Housing Authority of Hodgenville

Housing Authority of Hodgenville

The project consists of Installation of New Entry Doors and New Storm Doors

Hodgenville, KY

Click Here to View

Contract IV Automated Meter Reading System Farmdale Water District

Contract IV Automated Meter Reading System Farmdale Water District

Furnish, install and place into operation a complete Automated Meter Reading System.

Frankfort, KY

click here to order

Contract 2 – 500,000 Gallon Elevated Water Tank Farmdale Water District

Contract 2 – 500,000 Gallon Elevated Water Tank Farmdale Water District

A 500,000 gallon elevated water storage tank including tank, tank foundation, site prep, excavation, valve vault, access road, demolition and all appurtenances as shown.
Demolition and removal of existing 155,000 gallon standpipe, including foundation.

Frankfort, KY

click here to order

Contract 3 – SCADA System Farmdale Water District

Contract 3 – SCADA System Farmdale Water District

Furnish, install and place into operation a complete Supervisory Control and Data Aquisition (SCADA) System

Frankfort, KY

click here to order

Contract 1 Water System Improvements Farmdale Water District

Contract 1 Water System Improvements Farmdale Water District

Contract 1 Water System Improvements Farmdale Water District

Water Line Upgrade & Pump Station
Approximately 20,000 LF of 12-inch water line upgrade and appurtenances
One (1) Prefabricated Booster Pump Station

Frankfort, KY

Click Here to Order

Waterline Improvement Project Phase 3 City of Jenkins

Waterline Improvement Project Phase 3 City of Jenkins

Waterline Improvement Project Phase 3 City of Jenkins

Installation of 6-inch, 4-inch and 2-inch waterlines and appurtenances to replace the existing distribution system in Lakeside area of Jenkins

Jenkins KY

Click here to order

DUC Renovation: BP 5 Temporary Dining Foundations & Fit Up

DUC Renovation: BP 5 Temporary Dining Foundations & Fit Up

WKU will be constructing a temporary dining facility on the South Lawn of Campus. The Pre-engineered metal building will be provided and erected by others. This bid package includes the following for the facility: Site grading, concrete foundations and slabs, utilites to the site, interior wall construction and finishes, and final connections of owner-furnished equipment.

Bowling Green, KY

Click Here to Order

Ninth Street Waterline Replacement London KY

Ninth Street Waterline Replacement London KY

The scope of work includes the installation of 2,785 feetof 8 inch DI waterline, and related appurtenances.

London KY

Click Here to order

RFB-204-12 Sprinkler System & Building Renovations

RFB-204-12
The work consists of fire suppression on all floors of buildings 31, 32 and 33;
construction of two utility towers and upgrade the electrical service. There are three
add alternates.

Hopkinsville, Kentucky

Click here to order

City of St. Matthews: Brown Park Stream Restoration Project

City of St. Matthews: Brown Park Stream Restoration Project

The project provides for all labor, materials, and equipment necessary to provide in stream modifications and bank grading along approximately 1,600 feet of Middle Fork Beargrass Creek, remove approximately 2125 SY of existing asphalt path and reconstruct approximately 2425 SY of proposed concrete path, and other appurtenant work within Brown Park.

St. Matthews, KY

Click Here to Order

Restoration of Good Samaritan Parking Structure

Restoration of Good Samaritan Parking Structure

Good Samaritan Hospital Parking Structure is constructed of Precast and Pre-stressed Concrete Columns, Inverted Tees, Double Tees and Spandrels. Topping is field. The four floor structure holds about 330 parking spaces and spaces and was constructed around 1982.

Lexington, KY

Click Here to View

Meadowthorpe Elementary School Addition and Renovation

Meadowthorpe Elementary School Addition and Renovation

The work includes the renovation of approximately 39,020 SF and the addition of 30,430 SF to the existing building at Meadowthorpe Elementary School, originally built in 1959 with building additions in 1962, 1974, 1978 and 1987. Work includes, but is not limited to, selective demolition, removal and replacement of mechanical systems including installation of variable refrigerant volume systems, replacement of existing electrical systems, fire protection, fire alarm systems, interior finishes (walls, ceilings, floors and base), doors, frames, door hardware, reroofing, site improvements and paving, renovation of the existing cafeteria for administrative offices and the addition of 30×430 SF containing media center, cafeteria and kitchen, gym platform, classrooms, entry lobby, vestibules and supprot spaces. The work effort will be executed in two phases beginning in June 2012 and ending November 2013 and the school will be occupied during the course of the work.

Lexington, KY

Click Here to View

Old Frankfort Dry Stone Wall

Old Frankfort Dry Stone Wall

A dry stone fence along a portion of Old Frankfort Pike in Lexington, KY which is designed to mimic an existing dry stone dence found on the property opposite of Old Frankfort Pike. Work items shall include the construction of approximately 558 linear feet of dry stone fence, construction staking, demolition of existing retaining wall portion, earthwork, sediment and erosion control measures, and site restoration.

Lexington, KY

Click Here to View

Boyle Co Courthouse Renovation

Boyle Co Courthouse Renovation

Project consists of the new family courtroom, clerk offices and storage including necessary demolition, lighting, HVAC, and plumbing upgrades.

Danville, KY

Click Here to View

Valvoline Automotive Appearance Product Testing Application and Training Center

Valvoline Automotive Appearance Product Testing Application and Training Center

251 Yorkshire Blvd
Lexington, KY

Click Here to View

Prestonsburg High School Gymnasium Renovation

Prestonsburg High School Gymnasium Renovation

Furnishing all labor, materials, supplies, tools, services etc., necessary for: Prestonsburg High School Gymnasium Renovation

Prestonsburg, KY

Click Here to View

Floyd Co Athletic Fields

Floyd Co Athletic Fields

Betsy Layne High School and Prestonsburg HS Athletic Fields

Prestonsburg, KY

Click Here to View

Allen Central HS and Duff Elementary Re-Roof

Allen Central HS and Duff Elementary Re-Roof

Prestonsburg, KY

Click Here to View

Auburn Elementary School Partial Roof Replacement

Auburn Elementary School Partial Roof Replacement

This project primarily consists of the removal and replacement of approximately 48,000 SF of roofing material at Auburn Elementary in Logan Co KY. The successfully contractor shall remove the existing adhered EPDM systems and applicable insulation and board system down to the existing corresponding metal and/or cementitious-wood fiberboard decking systems. Contractor shall also prepare and adjust as needed existing vents, curbs, gas liners and other roof top items to receive the new insulation, recovery board, and roofing systems. Contractor shall also provide and install new thermoplastic membrane roofing and polyisocyanurate insulating systems that will provide a 20-year no-dollar limit roof warranty.

Auburn, KY

Click Here to View

Buffalo Wild Wings — Cookeville, TN

Buffalo Wild Wings — Cookeville, TN

The scope of work consists of a full restaurant ground up build. All mechanical trades will be required as well as glass/glazing, drywall/metal stud, rough carpentry, finish carpentry, tile, acoustic ceiling, painting, and roofing.

Cookeville, TN

Click Here to Order

WKU PDC-2012-039 Clay & Metal Arts Building

WKU PDC-2012-039 Clay & Metal Arts Building

You are invited to bid on supplying all equipment, materials, labor, permits, etc. to build the Clan & Metal Arts Building on the Western Kentucky University Farm.

Bowling Green, KY

Click Here to Order

Woodford Co Schools Northside Elementary and Middle School Pre-Fabricated Aluminum Canopies

Woodford Co Schools Northside Elementary and Middle School Pre-Fabricated Aluminum Canopies

Versailles, KY

Click Here to View

Carney Retail Center Berea, Phase II

Carney Retail Center Berea, Phase II

This project consists of site work, the construction of a one story retail center shell (11,900 sq ft) and the build out of 8,000 sq ft. The retail cetner shell work specifically includes structural steel framing, concrete foundations & slab-on-grade, masonry, aluminum storefront and glazing, and single-ply roofing. The site work includes site work includes but is not limited to: erosion control, landscaping, demolition, concrete curbs, asphalt paving and stripping, concrete walks and pads, site utilities, (gas, electric, water, and sewer) grading, storm drainage, and sanitary sewers

Berea, KY

Click Here to View

Meade Co Bus Garage Renovation

Meade Co Bus Garage Renovation

Brandenburg, Ky

Click Here to Order

Meade Co High School Renovation Phase II

Meade Co High School Renovation Phase II

Brandenburg, KY

Click Here to Order