I65 Exit 112 Landscaping & Beautification

I65 Exit 112 Landscaping & Beautification

The project area includes the installation of landscaping improvements (top soil and plan materials) within the four triangle segments of the I-65 Exit 112 interchange with Ky 245. The project also includes the removal of guardrail and drainage modifications along the southbound exit ramp; and the replacement of asphalt paving with decorative concrete within portions of the median islands along KY 245 and the intersections with interstate access ramps.

Shepherdsville, Ky

Click Here to Order

Blue Sky Pumping Station and Force Main Contract 2 – Force Main

Blue Sky Pumping Station and Force Main Contract 2 – Force Main
This project involves the construction of approximately 27,000 LF of 10-inch PVC force main, 785 LF of 10-inch restrained joint ductile iron pipe, 725 LF of 18-inch steel cover pipe for road bores, and appurtenances.
Lexington, KY
Click Here for More Details

Blue Sky Pumping Station and Force Main Contract 1 – Pump Station

Blue Sky Pumping Station and Force Main Contract 1 – Pump Station
This project includes the construction of an 800 gallon per minute, Class C pumping station.
Lexington, KY
Click Here for More Details

New Rural Health Clinic

New Rural Health Clinic
New Rural Health Clinic which will consist of The General Construction including Mechanical, Electrical, Site, and any inciental but related work required for its construction.
Warsaw, KY
Click Here for More Details

City of Russell Springs Manhole Replacement Project Contract No. 3

City of Russell Springs Manhole Replacement Project Contract No. 3
This Contract consists of structural lining and/or replacement of brick sanitary manholes, sealing and lining brick manhole chimneys, structural lining and/or repair of 8″-15″ clay sewer main pipe, repair/replacement of service lateral connections and piping, adjustment/replacement of cast iron manhole top frames, pavement removal/replacement and general surface restoration. The Project also includes cleanout and closed circuit television inspection of 8″-12″ sewer main pipe. Demolition and removal of a reinforced concrete grit separator structure will be included as an additive alternate bid item. All work shall be provided at the specific site locations and to the final quantities required and ordered in writing by the Owner.
Russell County Ky
Click Here for More Details

RFB-61-14 Exterior Lighting Upgrade

National Guard Armory
Estimate: $ 95,182.00
This project includes the installation of pole lights and installation/ replacement of other
exterior light fixtures. There is an add alternate that includes additional pole lights and
controls.

Bowling Green, Kentucky

Click here to order

RFB-60-14 Building Replacement Morgan County Tree Nursery

Estimate:
$924,000.00
The Processing Building project for the Division of Forestry, Morgan County Nursery involves construction of a new 10,360 sqft. Pre-engineered Metal Building constructed over an existing concrete slab and site from a previous building destroyed in a tornado in March of 2012 near West Liberty Kentucky. For a complete description, see the specifications.

West Liberty, Kentucky

Click here to order

13-89 940 PZ Freys Hill Booster Pump Station

13-89 940 PZ Freys Hill Booster Pump Station

Louisville Water Company is requesting bids to renovate existing above ground booster pumping station including building, pumps, motors, piping, valves, transmission main, electrical, telemetry, pavement, ventilation, emergency generator, and new temporary booster pumping station

Louisville, Ky

Click Here to Order

2380.0 Parking Structure #2 Lighting Upgrade

2380.0 Parking Structure #2 Lighting Upgrade

The project is intended to upgrade the lighting in Parking Structure #2 to enhance the safety of the occupants and reduce operational costs. The construction documents were developed after a professional study that analyzed existing infrastructure conditions, surveyed lighting conditions in the existing garage, completed lighting calculations, generated payback analysis and surveyed currently available lighting products. The existing HID Metal Halide fixtures will be replaced with LED units that will enhance the energy savings and long fixture life which creates a favorable payback return on investment. The controls on the fixture will be modernized to include occupancy sensors to further reduce energy costs in the upper levels of the parking garage.

Lexington, KY

Click Here to View

13-89 / 940 PZ – Freys Hill Booster Pumping Station Renovation

13-89 / 940 PZ – Freys Hill Booster Pumping Station Renovation

Louisville Water Company is requesting bids to renovate existing above ground booster pumping station including building, pumps, motors, piping, valves, transmission main, electrical, telemetry, pavement, ventilation, emergency generator, and new temporary booster pumping station. A pre-bid meeting to discuss the project will be held on Thursday, August 15, 2013 at 9:00 A.M. local time at the site location Freys Hill Booster Pump Station, 3381 Freys Hill Road, Louisville, Kentucky. Attendance at this meeting is highly recommended. Questions related to this Project must be submitted in writing via e-mail or fax by Monday, August 19, 2013. All inquiries must be sent to the attention of the Buyer, Renee Fromme, e-mail rfromme@lwcky.com or fax 502-569-0815. Responses to inquiries received by Monday, August 18, 2013 will be provided in an Addendum to all plan holders. Questions received after August 19, 2013 may not be addressed. The Company’s Project Manager’s estimate for the Contract plus Company supplied materials for this Project is $1,000,001.00 to $3,000,000.00. For this Contract, prevailing wage does apply, and a Bid Bond is required. Bids will only be accepted from Bidders who have been pre-qualified by the Company in the pre-qualification category or categories that apply to this Bid. This bid requires pre-qualification in Heavy Construction category. Electrical work must be performed by Contractor/Sub-Contractor pre-qualified in the Electrical Category by the Louisville Water Company. Roofing work must be performed by Contractor/Sub-Contractor pre-qualified in the Roofing Category by the Louisville Water Company. Ductile Iron Water Main work must be performed by Contractor/Sub-Contractor prequalified in 20”- 48” Ductile Iron Water Main Category by the Louisville Water Company, and Pre-Stress Concrete Water Main work must be performed by a Contractor/Sub-Contractor prequalified in 24” – 60” Pre-Stressed Concrete Water Main Category by Louisville Water Company. For information about pre-qualification, contact the Buyer, Renee Fromme, at (502) 569-3600, ext. 2300 or by e-mail at rfromme@lwcky.com.

Louisville, Ky

Click Here to Order

Construct Hangar Taxiway Replacement and Runway and Taxiway Crack Repair, Seal Coat, and Markings for Mayfield Graves County Airport

Construct Hangar Taxiway Replacement and Runway and Taxiway Crack Repair, Seal Coat, and Markings for Mayfield Graves County Airport

Mayfield, Ky

Click Here to Order

Trimble County High School Athletic Fields Phase II

Trimble County High School Athletic Fields Phase II

Bedford, Ky

Click Here to Order

TARC RFP P-2529A Diesel Exhaust System Equipment

TARC RFP P-2529A Diesel Exhaust System Equipment

The Transit Authority of River City (TARC) is soliciting proposals for a Diesel Exhaust Fluid (DEF) System.

Louisville, Ky

Click Here to Order

Jeffersonville Wastewater Odor Control Improvement Project

Jeffersonville Wastewater Odor Control Improvement Project

This project consists of the furnishing and installing of two (2) complete odor control systems and all related appurtenances. One (1) system shall be installed at the 10th Street Pump Station and one (1) system shall be installed at the Downtown Wastewater Treatment Plant Headworks.

Jeffersonville, IN

Click Here to Order

Krispy Kreme # 76

Krispy Kreme # 76, 3000 Bardstown Rd

The projects consists of the remodel of an existing 8,289sf Krispy Kreme Doughnuts
restaurant(store #74) and 5,441sf Krispy Kreme Doughnuts restaurant (store #76). The scope
includes interior demolition, concrete paving, sidewalks, curb/gutter, misc masonry, misc steel,
rough carpentry, casework/millwork, EIFS, new roofing & repairs, caulking,
doors/frames/hardware, storefronts, drywall, acoustical ceilings, tile, resilient flooring, painting,
toilet accessories, plumbing, HVAC and electrical.

Louisville, Ky

Click Here to Order

Krispy Kreme # 74

Krispy Kreme # 74, 3920 7th Street

The projects consists of the remodel of an existing 8,289sf Krispy Kreme Doughnuts
restaurant(store #74) and 5,441sf Krispy Kreme Doughnuts restaurant (store #76). The scope
includes interior demolition, concrete paving, sidewalks, curb/gutter, misc masonry, misc steel,
rough carpentry, casework/millwork, EIFS, new roofing & repairs, caulking,
doors/frames/hardware, storefronts, drywall, acoustical ceilings, tile, resilient flooring, painting,
toilet accessories, plumbing, HVAC and electrical.

Louisville, Ky

Click Here to Order

Trimble County High School Athletic Fields Phase II

Trimble County High School Athletic Fields Phase II

Beford, KY

Click Here to Order

RFB-60-14 Building Replacement Morgan County Tree Nursery

KY Division of Forestry
Estimate:
$924,000.00
The Processing Building project for the Division of Forestry, Morgan County Nursery involves construction of a new 10,360 sqft. Pre-engineered Metal Building constructed over an existing concrete slab and site from a previous building destroyed in a tornado in March of 2012 near West Liberty Kentucky. For a complete description, see the specifications.

West Liberty, Kentucky

Click here to order

Construct Hangar Taxiway Replacement and Runway and Taxiway Crack Repair, Seal Coat, and Markings for Mayfield Graves County Airport

Construct Hangar Taxiway Replacement and Runway and Taxiway Crack Repair, Seal Coat, and Markings for Mayfield Graves County Airport

This project consists of the full depth replacement of the taxiways to the T-hangars as well as crack repair, seal coat and markings of the runway and parallel taxiway.

Mayfield, KY

Click Here to Order

Owingsville Elementary School Addition – Renovation

Owingsville Elementary School Addition – Renovation

The following bids are requested:

2 GENERAL TRADES
3 MASONRY
4 STEEL
5 ROOF
6 DRYWALL/CEILINGS
7 WINDOWS/STOREFRONTS
8 PAINT
9 VCT
10 CERAMIC TILE
11 TERRAZZO
12 WOOD FLOOR
13 BLEACHERS
14 FOOD SERVICE
15 PLUMBING/MECHANICAL
16 ELECTRICAL
17 ASPHALT PAVING
19 COMBINATION

Owingsville, KY

Click Here to View

Big Sandy Water District Contract D1 Water Transmission Line

Big Sandy Water District Contract D1 Water Transmission Line

a) 2270 LF 14” HDPE DR15.5 Water Transmission Line
b) 28,510 LF 12” HDPE DR13.5 Water Transmission Line
c) 370 LF Bore & Jack 20” Steel Casing Pipe with 14/12” Carrier Pipe
d) 11 EA Air Release Valves and Blow Off Valves
e) 15 EA 14” thru 3” Gate Valves
f) 8 EA 12” Tie-Ins

Big Sandy Water District, KY

Click Here to View

City of Hurstbourne Road Resurfacing and Improvements

City of Hurstbourne Road Resurfacing and Improvements

City of Hurstbourne, KY

Click Here to Order

Taxiway Rehabiliation for the Mount Sterling – Montgomery County Airport

Taxiway Rehabiliation for the Mount Sterling – Montgomery County Airport

Mount Sterling, KY

Click Here to Order

Big Sandy Water District Contract E1 Water Booster Station

Big Sandy Water District Contract E1 Water Booster Station

a) 1 EA 700 GPM Duplex Pump Station w/ VFD

Big Sandy Water District, KY

Click Here to View

RFB-55-14 Lona Collins (AML) Reclamation Project

RFB-55-14
Estimate: $565,000.00
The Lona Collins Site has been previously worked by OSM. The resident continues to have drainage issues that have resulted in their access drive being inaccessible for her medical treatment. AML proposes to open and drain two collapsed portals using subdrain and ditches. The water will be directed around the access drive into Stonecoal Creek. A gabion wall will be constructed to stabilize the hillside and prevent material from blocking the drainage. A guardrail panel pile and lagging wall will be constructed and tied into the existing OSM gabion wall. A concrete swale ditch will be constructed in front of the walls to drain any surface water away from the access. Existing culverts will be replaced due to their poor condition. Construction will be able to access using the Collins driveway and the neighbor’s driveway. AML will waste onsite. No trees greater than 5” diameter will be removed during construction unless during the October 15th- March 31st window. For continued description, see Special Conditions.

Pike County, Kentucky