13-104 / Crescent Hill Gate House and Gatekeepers House Improvements
13-104 / Crescent Hill Gate House and Gatekeepers House Improvements
Louisville Water Company is requesting Bids for providing all labor, rigging, tools, equipment, and materials for the roof replacement and masonry restoration at the Crescent Hill Gate House. See contract documents for additional details.
Drug Store LS Elimination and Woodcreek LS Replacement Project
Drug Store LS Elimination and Woodcreek LS Replacement Project
The work shall generally consist of: Installation of 1,450LF of 8 inch gravity sewer main, replacement of a 250 gpm lift station, and 350LF of 6 inch force main.
This project is to supply and install a new electronic ticker board to a curved wall in the College of Business. This will include all parts and labor needed to install the unit on our wall per the attached drawings. The wall, electric and electronic connections will be by others.
Convert part of existing greenhouse into research lab, new HVAC system, and creating lab space for researchers. Portion of space shall be certified by USDA for the proper containment of small animals. New skin, interior and ceiling system are included.
The project includes installation of approximately 214 SY of 4” concrete sidewalk extensions with detectable warnings, raising five (5) catch basins, associated grading to promote positive drainage and restoration.
Louisville Water Company is requesting bids to renovate existing pressure reducing valve (PRV) station, including piping, valves, and vault accessories.
13-98 / Bullitt County Extension Program North and South Summitt Drive Booster Pumping Station
13-98 / Bullitt County Extension Program North and South Summitt Drive Booster Pumping Station
Louisville Water Company is requesting bids for the furnish and install of one (1) complete underground booster pumping station including site work, electrical work, EPSC, drainage, utilities and restoration.
RFB-23-14
Estimate: $162,960.00
The sites are on the same road (Prestons Branch Road), across the street from each other. These sites consist of a combined total of five (5) open portals. AML plans to close the portals with wildlife closures. Access roads will need to be upgraded/constructed to provide access to the portals; however, any trees removed will be less than 5” in diameter or cleared between October 15th and March 31st. Silt-check fencing and prompt establishment of vegetation within all disturbed areas will provide sediment control. As the area to be revegetated is less than 1.0 acre, residential seeding will be used.
There is a slide, as well as drainage issues, behind the residence. Two portals exist on the property; one has been backfilled and the other (closed by a previous project with cinderblock) was reopened by the landowner for fear of a blowout. AML plans to replace the existing cinderblock closure with an 18” wildlife closure and backfill it with class II rock. Approximately 80 linear feet of a 3-ft. flat bottom rectangular gabion ditch will be constructed from this portal to the existing road culvert. Sixty-four linear feet of an 8-ft. tall concrete gravity wall (with safety fence) shall be constructed behind the residence. Approximately 110 linear feet of subdrain will be installed in front of the wall (behind the residence) and daylight into the rectangular gabion ditch. A waste area is on site. No trees will be disturbed except for trees in the area considered unstable by the slide. Silt-check fencing and prompt establishment of vegetation within all disturbed areas will provide sediment control. As the area to be revegetated is less than 1.0 acre, residential seeding will be used. For continued project description see Special Conditions.
RFB-25-14
Estimate: $132,000.00
Project includes the installation of new underground conduit paths, new transformer pads and walls and secondary conductor installations for the conversion of the existing primary electrical system to Kentucky Utilities. There shall be a $ 30,000 allowance in the bid price to reimburse Kentucky Utilities for their portion of the work
Contract I – Production Well
A gravel packed well, test well, well pump, associated piping and site work, electrical and control work, SCADA System, fence and all appurtenances as shown
Approximately 5,900 lf of 12” PVC raw water line, including appurtenances
Vanceburg Contract 2 Automated Meter Reading (AMR) System
Vanceburg Contract 2 Automated Meter Reading (AMR) System
Contract 2 – Automated Meter Reading (AMR) System
Furnish 1,550 AMR meters and appurtenances
Finish, install and place into operation a complete AMR System
This Contract provides for the installation of approximately 7,553 linear feet of 24-inch sewer and rehab approximately 707 linear feet of 24-inch sewer with cured-in-place-pipe. This project also includes installing 30 sanitary manholes, erosion control, appurtenant work, and eliminating one (1) package plant (Silver Heights WQTC). The project is generally located along I-65 from the Silver Heights WQTC to Fishpool Creek.
Bullock Pen Lake Sewer/Bingham Pump Station Relocation
Bullock Pen Lake Sewer/Bingham Pump Station Relocation
Construction of Base Bid shall consist of approximately 2,404 LF of 8” PVC gravity sewer, 2,465 LF of 6” force main, 3,870 of 3” force main, 2,225 LF of 2” force main, 1,410 LF of 1.5” force main, 5,130 LF of 1.25” force main, 10 manholes, rehab of existing pump station, 80 LF of concrete cap, 9 sewage combination air valves, 7 flushing stations, 39 individual grinder pumps, 1 submersible pump station, generator, 80 LF of road bores, 790 LF of free bore, and all necessary appurtenances.
Grant County Sanitary Sewer District, KY Click Here for More Details
Olmstead Elementary School Addition
Olmstead Elementary School Addition
The project scope includes a 2-classrood addition to the Olmstead Elementary in Olmstead, Kentucky to add 1-Art classroom and 1-Prescool classroom. Construction of this addition will tie the existing classroom building to the existing gymnasium buildings as well. Envelope construction consists of a concrete foundation work; masonry load-bearing, spray-foam insulated cavity wall system; steel metal joists and decking roof structure with lightweight insulating concrete decking and a thermoplastic membrane roof.
Olmstead, KY Click Here for More Details
Verity Middle School Addition/Renovation
Verity Middle School Addition/Renovation
The following bids are requested:
2 ASPHALT PAVING
3 GENERAL TRADES
4 MASONRY
5 STRUCTURAL STEEL
6 ROOFING
7 ALUMINUM STOREFRONT / WINDOWS
8 GYPSUM BOARD / CEILINGS
9 RESILIENT FLOORING / CARPET
10 TILING
11 WOOD FLOORING
12 PAINTING
13 SCIENCE / CLAD CASEWORK
14 GYMNASIUM EQUIPMENT
15 TELESCOPING STANDS
16 FIRE PROTECTION
17 FOOD SERVICE EQUIPMENT
18 MECHANICAL
19 ELECTRICAL
20 SECURITY / FIRE ALARM SYSTEM
21 TEST AND BALANCE
22 COMBINATION
Bullock Pen Lake Sewer/Bingham Pump Station Relocation
Bullock Pen Lake Sewer/Bingham Pump Station Relocation
Construction of Base Bid shall consist of approximately 2,404 LF of 8” PVC gravity sewer, 2,465 LF of 6” force main, 3,870 of 3” force main, 2,225 LF of 2” force main, 1,410 LF of 1.5” force main, 5,130 LF of 1.25” force main, 10 manholes, rehab of existing pump station, 80 LF of concrete cap, 9 sewage combination air valves, 7 flushing stations, 39 individual grinder pumps, 1 submersible pump station, generator, 80 LF of road bores, 790 LF of free bore, and all necessary appurtenances.
Grant County Sanitary Sewer District, KY
Central Heating Plant Condensate Tank and Piping
1. Install approximately 300 feet of 6” condensate return piping, the entire length of the Peterson Service Building Utility Tunnel. This includes connections and full sized valves at both ends plus a tie in with the existing 2” condensate return piping exiting the Peterson Service Building.
Lexington, KY Click Here for More Details