Provide all labor, materials, tools, construction supplies and apparatus in construction needed to complete the proposed roof replacement desired by Potter Children’s Home. It is the intent that all methods and material should be complete in every aspect. All material and construction methods should comply with all OSHA codes and acceptable standard practices. The work to be done under this scope shall include, but not necessarily be limited to the installation of a new Conventional Steel/LGM Truss and Standing Seam roof system.
Existing conditions include 4” concrete roof deck, corrugated metal and concrete roof deck, 1”-6” insulation, masonry walls, and built-up/membrane roof system.
Rehabilitation of portions of Taxiway A1 and Taxiway A7. The scope of work generally includes demolition of asphalt pavement; placement of asphalt pavement section; construction of storm drainage; sodding and placement of pavement markings.
Lexington, KY
Click Here to View
Webster Co Sewer System Improvements Phase 2 City of Dixon
Webster Co Sewer System Improvements Phase 2 City of Dixon
The addition and installation of an odor/corrosion control system to the primary discharge force main, and an in-line comminutor in the gravity sewer portion of the City of Dixon sanitary sewer system.
Maintenance and Repair of HVAC Systems at Islands and Glacier Run Facilities
Maintenance and Repair of HVAC Systems at Islands and Glacier Run Facilities
A price contract for a portion of Louisville Metro Government’s need for Maintenace &
Repair of HVAC Systems at Islands & Glacier Run Facilities for a period of twelve (12)
months.
RFB-197-12
This work at the Commonwealth Office of Technology Building in Frankfort, Kentucky
consists of installing sixteen (16) owner furnished Computer Room Air Conditioning
Units along with miscellaneous piping improvements to the Chilled Water System to
the building. The building will remain in use at all times during construction and
installation will be coordinated to avoid building shut downs.
Louisville Water Company is requesting Bids for the renewal of lead services in the Oak Street Area. Design information indicates a total of 94 customer service renewals, 3 customer service discontinues and 19 meter exchanges.
Louisville Water Company is requesting Bids for This project consists of the renewal of lead services in the Mary Street Area. Design information indicates a total of 115 customer service renewals, 7 customer service discontinues, and 19 meter exchanges.
Distribution System Repairs & Capitol Improvements
Distribution System Repairs & Capitol Improvements
Louisville Water Company is requesting Bids for unit prices to furnish all necessary equipment, tools, and labor in time of need to undertake improvements, repairs, maintenance and necessary construction to LWC distribution facilities. Distribution facilities shall include but not be limited to distribution mains, domestic services, fire services and fire hydrants. This unit price Master Agreement will be for two (2) years.
DUC Renovation: BP 4 Pre-Engineered Metal Building
DUC Renovation: BP 4 Pre-Engineered Metal Building
You are invited to bid on supplyling all equipment, materials, labor, permits, etc. for the Downing University Center Renovation: Bid Package #4 Pre-engineered Metal Building on the campus of Western Kentucky University.
The construction of a new 15.8 MGD submersible pump station with cast-in-place divided wet well, screening, odor control, block building, valve vault, related piping, site work, paving, electrical, controls, HVAC and plumbing.
The scope of work includes the installation of new concrete sidewalks, ADA ramps, cast in place concrete walls with form liner finish, cast in place concrete seat walls, header curb, integral curb and walk, stepped integral curb and walk, concrete aprons, landscaping, guardrails and handrails, tree grates, concrete stairs, yard inlets, 4″ storm piping, unit paving, bituminous pavement patching, and parking striping.
Haggin Field Honors Housing RFP 1 MEP Design/Build
Haggin Field Honors Housing RFP 1 MEP Design/Build
Haggin Field Honors Housing RFP 1 MEP Design/Build
Haggin Field Honors ousing is a new 600 bed dorm located on University of Kentucky’s campus next to the existing Haggin Hall. The new dorm will be approximately 160,000 sf comprised of 2 buildings that are 4 stories. The south building will have a wing that will consist of approximately 7800 sf basement. It will be a wood framed structure with floor and roof trusses. The bedrooms will be in a suite style with 4 beds sharing a common bath. The exterior facade consists of brick and aluminum storefronts. Site improvements include new site utilities and a plaza between the buildings.
Request for Proposal 1 is engaging MEP contractors to design and build Haggin Field Honors Housing based on the 50% bridging documents provided. The awarded contractors will be the designer of record. The MEP contractors will work with Sherman Carter Barnhart to complete the design, procure, build , and commission the MEP systems for the Project.
WCDB-A Fire Protection
WCDB-B Mechanical
WCDB-C Electrical