Papacina Steel and Metals Package
Papacina Steel and Metals Package
Steel and Metals Package
Lexington, KY
Papacina Steel and Metals Package
Steel and Metals Package
Lexington, KY
RFB-188-12
The Division of Abandoned Mine Lands wishes to receive bids to perform reclamation work on approximately 26 acres of mine land in Ohio County, Kentucky. The work will consist of earthwork, gradework, and revegetation of 3 bond forfeiture permit(s). For continued project description see Special Conditions.
Ohio County, Kentucky
Harold Sewer Project Contract 2 Collection System
A pressure sewer system incluiding a possible 24,340 LF of HDPE collector sewers, 41,030 LF of HDPE service line, 140 simplex residential grinder pump stations, 11 duplex residential grinder pumping stations, 1 quadplex grinder pumping station with odor control system, and 1 conventional submersible pump station with odor control system.
Southern Water and Sewer District, KY
Harold Sewer Project Contract 1 Wastewater Treatment Plant
A 100,000 GPD pre-cast concrete extended aeration treatment plant
Southern Water and Sewer District, KY
Overlook Acres Booster Pump Station
Louisville Water Company is requesting Bids for furnish and install (1) underground packaged booster pump station complete with associated piping, electrical, and site work.
Louisville, KY
Morgantown Housing Authority REBID
HVAC Upgrades
Morgantown, KY
City of Frankfort Unit Price Concrete
General concrete sidewalk and curb maintenance and new sidwalk and curb construction work to be performed for the City of Frankfort on an as needed, cafeteria style project scope with bid unit prices to remain in affect for a period of one year from the stated bid opening date.
Frankfort, KY
Papacina Project Concrete Package
Lexington, KY
Crossroads Elementary Concrete Sidewalk Replacement
Concrete Sidewalk Replacement
Mt Washington, KY
Hayes Lewis Elementary Sewage Treatment Plant Bid Package 2
Estimate $120,000
Hyden, KY
Hyden-Leslie Co Water District Contract 12 Waterline Extensions
Contract No 12 – Waterline Extensions
a.) 4″ PVC Waterline 20,000 LF
b.) 3/4″ PVC Waterline 1,000 LF
c.) Above Ground Booster Station 1 LS
Leslie Co, KY
Breathitt County Water District Contract 2 Duck Hollow, Copeland and River Caney Ground Storage Tank
Contract 2 Ground Storage Tank
Jackson, KY
Breathitt County Water District Contract 1 Duck Hollow, Copeland and River Caney Waterline Extension
Contract 1 Waterlines
Breathitt Co, KY
RFB-186-12
This project will include the installation of foundation in an existing asphalt parking lot for a pre-engineered canopy type structure. This structure will be surrounded by chainlike security fence with swinging gates. Installation of new electrical panel service with underground connection to new exterior panel with recreational vehicle connections. Security lighting will be installed with alternate for security camera. Metal roof with gutter and downspout system will be installed on the new canopy structure.
Frankfort, Kentucky
Thomas Clark Building Fire Escape Replacement
Demo and remove existing 3-story exterior stair case including lead-based paint containment/removal. Demo and remove part of existing concrete basement stairs as shown on plans to facilitate construction of new footer and stairs. Construct new footers and concrete basement stairs as shown on engineer’s plans. Construct new galvanized exterior fire escape/stairs as shown on plans.
Lexington, KY
Wilmore Streetscape Improvement and Pedestrian Mall Project
The City of Wilmore Streetscape Improvement and Pedestrian Mall Project includes approximately 1085 linear feet of full-death grade, drain and surfacing roadway reconstruction of East College Street and North Walnut Street including a 212 linear feel 7’ x 3’ RCBC. The current one-way portion of Gillispie Street between North Walnut and Lexington Avenue is to be closed to vehicular traffic and reconstructed into a Pedestrian Mall (approximately 340 linear feet). The two-way portion of Gillispie Street within the project area will be resurfaced (approximately 1245 linear feet). Lexington Avenue will be resurfaced (approximately 1245 linear feet). Full-depth construction turnouts on Lexington Avenue will be constructed at the Asbury Theological Seminary Library and Gillispie Pedestrian Mall entrance. Grade, drain and surfacing for new parking lots will be constructed on both sides of Walnut Street at the Gillispie and Walnut intersection and at the Walnut and College intersection. Grade, drain, and surfacing for an 8’ wide multi-use pathway will be constructed between East College Street and Morrison Street (approximately 365 linear feet). Stream reconstruction (approximately 280 linear feet) in included in the project with grade, drain and surfacing for an 8’ multi-use pathway along the stream (approximately 305 linear feet). New sidewalks, lighting, signage, striping, and landscaping will be constructed and installed within the project area. New city water, sewer, and conduit for utilities will be constructed within the project area.
Wilmore, KY
Westside Drive Main Replacement Project
Louisville Water Company is requesting Bids for the installation of approximately 1665 lineal feet of 8-inch PVC water main, 120 lineal feet of 8-inch DWP water main, and 50 lineal feet of 16-inch steel casing (open) cut). Also included with the project is the installation of 3 fire hydrants, the installation, transfer, renewal, or relocation of 8 customer services.
Louisville, KY
Transylvania Beach Sanitary Sewer, Force Main, Pump Station, and Drainage Improvements
Louisville Water Company (LWC) is requesting bids for the Supply and Installation of approximately 3,750 LF of 12-inch PVC sewer; 270 LF of 1 1/2-inch, 2,540 LF of 2 1/2 -inch and 2,040 LF of 3-inch PVC force main; 435 LF of 4-inch PVC service connections; 28 tees; 15 service stacks; a submersible pump station and control panel; a grinder pump station with connection to a Louisville Water Company control panel; removal and replacement of approximately 2,100 LF of chain link fencing; and miscellaneous appurtances thereto all as shown on the Drawings and Specifications. The drainage portion of the project consists of clearing and grubbing brush and trees and clean up of Louisville Water Company property, construction of approximately 2,550 feet of drainage swale including contouring ground to drain to the swale; seeding and planting; furnishing and installing approximately 180 LF of 24-inch RCP storm sewer and two headwalls; and miscellaneous appurtenances thereto all as shown on the Drawings and Specifications.
Louisville, KY
Contract 2 Sanitary Sewer System Manhole Rehabilitation
The rehabilitation and lining of existing sanitary sewer manholes including all related appurtenances.
Frenchburg, KY
University of Kentucky Renovation of the AG Motor Pool
The interior and exterior renovation of the AG Motor Pool, along with mechanical and electrical needs.
Lexington, KY
DUC Renovation Bid Pkg 1 Site Utility Relocation
You are invited to bid on supplying all equipment, materials, labor, permits, etc for the Downing University Center Renovation: Bid Pkg #1 Site Utility Relocation on the campus of Western Kentucky University. Mr. Dan Chaney, Project Manager shall be in charge of this project. Please contact Warren Whitfield, Manager of Construction Purchasing by e-mail at warren.whitfield@wku.edu for any information or clarifications you may need about the bid. As soon as an answer is available it will be e-mailed back to you. If it affects the bid specifications, a written Advice of Change will be issued to all bidders.
Bowling Green, KY
RFB-184-12
The work consists of the following: Supply and install a new emergency diesel generator and concrete pad on the exterior of the building, associated emergency distribution panel and transfer switches. Install new feed switches in the existing switchgear. Rework the existing elevator power feed into the emergency system. Install new branch panels and associated feeds to designated areas of the facility. Remove existing emergency lighting inverter system. Rework existing branch circuit feeds from the emergency lighting inverter system and selected receptacle circuits into the new emergency panels.
Louisville, Kentucky