Knox Co Utility Commission Water System SCADA, Radio Telemetry Monitor and Control System
Knox Co Utility Commission Water System SCADA, Radio Telemetry Monitor and Control System
This contract consists of a system control computer with appropriate peripherals, base radio modem and remote site terminal units for four booster pump stations, one high service pump, one solenoid valve station, sex water storage tanks and one master meter.
Black Mountain Utility District Water System SCADA, Radio Telemetry Monitor and Control System
Black Mountain Utility District Water System SCADA, Radio Telemetry Monitor and Control System
This contract consists of a system control computer with appropriate peripherals, base radio modem and remote site terminal units for four booster pump stations, one high service pump, one solenoid valve station, six water storage tanks and one master meter.
DB Services for LMPD Firearms Training Center Phase II Renovation/Adaptive Reuse
DB Services for LMPD Firearms Training Center Phase II Renovation/Adaptive Reuse
A Request for Proposals to furnish all labor, material and necessary equipment for Design Build Services for the LMPD Firearms Traing Center, Phase II Renovation/Adaptive Reuse
RFB-224-12 Chiller Replacement Transportation – Central Utilities Plant
RFB-224-12
Chiller Replacement for Central Utility Plant at the Transportation Cabinet Central Utility Plant Building in Frankfort, KY. The project includes the demolition of two existing 500 Ton chillers (CH-3 and CH-4), the associated pumps, piping, and starters; installation of new Owner Furnished/Contractor Installed equipment (1200 Ton Centrifugal Chiller, starter, associated pump, and variable speed drive). Controls for the replacement chiller and associated equipment are to be Owner furnished including controllers, control devices, and sensors as well as wiring, programming, and start-up
RFB-225-12
The Base Bid consists of removing the existing housing unit security control system, intercom and lighting control system and installing a new security control system, intercom, and lighting control system for housing unit number two (consisting of dorms three and four).
New Traffic Signal at Spring Street & Fairview Drive
New Traffic Signal at Spring Street & Fairview Drive
The scope of work includes the addition of a new traffic signal at the intersection of Spring Street, Fairview Drive and the new drive entrance to the Kruchers facility.
RFB-215-12 Upgrade Welding Shop Exhaust System – Rowan Campus
RFB-215-12
The project consists of welding shop exhaust and ventilation system replacement and
upgrade. The HVAC scope includes equipment and ductwork demolition, new welding
exhaust ductwork and hoods, utility set exhaust fans and new gas fired make up air
unit. Electrical includes re-feed of MCC and power distribution to new HVAC
equipment. Additional work includes structural steel modifications for rooftop
equipment support and metal building roof and wall penetrations.
2335.0 Electronic Health Records Infrastructure Upgrade
2335.0 Electronic Health Records Infrastructure Upgrade
The project includes electrical and telecommunication infrastructure for the Ambulatory Electronic Health Records implementation in three clinics in the KY Clinic, the Pain Clinic at Good Samaritan Hospital, and the OB-GYN Clinic at the Good Samaritan Medical Office Building. The scope also includes a closed loop chilled water HVAC system for the communication rooms in the KY Clinic and Warren Wright buildings.
The furnishing of all labor, materials, supplies, tools, equipment, services, etc., necessary for the construction of Marion County High School Renovations as set forth in the specifications and as shown on the drawings prepared by Ross Tarrant Architects, Inc.
Whitley Co Water District SCADA, Radio Telemetry Monitor and Control System
Whitley Co Water District SCADA, Radio Telemetry Monitor and Control System
This contract consists of a system control computer with appropriate peripherals, base radio modem and remote site terminal units for two booster pump stations and two water storage tanks.
Cawood Water District Water System SCADA, Radio Telemtry Monitor and Control System
Cawood Water District Water System SCADA, Radio Telemtry Monitor and Control System
This contract consists of a system control computer with appropriate peripherals, base radio modem and remote site terminal units for four booster pump stations, one high service pump, one solendoi valve station, six water storage tanks and one master meter.
Cleaning/Sanitizing HVAC System — Academic Complex
Cleaning/Sanitizing HVAC System — Academic Complex
You are invited to bid on supplying all equipment, materials, labor, permits, etc. for the Cleaning/Sanitizing HVAC System at the Academic Complex on the campus of Western Kentucky University.
Phillips Lane and Preston Highway Water Main Replacement Project
Phillips Lane and Preston Highway Water Main Replacement Project
Louisville Water Company is requesting Bids for the installation of 655 +/- linear feet of 16-inch Pressure Class 350 ductile iron water main (restrained and non-restrained using traditional trench installation techniques); installation of 500 +/- linear feet of 12-inch Pressure Class 350 ductile iron water main (restrained and non-restrained using traditional trench installation techniques) and appurtenances and to restore the site. Also included with the project is the transfer, renewal, or relocation of 15 customer services.
RFB-218-12 Campus Recreation Center – Evans Branch Culvert Extenstion
RFB-218-12
The project includes necessary excavation and backfilling to construct approximately 285 linear feet of 72-inch aluminized corrugated steel pipe in Evans Branch. Associated with this construction includes new concrete and unit paving plaza, concrete sidewalks, curb and gutter, asphalt paving, and landscaping. Beyond the culvert extension, a retaining wall, utilizing large block segmental wall units, is to be constructed on each side of Evans Branch and will have metal railing attached along the entire length of wall.