The Isaac Murphy Memorial Garden Trailhead is a community park that will incorporate site amenities to encourage social gatherings and serve as a “starting point” for The Legacy Trail at the east end of town. New curbs, sidewalks, seat walls, bike racks, water fountains, flagpoles, landscaping and am amphitheater will provide opportunities for visitors to enjoy the space as well as utilize it as a connection to The Legacy Trail.
The entire 28,000 square feet of existing Dana Hall will be completely renovated and approximately 8,700 square feet of additions constructed on the east end of the four-story dormitory and onto the second floor perimeter of the two story entry-commons areas on the south side of the building. The infill area between the dormitory and the entry-commons area will be expanded to contain a new elevator, a new stair, a new mechanical penthouse and expansion area for the dormitory showers.
The east end addition will contain a study room and an RA dormitory room on each of the four dormitory floors, whereas the addition to the two story entry-commons area contains a coffee bar, accessible toilet rooms, TV viewing and game spaces, additional lounge and gathering space, and an apartment. The roof of the two story entry-commons space will be utilized as a roof terrace.
The buildings mechanical, electrical and plumbing systems will be replaced and updated as part of the project to provide not only a quality housing environment but also compliance with life safety and accessibility codes.
CCK-1962-14 Safety and Security Building 23 Renovation
CCK-1962-14 Safety and Security Building 23 Renovation
Renovation to improve the operations center by reorganizing a partial area of the first floor. Other work includes infilling an exterior stair to create two new offices and providing direct egree from the first floor to exterior of the building.
Painted Stone Elementary Insulation of Building Envelope
Painted Stone Elementary Insulation of Building Envelope
Furnishing of all labor, materials and the performance of all work required for the installation of insulation in the building envelope of Painted Stone Elementary.
City of Nicholasville Memorial Plaza Site Improvements
City of Nicholasville Memorial Plaza Site Improvements
Project consisting of but not limited to, water line construction, storm line construction, sidewalk placement. final asphalt surface place, topsoiling, seeding and straw together with all related work as specified and shown on the drawings
Project consists of removal of the existing HVAC systems in the building and replacement with new HVAC systems using existing ductwork; and providing all associated work, including but not limited to, existing window insulated panel infill, roofing patching, wall patching including finishes, caulking and other work as indicated and as necessary for a complete, weather-tight, fully functional and operational, and finished installation.
Georgetown Scott County Museum Lighting Replacement
Georgetown Scott County Museum Lighting Replacement
Project consists of removal of the existing lighting in the Museum main display area and replacement with new lighting and controls; and providing all associated work, including but not limited to, wall patching including painting, caulking and other work as indicated and as necessary for a complete, fully functional and operational and finished installation.
The project includes providing all construction supervision, labor, materials, tools, test equipment necessary for the construction of approximately 200 linear feet of 60 inch, 1,200 linear feet of 54 inch, 2,800 linear feet of 48 inch, and 900 linear feet of 18 inch gravity sewer main and all of the associated structures.
Fayette Co Cooperative Extension Office Audio Visual and Lighting Upgrades
Fayette Co Cooperative Extension Office Audio Visual and Lighting Upgrades
Project consists of removal of existing light fixtures and lighting control systems in the building and replacement with new dimming LED Light Fixtures and Lighting Control Systems; removal of the existing audio systems in the building and replacement with new audio systems providing new High Definition Cameras, High Definition OH Projectors, Motorized Screens, HD Video Capturing and Recording, HD Display Monitors, Smart Podiums, Wireless Interface and Wireless Handheld Control of all Systems; and providing all associated work, including but not limited to wall patching including finishes, caulking and other work as indicated and as necessary for a complete, fully functional and operations, and finished installation.
Roadway Rehabilitation Man O War at Harrodsburg Road
Roadway Rehabilitation Man O War at Harrodsburg Road
The work entails rehabilitation of four (4) lanes of southbound Man O’ War Boulevard at the intersection of Harrodsburg Road. Work shall consist of excavating approximately 1300 square yards of existing pavement and dense graded aggregate (DGA) base, and then rebuilding with 6” of DGA base and 10” of Portland cement concrete pavement. Work shall also include installation of pre-formed traffic control loops and reestablishment of signal control via the new loops. Additional tasks shall include joint sealing, traffic markings, bituminous transition zones and related work.
North Nelson Water District US 31E Waterline Relocation Phase 2
North Nelson Water District US 31E Waterline Relocation Phase 2
This contract consists of approximately 3,960 LF of 8″ waterline, 1,400 LF of 6″ waterline, 3,065 LF of 4″ waterline and 890 LF of 3″ waterline, 28 tie-in connections and all necessary appurtenances. This is a relocation of existing facilities. No rock trenching will be allowed on this project.
Pine Creek, Cram Creek and Pert Creek Phase 2 Water System Improvements
Pine Creek, Cram Creek and Pert Creek Phase 2 Water System Improvements
Construct approximately 38,120 feet of 3-inch through 8-inch water main, prefabricated booster pump station, master meter vault, pressure reducing vaults, and related appurtenances.
The Project Includes providing all construction, labor, material, tools and test equipment necessary for the construction of 2,287 ft or 21 inch sanitary sewer, 195 ft of 10 inch sanitary sewer, 710 ft of 8 inch sanitary sewer, 34 manholes, and all other necessary appurtenances
This project consists of the providing of all materials labor and equipment for the construction of: Furnish and install, complete and ready for service, 505 L.F. of 60″ diameter storm drain under +/- 30 feet of cover. Remove and/or grout approximately 480 L.F. failed 48″ storm drain. Relocate utilities and restore surfaces as necessary. Maintain existing storm drainage throughout construction.