12-117 / John L. Huber Building Emergency Operations Center
12-117 / John L. Huber Building Emergency Operations Center
Louisville Water Company is requesting bids to provide all labor, rigging, tools, equipment and materials to provide and install a new AV conferencing system, distributed antenna system, related electrical work and other work as noted in the contract documents.
Work includes: work to alleviate landslide damage to site by the replacement of sidewalks with the addition of individual porches to assist in drainage away from the building, fill and grade work for drainage away from the building, and construction of lawn area swales and retaining wall.
RFB-38-13 Construct Human Resource Office (HRO) Building
RFB-38-13
The project consists of construction of a one-story, Human Resources Office Building that will be built adjacent to the existing G-1 Building. The building includes approximately 5,514 gross square feet in the Base Bid. The structure will be comprised of load bearing insulating concrete form walls with a brick veneer and precast concrete roof deck. The roof system will be an EPDM single-ply system. Interior walls will be non-load bearing metal framing with painted gymsum board.
RFB-31-13
The work consists of upgrading the primary electrical distribution system and
emergency power systems at JCTC. A new Owner supplied S&C pad mounted
primary switch and attendant expansion of the primary distribution system to form a
complete primary electric tie loop for the campus is required. Additionally removal and
replacement of the existing emergency power system serving the campus with three
diesel gensets and attendant low voltage distribution is included.
RFB-33-13 ADA Evaluation & Remediation Lees Campus
RFB-33-13
The project is an upgrade of selected campus areas to make them ADA accessible in
compliance with the Kentucky Building Code and ADAAG current guidelines. This work
occurs in two campus areas and consists of; earthwork, concrete retaining walls,
concrete walks and steps, brick veneer masonry over CMU units, cut stone wall caps,
wood framing/decking, exterior gypboard soffits, break metal flashing, fascia and rain
drainage system, TPO roofing system, lighting, painting and asphalt paving, patching
RFB-34-13
Work will consist of reclamation work on approximately 65.65 forfeited acres of mine
land in CLAY County, Kentucky. The work will consist of earthwork, pond removal,
and revegetation of approximately 24 acres of disturbed land, among other items, on 4
bond forfeiture permits.
Rood and Riddle Equine Hospital New Pharmacy and Training Facility
Rood and Riddle Equine Hospital New Pharmacy and Training Facility
The project consists of the construction of approximately 15,521 SF new Pharmacy and Training Center building that will be built on the campus of Rood and Riddle Equine Hospital. The Project consists of construction of a two story brick veneer building with concrete slab on grade, wood framed walls, wood engineered “I” joist and steel frame second floor framing, with wood truss roof system. Lump Sum Bid Proposals shall be addressed to the Owner from qualified Sub-Contractors to the Owner’s Construction Manager as follows:
Hawkins Construction (CM)
Jeremy Leestma
Potential Sub-Contractors interested in bidding on the project shall contact Hawkins Construction prior to obtaining bid documents. Email hawkinsconstruction@dcr.net
The work consists of constructing approximately 3,806 linear feet of 6-inch water line that will be divided into three projects. This contract will provide the necessary labor, materials, and apprutenant items necessary to complete the construction.
RFB-35-13
This project will provide and install a new UPS system in the existing KET Building. As a part of this project, we will also replace the existing automatic transfer switch, provide new panelboards, and reroute existing loads.
RFB-32-13
The project consists of interior demolition of an 8,000 sq. ft. office building. The demolition will cover all HVAC, plumbing and electrical back to the panels. All interior walls interior furring on exterior walls, floor covering, ceiling tile and grid will be demolished. Exterior walls will have selective demolition to accommodate new windows, doors and storefront system. Selective site demolition will encompass demo of asphalt parking 5’ from the building and existing mechanical pad and foundations. New construction will entail interior metal stud walls with gypsum board, new acoustical ceiling, carpet tile, vinyl composition tile, paint, insulated aluminum windows and insulated aluminum storefront, casework, plumbing fixtures and HVAC system. New exterior construction will consist of a new entry canopy, limited landscaping and new side walk and parking lot stripping.
Stovall Church Road Pump Station Replacement Project
Stovall Church Road Pump Station Replacement Project
Radcliff, Hardin County, Kentucky
The work shall generally consists of: Replacement of a sanitary sewer pump station, including control panel and all accessories, within an existing wet well.
Water Treatment Plant Improvements City of Monticello
Water Treatment Plant Improvements City of Monticello
Expansion of the Monticello Water Treatment Plant to 4.5 million gallons per day. The construction will include the conversion of the existing operations building to a new chemical feed building, conversion of the existing tube settlers to flocculators and plate settlers, a new membrane building, and sludge lagoon.
The project shall consist of constructing additional Portland Cement Concrete pavement to increase the width of the taxiway to 75 feet. Work includes earthwork, drainage, electrical and sodding.
The project includes the construction of four new structures, new football field lighting and related site work. The new structures are: Alternative School and Field House building to include classrooms as well as athletic locker and training spaces; Restroom and Concessions building; Softball Press Box buildingl Bleachers of metal and aluminum construction on concrete footings with fully enclosed prefabricated 420sf press box.
The project consists of a 8,750 SF, one story office building, with frame construction on a slab on grade, and with stone veneer, synthetic plaster, and a shingle roof. The site of the new building is on KY Route 321, just north of Prestonsburg.
RFB-25-13
This project includes removal of existing sound system, house/stage light fixtures and installation of new sound system, house/stage light fixtures in the Auditorium. Project scope includes installation, power and control wiring and integrating new light fixtures into the existing lighting control system.
RFB-28-13 Consequence Management Building Site Prep
RFB-28-13
This project is for the construction of an earthen building pad and two detention basins for a proposed warehouse building. This project is for the building pad and related drainage only and does not include the warehouse building or pavement. The site is located at the Northern side of Bluegrass Station, on the South side of the Tactical Road. Approximately 138,512 cubic feet of material (excavation) is required for the pad construction.