The work consists of earthwork to create a compacted, earthen pad approximately 101,250 square feet in size in the Springfield-Washington County Industrial Park located on Highway 555, at the north Springfield city limits.
Springfield, KY
Click Here to View
City of Frankfort IT Building and Finance Department Roof Repairs and Misc Improvements
City of Frankfort IT Building and Finance Department Roof Repairs and Misc Improvements
RFB-221-13
Estimate:
$298,080.00
This project renovates 3,800 square feet of existing space on the Second Floor of the North End of the Gray Building to create a Business Synergy Center. The Center will provide a series of interrelated spaces where participants learn business and collaboration skills that are known to be essential to successful business ventures.
This setting will project a professional business atmosphere that is key in this training experience. Interior finishes will reflect this approach.
The Center will be visible from the corridor through a glass curtainwall system. The central reception area will be open with glass partitions that offer visibility into all other areas and convenient access. The Center will consist of a tiered classroom for 24 students. This room will have fixed tiered seating with electrified tables for laptop computers, WiFi, and projection capabilities. An Ideation Room has a capacity 12 individuals with 3 walls covered with “white board” for discovery of ideas, outlining strategies, and organizational problem solving. A third space will be “the Board Room” which will provide professional setting for board room presentations and corporate role-playing.
Finishes will include mahogany panelling, glass partition, granite countertops. Floors will be carpet tiles. Ceiling will be 2×2 lay-in acoustical panels. Lighting will include a variety stage sets for the activities described above. HVAC will utilize new units to conform to the new layout.
RFB-2-14
Estimate:
$7,346,159.00
This project, Renovate Mignon Residence Hall, will include a general renovation and upgrades to the facility. The upgrades will include the following: replacement of floor coverings, renovations of all bathrooms, kitchen, and lobby areas, elevator upgrades, masonry repairs, I.T. upgrades, window replacement, ADA accessibility, mechanical upgrades, and exterior drainage improvements.
The scope of work will include the redevelopment of a new entry focus and associated site work. Site work design is structured to create an enhanced approach and entry to the facility from the west façade of the building. The site work creates an outdoor patio area with new entry stairs leading to the building. A new ADA ramp is provided to allow for the facility to better serve the occupants that have mobility disabilities.
Also as part of the project, the overall exterior appearance of the building will be updated to match the other adjacent building in the complex with a new brick façade. The existing precast panels will be removed and replaced with a brick façade.
The renovation consists of replacing the plumbing fixtures in the residence rooms and installing new water heaters. New maintenance and drain valves are also to be installed. The steam-to-hot water heat exchanger will be replaced along with adding new HVAC units for the main lobby level and heat in the corridors. Rooftop units will provide exhaust and outside air for the facility. An alternate will replace the cooling tower.
RFB-5-14 Oakwood Specialty Clinic Intermediate Care Facility
RFB-5-14
Estimate: $1,504,256.59
The project consists of new construction and renovation; the new construction
including general construction, mechanical, plumbing and electrical work. The work
entails and addition of approximately 7,500 square feet and renovation of
approximately 960 square feet of the existing building. The addition is a single story,
steel frame with metal stud walls and brick veneer, a shingle roof over nailboard
composite insulation and metal roof deck .
13-86 / Adams Hill Townhomes Water Main Replacement
13-86 / Adams Hill Townhomes Water Main Replacement
Louisville Water Company is requesting Bids for the installation of 65 +/- linear feet of 6-inch Pressure Class 350 ductile iron water main (using traditional trench installation and lay-in-place techniques), Supply and Installation of 990 +/- linear feet of 6-inch HDPE DIPS DR-11 (using traditional trench installation or directional drill techniques) and Supply and Installation of 195 +/- linear feet of 4-inch HDPE DIPS DR-11 (using traditional trench installation or directional drill techniques) and appurtenances and to restore the site. Also included with the project is the installation of 2 fire hydrants, the relocation/renewal/transfer of 28 customer services and 7 meter exchanges. All ductile iron pipe and pipe appurtenances will be supplied by Louisville Water Company. All HDPE material shall be supplied by the contractor..
13-88 / Lexington Road Area Lead Services Renewals
13-88 / Lexington Road Area Lead Services Renewals
Louisville Water Company is requesting Bids for the renewal of lead services in the Lexington Road Area. Design information indicates a total of 104 customer service renewals, seven (7) customer service discontinues and 42 meter exchanges.
Louisville Water Company is requesting Bids for the supply and installation of +/- 1,364 sacrificial 32-lb. magnesium anodes and 25 test stations on existing water main.
Louisville Water Company is requesting Bids for the installation of +/- 1,970 linear feet of 12-inch DPW water main, +/-3,270 linear feet of 8-inch DPW water main, +/- 857 linear feet of 6-inch DPW water main, and 140 linear feet of 4-inch DPW water main along Preston Highway between E. Indian Trail and 5902 Preston Highway, along Clarks Lane between Pendell Ave. and 1004 Clarks Lane, along Shelby Street between Brandeis Ave. and Burnett Ave, and along Arthur Street between Eastern Parkway and 2008 Arthur St. Also included with the project is the installation of 11 fire hydrants, the relocation/renewal/transfer of 102 customer services, 12 service discontinues, and 5 meter exchanges.
Bethany Road Waterline Extension Control 1 Waterlines
Bethany Road Waterline Extension Control 1 Waterlines
Work is to include installation of approximately 4,250 LF of 4-inch waterline, 1,500 LF of 2-inch waterline and other appurtenances. Installation of a master meter vault with telemetry, a hydro pneumatic pump station and 14 service connectors.
Meadows-Northland-Arlington Neighborhood Improvement Project Phase 5B
Construct all associated sanitary and storm sewer piping and structures as shown. Provide all erosion control measures, concrete sidewalk, curb and gutter, and asphalt paving as required for the project.
Lexington, KY Click Here for More Deatils
RFB-222-13 Hand Grenade Range Road Improvements
RFB-222-13
Wendell H. Ford Regional Training Center
Estimate:
$138,790.00
This project consists of sloping the existing hillside adjacent to the existing gravel road leading to the Hand Grenade Range. The hillsides will be graded, sloped at 2:1, and then hydroseeded. Roadside ditches will be improved for positive drainage. The existing gravel drive will be repaired and regraded according to the contract documents. The work includes all labor and material.
RFB-220-13 Building B Demolition & Site Improvements
RFB-220-13
Big Sandy Community & Technical College Mayo Campus
Estimate:
$130,000.00
Project includes the demolition of an existing two story building, removing utilities to it and returning the site to a finished grade.
The scope of work consists of a full restaurant renovation & drive-through addition. All mechanical/electrical/plumbing trades will be required as well as sitework, concrete, carpentry, rough carpentry, finish carpentry, Millwork, masonry, interior & exterior finishes, storefront, roofing, and painting.
The project consists of construction of an approximately 10,000 SF, single story facility complete with associated sitework, mechanical, electrical and plumbing. The building is steel and wood framed EPDM and asphalt shingle roofing, interior gypsum board partitions, suspended acoustical tile ceilings, ceramic tile, VCT and carpet flooring, casework, painting and wall coverings.
The following bids are requested:
Sitework
General Trades
Masonry
Roofing
Aluminum Storefronts & Windows
Drywall & Framing
Painting
Flooring
Plumbing
HVAC
Electrical
Combination
East Frankfort Interceptor Rehabilitation Phase II
East Frankfort Interceptor Rehabilitation Phase II
Construction of 150 feet of 42-inch gravity sewer, 100 LF of 54-inch bore and jack, the replacement of 175 LF of 21″ gravity sewer, the replacement of 60 LF of parallel 16 and 20-inch pressure pipes, and the rehab of 645 LF of 18 and 24-inch gravity sewer using cured in place pipe.