Louisville Water Company is requesting bids the installation of 1,560 linear feet of 12-inch PVC water main and 50 linear feet of 12-inch DPW water main along Reamers Road between Old Floydsburg Road and Fairfields Meadow Drive. Also included with the project is the installation of 2 fire hydrants, the transfer / renewal of 15 customer services and 1 service discontinue. See contract documents for additional details.
Description and location of Project: The project will include the installation of approximately 1,789 linear feet of 12-inch sewer and 2,438 linear feet of 8-inch sewer. This project also includes installing 20 sanitary manholes, the decommissioning of two sanitary pump stations, pavement removal, erosion control, stream bank restoration, and appurtenant work. The project is generally located north of the intersection of Beulah Church Road and East Mansilck Road.
National Guard Pump Station Replacement and Gravity Sewer Project
National Guard Pump Station Replacement and Gravity Sewer Project
The work to be bid upon is described as follows:
2,700 LF of 8″ Gravity Sewer
1,400 LF of 10″ Gravity Sewer
1,300 LF of 12″ Gravity Sewer
2,100 LF of 15″ Gravity Sewer
4,900 LF of 10″ Force Main
34 New Manholes
800 GPM Pump Station
1. Replacement of roofs, install EFIS, stone and construct front and rear porches.
Work includes providing all items, articles, materials, operations or methods herein listed, mentioned or scheduled on the Project Documents and/or herein, including all labor, materials, equipment, services and incidentals necessary for their completion.
RFB-228-12 Storm Water & Site Improvements I-75 Rest Areas
RFB-228-12
The project consists of furnishing all materials, equipment, labor and incidentals
necessary to; route drainage from roof gutters to the storm drainage system as
indicated on the plans; Lower drop inlet frames and grates to insure positive drainage
from sidewalks into the storm drainage system; Repair and or replace roof gutters in
locations shown on the plans as required.
RFB-232-12 HVAC Renovation Phase II-Science Building
RFB-232-12
Replace unit ventilators with VAV roof top unit. Bring all remaining old controls up to
new. Roof reinforcemtent and miscellaneous architectural finishes work. For continued
project description see Special Conditions.
A single story wood framed, brick veneered office building. The foundation shall be concrete footings and stem wall with engineered fill for a concrete floor slab. The basic structure is 2×4 exterior bearing walls sheathed and insulated. Finished with drywall and painted.
Repairs and preventive maintenance to five of UK’s existing parking structures. Repair work is generally catagorized as follows:
Repairs to damaged portions of the post-tensioned system, including overhead soffit repairs, surface repairs to slabs and beams, tendon repairs and localized beam repairs (all parking structures)
Cleaning and painting of concrete and steel surfaces (PS1, PS2)
Surface repairs to concrete columbs (PS1)
Surface repairs to concrete walls (PS1, PS2)
Drainage system component replacement and repairs (PS1)
Repairs to the existing waterproofing membrane (PS1, PS6)
Recoating of existing waterproofing membrane areas, primarily in drive aisles (all parking structures)
Slab crack repairs (PS1)
Restriping of selected parking surfaces (all parking structures)
installation of horizontol cove sealants (PS5)
Localized expansion joint repairs (PS1, PS5, PS6)
Application of penetrating sealer (PS2, PS5)
Repairs to facade (non-concrete repairs) (PS2)
Replacement of failed joint sealants (PS6, PS7)
Runway and Safety Area Extension and Slope Stabilization for the West Liberty Airport
Runway and Safety Area Extension and Slope Stabilization for the West Liberty Airport
To furnishing all labor, materials and equipment and performing all work necessary to relocate Crestview Drive, extended runway 7-25 140′, construct a 240′ runway safety area and slope stabilization.
This green infrastructure project involves the construction of several articulating concrete block permeable pavement strips within the neighborhood of Butchertown. This project includes connections of these paver strips to existing drainage structures and the drilling of shafts to promote infiltration. Tree boxes are proposed for both sides of Story Avenue near the existing Interstate 64 ramp immediately west of the existing freeway.
Owen Co Old Middle School
1960 Highway 22 East
Owenton, KY
The project scope includes a new field house for the Owen Co Board of Education to house a future weight room, locker rooms, and restroom. Construction will include a pre-engineered metal building with a concrete foundation system.
GMWSS Wastewater Treatment Plant #2 Painting and Concrete Repair
GMWSS Wastewater Treatment Plant #2 Painting and Concrete Repair
The program of work for which bids are to be submitted consists of the painting of wastewater equipment in various treatment units, miscellaneous concrete repair work, and removal and replacement of various equipment.
The scope of work includes earthwork, dam and spillway construction, erosion control, the installation of a box culvert, storm sewers and appurtenances.
The site is located behind Clark Moore Middle School, north of Savannah Drive, and South of Bay Colony Subdivision.