap stone on exterior walls and roof repairs for new mechanical equipment.
The majority of the improvements are to the interior of the facility and consist of lobby upgrades, terrazzo flooring, ceramic tile in dorm restrooms, casework in dorm rooms, aluminum exterior window system, exterior storefront, and V.C.T. flooring in dorm rooms. All painting is to be by owner.
The fire protection is revised and extended to match the new work with a dry pipe system added for the unheated spaces. New plumbing fixtures are installed throughout the facility including new water closets, sinks, shower valves and drains. The most of the recently renovated fan-coil units remain with new spaces having new HVAC installed. A new back up steam boiler and heat exchanger are included. New outside air and exhaust are being provided by a new unit located on the lower level. A new electrical switch board is installed to replace the outdated existing board. The fire alarm system is being replaced and the residence rooms receive additional power, voice, data and TV services. Wireless communication is added throughout the facility.
Morehead, Kentucky
RFB-224-11
Light fixture replacement at the North and South bound Rest Stop buildings in Scott County (District 7) on I-75; mile point 127.050. The work includes the replacement of exterior and interior lighting which requires the removal, disposal and abandoning of some existing electrical items.
Georgetown, Kentucky
Hindman Pump Station Improvements
The work will consist of the installation of a new booster pumping station, telemetry, electrical service, etc. The pump will be connected to the existing water line located along Route 160 in the Brinkley community of Knott County. The Contractor shall furnish all materials, equipment and labor necessary to complete the installation of the pump station, appurtenances and reclamation. Time of completion of the project will be 120 Calender days.
Hindman, Kentucky
Tyner Wastewater Wetlands Project
The scope of work includes the removal of the existing sewage package treatment plant after constructing three (3) new earthen wastewater wetland cells and the and the installation of a new wastewater treatment facility and associated piping.
McKee, Kentucky
WKU Price Contract – Masonry
WKU PDC -2011-087 : You are invited to bid on supplying all equipment, materials. labor, permits, etc. for establishing a price contract for Masonry work on the campus of Westen Kentucky University.
Bowling Green, Ky
Evarts Elementary School Roof Replacement
Roof Replacement.
Harlan, Kentucky
Sanitary Sewer Rehabilitation
This project is consisting of the construction and/or furnishing of various items as listed in the Bid Schedule beginning on P-7 part III, form of proposal, of this document, the various sanitary sewer system rehabilitation work in Lexington-Fayette County, Kentucky at work sites to be determined.
Lexington, KY
Pulaski County High School Technology Upgrades
The project scope includes removal of all existing Voice/Data Cabling in the existing Pulaski County High School. Existing wall cabinets and floor racks are to be removed and turned over to the owner. New Cat6 cabling infrasturcture will be proviede through out the facility, providing new racks and wall cabinets, along with wire management at each MDF/IDF location, and cable traydistribution through out the corridors. The classrooms shall be fitted up to accept interactive whiteboard system, as well a providing of a A/V box at teachers location.
Somerset, KY
Salvation Army Corps Community Center
Community Center
Georgetown, Kentucky
CALL 315 CONTRACT ID 112246
BOURBON COUNTY
CPTL 009 543F: BOURBON COUNTY SALT STORAGE STRUCTURE FOUNDATION BOURBON COUNTY SALT
STORAGE STRUCTURE FOUNDATION. MAINTENANCE.
CALL 314 CONTRACT ID 112244
BREATHITT COUNTY
CPTL 013 368N: BREATHITT COUNTY SALT STORAGE STRUCTURE FOUNDATION BREATHITT COUNTY
SALT STORAGE STRUCTURE FOUNDATION. MAINTENANCE.
| CALL 313 CONTRACT ID 112243 MERCER COUNTY CPTL 040 560E: GARRARD COUNTY SALT STORAGE STRUCTURE FOUNDATION GARRARD COUNTY SALT STORAGE STRUCTURE FOUNDATION. MAINTENANCE. |
|||
CALL 311 CONTRACT ID 112239
MERCER COUNTY
CPTL 084 251I: MERCER COUNTY SALT STORAGE STRUCTURE FOUNDATION MERCER COUNTY SALT
STORAGE STRUCTURE FOUNDATION. MAINTENANCE.