Barbourville Housing Authority Kitchen Upgrades Materials Only
Barbourville Housing Authority Kitchen Upgrades Materials Only
Kitchen Upgrades
Materials Only
Barbourville, KY
Barbourville Housing Authority Kitchen Upgrades Materials Only
Kitchen Upgrades
Materials Only
Barbourville, KY
Leitchfield Aquatic Center
The following bids are requested:
Bid Package 005 – Site Excavation and Storm Drainage
Bid Package 010 – Landscaping
Bid Package 015 – Fencing
Bid Package 020 – Asphalt Paving
Bid Package 025 – Concrete Paving
Bid Package 030 – Main Building Contractor
Bid Package 130 – Swimming Pool and Accessories
Bid Package 220 – Plumbing
Bid Package 260 – Electrical
Leitchfield, KY
13-107 / Crescent Hill Filter Plant Control Room Modifications
Louisville Water Company is requesting bids for work including all labor, rigging, equipment and materials to remodel and modernize the existing Control Room located in the Crescent Hill Filter Building by installing new operator computer consoles wired for multiple large screen monitors and overhead TVs, new raised flooring system, new lighting, construct new server room and provide new UPS backup system, install independent HVAC system and a fire suppression system, remove the surrounding hallway tile floor and install a new Terrazzo floor, paint all associated walls and other work as noted in the plans and contract documents.
Louisville, KY
Clays Mill Road Improvements Section 2B
The “Clays Mill Road Improvements Section 2B Project” involves the construction of approximately 1500 LF of a 5 lane curb and gutter roadway with an underground storm drainage system and one signalized intersection. The project also includes approximately 3,692 SY of JPC pavement, widening of an existing bridge, retaining walls and landscaping.
Lexington, KY
Magoffin Co School Rough Grading
Rough Grading
Salyersville, KY
Boone Trace Lift Station Improvements
Improvements to the existing Boone Trace Lift Station including the replacement of three (3) submersible sewerage pumps; replacement of all wetwell equipment including pump base, piping, guide rails, level controls, and fall protection; replacement of reduced voltage starters; addition of grinder (bid as alternate); addition of stand-by generator and auto-transfer switch; replacement of control panel and new underground electrical service; and miscellaneous appurtenances required for a complete installation.
Radcliff, Kentucky
Coldstream Research Campus Bio-Infiltration Swale and Trail Project
This project includes the construction of a bio-infiltration swale and approximately 900 linear feet of trail within the Coldstream Research Campus. The work includes General Requirements, selective demolition of existing concrete and asphalt pavement, installation of a shared-used trail constructed of porous concrete and bituminous asphalt pavement, installation of a precast concrete wall, earthwork, drainage swale armoring, temporary and permanent erosion control blankets, planting installation, planting maintenance and other related site improvements.
Lexington, KY
Click Here for More Details
Frakes Elementary School Parking Repair
The project scope includes repair of a parking area adjacent to the retaining wall.
Pineville, Ky
Click Here for More Details
Estill Co Water District No.1 Phase 10 Water Line Extensions
The installation of approximately 36,500 L.F. of 8-inch and 6-inch PVC pipe, approximately 12,840 L.F. of 4-inch PVC pipe and 3-inch PVC pipe, water meters, hydrants, water booster stations, chlorine booster stations, and accessories.
Estill County, Ky
Click Here for More Details
Flemingsburg Fire Station
Fire Station
Flemingsburg, KY
Georgetown Houing Authority Conversion of Daycare
Conversion of Daycare to Three Residential Units
Georgetown, KY
Todd County Housing Authority Flooring Replacement
Flooring Replacement
Guthrie, KY
RFQ a contract to provide DS for Louisville Extreme Park Function Replacement and Partial Relocation #3076
Request for Qualifications a contract to provide design services for Louisville Extreme
Park Function Replacement and Partial Relocation.
Louisville, KY
Runway Rehabilitation and Lighting Project at Sturgis Municipal Airport
Project Description: This project consists of removal of the existing asphalt overlay, rubblization of the underlyning concrete base bituminous asphalt overlay. In addition, the project also consists of new runway lighting and NAVAIDs as well as pavement markings.
Sturgis, KY
Secruity Fence and Gates at Pikeville / Pike County Airport (Hatcher Field)
To Furnish all labor, material, and equipment and performing all work necessary to install security fencing and gates.
Pikeville, KY
Dark Fire Curing Barn UK Research and Learning Center
Dark Fire Curing Barn
Princeton, KY
2353.0 Renovate Robotics Building
The project is the partial renovation of the 8,573 square foot, fifth-floor of the Robotics Building on the University of Kentucky’s main campus. The work generally consists of the following:
Selective demolition of CMU and gypsum board systems walls, lay-in ceilings and associated suspension systems, HM frames and wood doors, resilient flooring and base, electrical devices and wiring, and plumbing fixtures with associated piping.
New gypsum board system walls and selected ceilings and soffits
Lay-in acoustic ceilings
Hollow metal door frames
Solid wood doors
Aluminum storefront systems
Resilient floor tile
Carpet tiles
Architectural woodwork counters
Laboratory casework
Selective new Mechanical work
Selective new Plumbing and Fire Protection work
Selective new Electrical work
Lexington, KY
Click Here to View
13-99 / Tank Coating Program 2013 – Blankenbaker Crossings and Jefferson Memorial Tanks
Louisville Water Company is requesting bids for recoating exteriors and limited interiors of two (2) existing elevated water storage tanks, including surface preparation, coating application, new cathodic protection system, electrical work and miscellaneous tank accessories and site work as noted on contract documents.
Louisville, KY
RFB-28-14
Estimate:
$1,577,678.00
The project is the interior renovation of a one-story building and the construction of a small addition to that building. Contractor should review the Construction Documents for specific information.
Interior Renovation: Substantial interior demolition and removal of materials off-site. Installation of new metal stud/gypboard systems in a large portion of the building. Installation of new hollow metal frames and solid wood doors in a large portion of the building. Installation of new lay-in ceiling. Patching of existing gypboard walls. Painting of entire interior, including walls and door frames. Floor preparation and installation of VCT and carpet finishes. Toilet partitions and accessories. Replacement glazing in a few selected aluminum windows. Installation of a new fire protection system, both in interior and attic truss spaces. Complete new mechanical, electrical, data, and alarm systems. Building Addition:Sitework consisting of a built-up engineered fill pad. Minor concrete paving. Minor sodding and seeding. Cast-in-place concrete slab with perimeter rigid insulation. Steel frame with bar-joist structural system. Metal stud and brick masonry veneer. Aluminum windows and storefront systems. Building insulation. 2-ply SBS-Modified Bitumen roof. Installation of new metal stud/gypboard systems. Installation of new hollow metal frames and solid wood doors. Installation of new lay-in ceiling. Painting of entire interior, including walls and door frames. Floor preparation and installation of VCT and carpet finishes. Toilet partitions and accessories. Installation of a new fire protection system. Complete mechanical, electrical, data, and alarm systems.
Lexington, Kentucky
Dawson Springs Housing Authority HVAC Upgrades
HVAC Upgrades
Dawson Springs, KY
Hopkinsville Housing Authority
New Maintenance Building & Parking Area
Hopkinsville, KY
Lake Cumberland Various Natural Gas Line Extensions
Various Natural Gas Line Extensions
Lake Cumberland, KY
City of Jeffersontown Taylorsville Road Streetscape
The project consists but not limited to the reconstruction of concrete sidewalk along each side of Taylorsville Road between College Drive and Ruckreigle Parkway; and reconstruction of the Taylorsville Road/Watterson Trail town square area to include the installation of areas of brick paving and constructed architectural features. The project also includes the construction and installation of supporting improvements along the Taylorsville Road right-of-way consisting of low brick walls, brick paver verge, landscaping, and lighting; and the fabrication and installation of two gateway arch structures located at each end of the corridor.
Jeffersontown, KY
New Wind Cone & Segmented Circle at McCreary County Airport
To Furnish all labor, materials, equipment and perfoming all work necessary to Install a New Wind Cone and Segmented Circle at the McCreary County Airport.
Pine Knoxt, KY