Harlan Housing Authority Waste Line Replacement
Harlan Housing Authority Waste Line Replacement
Harlan, KY
Harlan Housing Authority Waste Line Replacement
Harlan, KY
RFB-215-12
The project consists of welding shop exhaust and ventilation system replacement and
upgrade. The HVAC scope includes equipment and ductwork demolition, new welding
exhaust ductwork and hoods, utility set exhaust fans and new gas fired make up air
unit. Electrical includes re-feed of MCC and power distribution to new HVAC
equipment. Additional work includes structural steel modifications for rooftop
equipment support and metal building roof and wall penetrations.
Morehead, Kentucky
Calvary Elementary Roof Replacement
The project scope includes removal and replacement of the existing EPDM ballasted roof system with a new modified bituminous membrane roof.
Lebanon, KY
Click Here to View
Prestonsburg Medical Specialties for KDMC
Prestonsburg Medical Specialties for Kings Daughters Medical Center
Prestonsburg, KY
2335.0 Electronic Health Records Infrastructure Upgrade
The project includes electrical and telecommunication infrastructure for the Ambulatory Electronic Health Records implementation in three clinics in the KY Clinic, the Pain Clinic at Good Samaritan Hospital, and the OB-GYN Clinic at the Good Samaritan Medical Office Building. The scope also includes a closed loop chilled water HVAC system for the communication rooms in the KY Clinic and Warren Wright buildings.
Lexington, KY
Marion County High School Renovations
The furnishing of all labor, materials, supplies, tools, equipment, services, etc., necessary for the construction of Marion County High School Renovations as set forth in the specifications and as shown on the drawings prepared by Ross Tarrant Architects, Inc.
Lebanon, KY
Contract No 13A – School Transmission Main – WB Muncy Elementary
a.) 2000 LF of 8″ C-900 DR 14 PVC Water Line
b.) 2000 LF of 6″ C-900 DR 14 PVC Water Line
Hyden, KY
Contract No 13 – Water Storage Tanks – WB Muncy Elementary
50,000 Gal Ground Storage Tank – 1 LS
Hyden, KY
Whitley Co Water District SCADA, Radio Telemetry Monitor and Control System
This contract consists of a system control computer with appropriate peripherals, base radio modem and remote site terminal units for two booster pump stations and two water storage tanks.
Whitley Co, KY
Cawood Water District Water System SCADA, Radio Telemtry Monitor and Control System
This contract consists of a system control computer with appropriate peripherals, base radio modem and remote site terminal units for four booster pump stations, one high service pump, one solendoi valve station, six water storage tanks and one master meter.
Cawood, KY
Cleaning/Sanitizing HVAC System — Academic Complex
You are invited to bid on supplying all equipment, materials, labor, permits, etc. for the Cleaning/Sanitizing HVAC System at the Academic Complex on the campus of Western Kentucky University.
Bowling Green, KY
Phillips Lane and Preston Highway Water Main Replacement Project
Louisville Water Company is requesting Bids for the installation of 655 +/- linear feet of 16-inch Pressure Class 350 ductile iron water main (restrained and non-restrained using traditional trench installation techniques); installation of 500 +/- linear feet of 12-inch Pressure Class 350 ductile iron water main (restrained and non-restrained using traditional trench installation techniques) and appurtenances and to restore the site. Also included with the project is the transfer, renewal, or relocation of 15 customer services.
Louisville, KY
RFB-218-12
The project includes necessary excavation and backfilling to construct approximately 285 linear feet of 72-inch aluminized corrugated steel pipe in Evans Branch. Associated with this construction includes new concrete and unit paving plaza, concrete sidewalks, curb and gutter, asphalt paving, and landscaping. Beyond the culvert extension, a retaining wall, utilizing large block segmental wall units, is to be constructed on each side of Evans Branch and will have metal railing attached along the entire length of wall.
Morehead, Kentucky
UKGS Fireproof Unprotected Steel
This project consists of Fireproofing unprotected steel structure in the 54 building at UK Good Samatitan Hospital on the Ground, 1st and 2nd Floors
Lexington, KY
Prestonsburg Medical Specialties for KDMC
Prestonsburg, KY
Lewis County Middle School and High School Roof Replacement
Roof Replacement
96 Plummer Lane
Vanceburg, KY 41179
Vanceburg, KY
Replacement of carpet in the Jerry E. Abramson Terminal at the airside rotunda.
Louisville Internation Airport
Rupp Area Event Support Space Renovation Mezzanine Structure
The Lexington Center Corporation is in the process of engaging a Construction Manager to provide various pre-construction and construction phase services for the Rupp Area Event Support Space Renovation project. That project involves the renovation of approximately 20,000sf of dressing rooms and other support spaces on the event level of the area and the construction of a materials storage mezzanine above the performance level. This bid package involves the fabrication and erection of structural steel, metal deck, steel stair, handrails associated with the stair and ramps and associated miscellaneous steel fabrications for the mezzanine and stair. The successful bidder will be assigned to the Construction Manager selected by the Lexington Center Corporation.
Lexington, KY
Harrison Co Middle School Renovation
This project includes related renovation work to occur primarily in the 6th grade wing and connecting corridor of the Harrison County Middle School with an alternate to replace bleachers in the middle school gym. The primary area of work will look to replace the existing insulation and ballasted EPDM roofing system with a new insulated 2-ply modified SBS granular system with minor modifications to decking for mechanical system adjustments. Mechanical work will include demolition of existing rooftop HVAC systems in portions of the 6th grade wing and the installation of new above-ceiling water source heat pump systems with connections to existing building piping system and controls. A new rooftop make-up air unit with related ductwork and one new hydronic pump replacement is included. Electrical work will include new lighting in portions of the 6th grade wing, rerouting electrical connections from old HVAC units to new HVAC units, and connections to new bleacher motors. Additionally, the ceiling grid and tile will be replaced to allow for mechanical and electrical adjustments to the interior spaces
Cynthiana, KY
RFB-219-12
The Division of Abandoned Mine Lands wishes to receibe bits to preform the following described work.The project is located on the Breathitt Knott County near the community of Decoy (Knott Co.). The main slide area is located in Knott County at 37 & #8304; 30′ 34′ N and 83 & #8304; 05′ 25″ W. Access to the toe of the slide is through KY 1516 in Knott County. Access to the top of the slide and the waste areas is off of Big Lovely Road in Breathitt County. The bottom portion of the slide was previously worked as an OSM emergency project. The slide covers approximately 17 acres and was an old hollow fill put in by the coal company in the 70¿s. The proposed reclamation will involve excavation of approximately 300,000 cubic yards of material from the slide area. The top portion of the slide will be stripped to rock and the bottom portion will be held in place by a rock toe buttress with the material being recompacted and benches placed along the slope for stability and drainage purposes. Material not compacted on site will be placed in the various waste areas designated on the plans. For continued project description see Special Conditions.
Breathitt/Knott County, Kentucky
RFB-221-12
This work at the Paducah Transportation District 1 Office Building is for replacement of existing HVAC units. Building will be occupied during construction so work shall be phased.
Paducah, Kentucky
HVAC Replacement #2706
A contract to furnish all labor, material and necessary equipment for HVAC replacement.
Louisville, KY
Retina Associates of Kentucky
The project consists of a complete phased renovation of an existing office suite (9,200 SQ FT). The work specifically includes interior framing and drywall, finishes, casework, electric, HVAC, plumbing and speinkler modifications.
Lexington, KY
Grays Branch & KY 72 Water System Extensions
This contract consists of approximately 1,730 feet of four inch (4″) waterlines, 150 gpm Booster Pump Station, a four inch (4″) Master Meter and appurtenances.
Cawood, KY
Gallatin Co HS Partial Roof Replacement
Partial Roof Replacement
Gallatin Co, KY